Queens St/Princes St loop Consultation
The formal consultation has now been set to run from Tuesday 25th February to Saturday 1st March.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Shaun McDonald // 3 threads
The formal consultation has now been set to run from Tuesday 25th February to Saturday 1st March.
Created by David Earl // 1 thread
Outline application for up to 69 residential dwellings including houses and apartments, open space, landscaping and new access. | Field At Corner Of Coldhams Lane And Hatherdene Close Cambridge Cambridgeshire
New junction onto Coldhams Lane proposed, which includes a central island, the gap on the westbound side is 3.1m, about the worst possible for cyclists.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Created by Peter Lawrence // 2 threads
Please sign my change.org petition http://chn.ge/1epSzpK
Accident CC-23012014-0561 (Incident logged by the Cambridgeshire Police)
Leaving Zoology Department 18.15 walking east on Downing St, north side on 23 January, 2014. Car stopped in Downing st just west of Corn exchange road junction, obscuring the light. Lying on the road was a road sign warning cars of road works further left in Corn Exchange St, a needless warning. This 1 metre road sign had been placed on the pavement, occluding it seriously and had been, presumably, knocked over and left lying on the pavement with its black and invisible legs raised up about 10cm from the surface and its reflective surface tilted away (see picture). I tripped over the road sign in the dark and fell forwards injuring my face and forehead; the metal cut into my right leg. My glasses are destroyed, the leg of the sign tore my shoes.
I was taken to Addenbrookes and treated there. I left there ca 20.30 with head injuries and abrasions and now have an impressive black eye and surround.
I am seeking redress. I am exploring legal action against the County Council whose idiotic health and safety rules (for drivers, not for the rest of us) say that drivers should be warned in advance of even highly visible roadworks (in a 20mph area) and the company responsible for placing such a flimsy and dangerous sign right in the middle of a narrow pavement. Also am anxious that in general people who leave road traffic signs occluding the pavement or creating dangerous obstacles there, should be held responsible and penalised. I see these road signs often as I walk around Cambridge, they should be on or above the road, not blocking the pavement in my opinion.
The next day the same road sign, with my blood still on it, was back in the middle of pavement waiting to be knocked over again and even now forcing pedestrians to avoid it by diverting on to the roadway. I attach a photo of it taken on Friday the day following my accident with a diverted pedestrian on the right.
It was again fallen on the ground waiting to kill someone on Saturday night, presumably following the afternoon storms.
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Charlie Halliday // 1 thread
Proposed off-road cycle path following the A323, Norris Hill Road, to link Fleet with the existing cycle-path from Norris Bridge towards the centre of Farnborough.
It would enable cyclists to avoid Norris Hill Road, an unlit road with speed limit of 60 mph. Once built it would be possible to cycle from Fleet to Farnborough without cycling on roads.
This is in the Fleet Town Access Plan ref. PC9
Created by Jean Dollimore // 1 thread
The image above is an extract from the map published by TfL on 18th Dec 2013; showing the GRID routes in Camden with some of the names of the roads added. We should reply to the documents at:
http://www.tfl.gov.uk/roadusers/cycling/29172.aspx
Deadline 14th February 2014
Created by TMiles // 0 threads
The route marked between Headingley and Armley is heavily used as an intra-urban connector between north west and south west Leeds. Congestion can be particularly acute because it uses one of the few crossing points over the River Aire and the Leeds and Liverpool canal in the west of the city.
The addition of cycle lanes in both directions along the length of this route has the potential to encourage a modal shift from cars and make a real impact on congestion. These cycle lanes would help to establish a more comprehensive network outside the radial routes, and would be a useful on-road addition to the Leeds Core Cycle Network (forming itinerary Ar - W). The proposed route offers connections to the improved cycle facilities on Kirkstall Road (A65) and the future CityConnect facilities.
The addition of cycle lanes would be of particular benefit to uphill cyclists, minimizing their conflict with motorists.
In addition to the environmental, economic and health benefits, the project would improve car-free mobility between three very different communities in Leeds: Headingley, Hyde Park and Armley.
The width of the pavements along the northern sector would allow for a widened carriageway in order to accommodate the cycle lanes. The loss of pavement width would be outweighed by the benefits of calmed traffic. The carriageway of the southern sector is already generous and would make the implantation of cycle lanes relatively straight forward.
Created by Shaun McDonald // 2 threads
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Norwich Road, Vallet Road, and Chevallier Street. This is a major route for people travelling north in and out of the city.
Created by Shaun McDonald // 1 thread
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Felixstowe Road, Nacton Road and Bishops Hill. It's a cross roads with one significant use arm at a 30 degree angle
Created by Shaun McDonald // 1 thread
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Woodbridge Road and Argyle Street. It is a t-junction of which 2 arms are one way and part of the gyratory.
Created by Richard Moss // 1 thread
An umbrella issue for discussion of general matters relating to reviewing planning applications in the city and south cambs.
Created by Hester Wells // 5 threads
The County Council is planning to redesign Tenison Road.
East Parade forms part of the one-way Leeds city centre loop. On the stretch shown it is three-lanes wide, a layout that encourages cases of excessive speed.
The addition of a wide hybrid or segregated cycle lane would improve cycle journeys from the railway station and the south of the city towards the Universities, hospital and north of the city.
