The vineyard - one way street
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Andrew Woodward // 0 threads
There is short one way stretch here - this would be easy to make 2 way for cyclists and is key to creating a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road.
Created by Andrew Woodward // 0 threads
This roads is a one way street that feed into Clifford Ave just south of Chalkers Corner. Clifford Avenue is a nightmare for cyclists and there isn’t an obvious remediation because its not very wide and its the South Circular road. Opening up Kingsway to 2-way cycling would enable cyclists travelling north up Clifford Ave who want to travel east/west on the A316 cycle track to get off Clifford Ave as quickly as possible and avoid the queue up to Chalkers corner. It would also give residents of Kingsway a legal cycle route that does NOT force them into Clifford Ave.
Created by Andrew Woodward // 0 threads
This roads is a one way street that feed into Clifford Ave just south of Chalkers Corner. Clifford Avenue is a nightmare for cyclists and there isn’t an obvious remediation because its not very wide and its the South Circular road. Opening up Somerton Ave to 2-way cycling would enable cyclists travelling north up Clifford Ave who want to travel east/west on the A316 cycle track to get off Clifford Ave as quickly as possible and avoid the queue up to Chalkers corner.
Created by velocipedus@gmail.com // 1 thread
University Technical College (UTC) Cambridge is to be launched at the Long Road 6th From site.
The UTC will open in new build facilities in September 2014 and will deliver a technical education to 670 students aged 14 to 19
It is a collaboration of Cambridge University Health Partners, Cambridge Regional College, Babraham Institute, Napp Pharmaceuticals, Medical Research Council, Wellcome Trust Sanger Institute, Long Road Sixth Form College, Parkside Federation Academies, Cambridge Cleantech, Cambridgeshire County Council, East of England NHS, Anglian Water, The Cube, AmeyCespa
Public Exhibition 11 April 2013
4pm to 8pm
Long Road Sixth Form College
Cambridge Regional College in association with Long Road Sixth Form College, their industry partners and Cambridge University Health Partners are developing designs for an exciting new University Technical College on the Long Road Sixth Form College site.
Project Manager is Laurence Wells
c/o Cambridge Regional College
Kings Hedges Road
Cambridge
CB4 2QT
Tel 01223 418502
Created by Sam Saunders // 1 thread
The barrier where Malago Greenway joins Cotswold Road/Windmill Hill is unreasonably restrictive - not just to tricycles, cargo and trailer bikes but also to baby buggies and mobility aids. The low hoop presents an unnecessary hazard to anyone with less than good eyesight.
Created by christhebull // 1 thread
Alright folks, if we're going to get the whole "Freeways and Greenways" network off the ground than we need to make sure we know what the existing routes are like (as some of us know certain parts of the city better than others). Here is my take on this section of the Frome Greenway:
1) The route is fairly direct and a lot flatter than the road through Stapleton past Colston's School, it is also free of motor traffic
2) Part of the route twists and turns *right next to* a lake and is shared by dog walkers. Whilst I recognise that this is meant to be a relatively leisurely route through a park, we don't want anybody taking an unexpected swim. The path also floods after heavy rainfall.
3) The lakeside stretch is particularly hazardous at light. To cut down on energy costs, movement activated lights could be installed on an ideally re-aligned path.
4) The route loses cohesiveness near the M32 junction. Improvements to the path and to signage are needed to direct cyclists to the Stapleton Road shared use section.
5) One of the bridges is exceptionally narrow (haven't measured, but can't be more than 1 metre) and is only fit for single track use
6) At the gated access off Wickham Glen, there is a passage to the side which is filled with loose gravel which gives poor traction on cycles as well as an open drainage channel which is a trip hazard on foot and bike
Overall the route already has strong potential to form a quality part of the greenway network, but these issues should be addressed as part of the overall network creation.
Created by Sam Saunders // 1 thread
New lights and crossings have been installed and pedestrians have recently been given a much safer way to cross Berkeley Place from west to east. The build-out near the end of Procathedral Lane has narrowed the roadway and made the pedestrian crossing time much shorter than it was. The two traffic lanes heading north east out of Berkeley Place are each now reduced to about 2.9 metres wide, leaving very little, or no space for a vehicle to pass a cyclist or for a cyclist to approach the ASL when traffic is stationary. The upward incline can make this even more awkward for a cyclist who needs to stop and then restart from a position behind or alongside vehicles south west of the build-out.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Monica Frisch // 8 threads
This is an administrative issue to help Cambridge Cycling Campaign keep track of the briefing papers it is producing
Created by Heather Coleman // 1 thread
I'm just working out that it seems hard to start a thread without an issue, and something that doesn't have a specific location (actually, I think having to provide a location for something when not appropriate counts as a bug).
Last Thursday (so Maundy Thursday so the day before the double Bank Holiday weekend), there were people on Riverside between the new Riverside Bridge and the path up to Tesco, doing a traffic survey. I can't think of a less appropriate day to do one (maybe Christmas Eve which is also not a Bank Holiday but might as well be), unless the aim was "to show no-one really commutes along Riverside, and no school children travel along there". As far as I can tell, every state school was having a teacher training day even though their holidays were supposed to start on the Friday, all the private schools were off, there are no students around, and no rowers, and even lots of normal workers were presumably taking a day's holiday judging from how full my place of employment and the general traffic levels everywhere during "rush" hour. The location of this survey is irrelevant, as the data generated, wherever it was, will be irrelevant unless the question was "how little traffic is there on a day when all the schools are closed and lots of people have taken the day off work?".
Is there any logic to when traffic surveys are done? Since they generate data that the Council use to decide on road maintenance, gritting etc, it's important that these data are meaningful.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Created by velocipedus@gmail.com // 6 threads
Travel for Work Partnership http://www.tfw.org.uk/ brings together Chambers of Commerce, Cambridge City Council, Huntingdonshire District Council, East Cambridgeshire County Council, NHS Cambridgeshire, University of Cambridge, Council for the Protection of Rural England, South Cambridgeshire District Council, Cambridge University Hospitals NHS Trust, Cambridgeshire County Council, Cambridge Cycling Campaign.
Within this issue there is place for threads relating to single (major) employers, particular benefits or services, issues, the governance of TfW, the role of public health, parking allocation, best practice elsewhere etc
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by KristianGregory // 1 thread
This is the Mitcham Road cycling blackspot. Part of the LCN, but features a cycle lane in the door zone of parked cars, high speed traffic, many pinch points and a history of incidents including the death of a cyclist.
Martin Lucas-Smith // 1 thread
The entrance to Parker's Piece has been blocked at various points over the last year by thoughtless location of a street-trading van.
Trading in this location should be permitted only further along the path so that conflict between cycles and pedestrians in an already-confined space is reduced.
Created by Simon Nuttall // 1 thread
I've had a report that one of the council's quad bikes has mistakenly sprayed diesel fuel on the section of cycleway between the Jane Coston Bridge along the side of Cowley Road down as far as junction near Milton Road.
These needs checking, but if true will be a news story tomorrow and quite an environmental problem.
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.