Towards the junction with the Headrow the segregated system will end to allow cycles and vehicles to correctly position themselves to turn left or go straight ahead. In this final section the road surface should read, from left to right: (1) cycle lane, turning left (2) standard vehicle lane, turning left (3) cycle lane, straight ahead (4) standard vehicle lane, straight ahead (5 - if space permits) standard vehicle lane, straight ahead. Nevertheless, the layout should allow cycles continuing straight across to adopt their position without conflict from left-turning vehicles. An example of such markings can be seen in Cambridge (Hills Road railway bridge, inbound) or in Nantes (http://www.flickr.com/photos/cyclable/9526360512/).
Provision for delivery vehicles should also be considered here, as the left hand lane is frequently occupied by vans or lorries under the current system. To avoid conflict with cyclists, it would be most sensible to site such parking to the right of a segregated cycle lane.
The project would bring additional traffic-calming benefits, with the reduction of the road width to two lanes along much of its length.
Created by TMiles // 0 threads
The width of the road after the traffic lights lures south-west bound cycles into a left position that becomes problematic because of the build-out at the later pedestrian crossing. They either have to stop to let traffic pass through this pinch point or take the risk of readjusting their path to the right in order to join the main stream of vehicles.
One solution would be to guide cycles into the correct position with cycle lane markings from the traffic lights to the pedestrian crossing.
The second solution would be to cut a cycle-lane across the build-out, including a mini pedestrian crossing that cyclists would have to respect. This short stretch of lane should be flush with the road surface and must be kept swept regularly in order to be effective.
Created by Shaun McDonald // 1 thread
The cycle lane on NCN1 on Stoke Park Drive are rather narrow, thus you cannot cycle within the cycle lane. Having the cycle lane there means drivers often don't give as much space when overtaking. There are also many traffic island pinch point which make it extremely dangerous, as drivers overtake and cut in just before the island.
Created by MJR // 1 thread
"The adopted Core Strategy designated South East King’s Lynn (this area) as one of the strategic ‘urban expansion’ areas around King’s Lynn. The independent planning inspector who examined the Core Strategy explicitly stated that, compared to the potential alternatives, the expansion areas identified (including South East King’s Lynn) were preferable to the alternatives in meeting the Borough’s need for substantial numbers of additional dwellings over the plan period. It is relatively unconstrained by flood risk and infrastructure problems, etc., and relatively easily accessed and serviced.
5.2.4 Policy CS09 of the Core Strategy, ‘Housing Distribution’, provides for an allocation here of at least 1600 new homes, with supporting infrastructure. It also identifies this as establishing a direction for future growth beyond the plan period (i.e. beyond 2026). From the sites put forward during the consultation, informed by the work of the Prince’s Foundation for the Built Environment in connection with the Neighbourhood Plan (see below) a total of 3,000 to 3,500 additional dwellings could be accommodated in the fullness of time. This is indicated diagrammatically in figure 7 of the Core Strategy.
5.2.5 This is likely to be the largest residential development opportunity in the Borough for many years. It provides a once-in-a-generation opportunity to form a thriving and vibrant new community immediately south of King’s Lynn. The intention is to integrate a large number of new homes and associated facilities with an existing village community, generate a range of major improvements in a range of areas, and shape a place that promotes a sense of community among its residents, existing and new." (From the Borough Council KLWN, "Preferred Options for a Detailed Policies and Sites Plan", October 2013)
Created by Kevin Ablitt // 0 threads
The west bound ( out of town ) on-road cycle lane is extremely narrow. As are the motor vehicle lanes to accomodate eastbound bus lane. There is plenty of space on verges etc to improve this facility but may mean moving lampposts etc.
Created by Kevin Ablitt // 1 thread
Very narrow carriageway and very narrow footpath on one side only ( I have seen a woman struck on the shoulder by a bus mirror on this route).
High number of pedestrians and cyclists at peak times, poor visibility and abrupt hill make this a very dangerous route.
Created by Kevin Ablitt // 0 threads
Very narrow and winding. This section of Stone Lodge Lane should be considered for reduced access, one way, filetered permeability or complete closure to motor vehicles.
http://www.ipswichstar.co.uk/news/ipswich_child_injured_after_collision_on_stone_lodge_lane_1_3211524
This isnt the first such incident.
Created by Matthew Phillips // 2 threads
The Mount Oswald development received outline planning permission a while ago. A full application has already gone in for the first phase, at the southern end of the site. It appears connections will be provided for cyclists and pedestrians to the A167 (car access is from South Road). The greater concern is whether an opportunity is being missed to create a new off-road route parallel to South Road.
The picture is taken from the Design and Access Statement of the planning application for the first phase. The big unknown is the middle area, where the large self-build houses will be. No plot divisions are shown on the plan. Will there be public access north-south through this area?
South Road is not shown as a strategic cycle route in the County Durham Plan. The Mill Hill Lane route and the A167 are accorded the status of primary routes, but there is not even a secondary route along the South Road axis, despite it being the obvious route to the University from the south and from all the new housing on Mount Oswald.
Created by Matthew Phillips // 1 thread
The cycle path across the top of the golf course has no barriers at either end but does not seem to suffer from abuse by motorcyclists. However at two or three locations along the path there are staggered half-barriers on paths which lead to the housing estate to the north.
Barriers like this cause problems for longer cycles, such as tandems and recumbent cycles, as well as for families with child trailers or tag-alongs. Such barriers should preferably be removed and we need to seek to ensure that new developments do not introduce further barriers.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Martin Lucas-Smith // 2 threads
This junction has a new cycle lane over a widened pavement. This looks like very substandard infrastructure, encouraging pavement cycling, that should never have been approved by the County Council.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Nicola Peck // 1 thread
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.