Crossing Cove Road
At certain times of day it is difficult to cross the road and connect the cycle and pedestrian routes between Southwood and the Cove Brook Greenway
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Sarah Wood // 0 threads
At certain times of day it is difficult to cross the road and connect the cycle and pedestrian routes between Southwood and the Cove Brook Greenway
The Greater Anglia franchise is due for renewal in October 2016 and the process has already started. It is quite unsusal to have a station serving such a large number of passengers with access on only one side o the tracks. This situation leads to many more and longer car journeys along Mill Road, Cherry Hinton Road and Hills Road.
There is an existing access via (non-residential) Clifton Road to the east side of the station and there is vacant land. We need to argue the case for an eastern entrance to the station, along with cycle parking and pedestrian access. There is a mainly empty car park on the other side of the tracks. We should also try to include a link from the Carter bridge to the new cycle park.
Interested parties
3 shortlisted franchises
local MPs
Minister responsible (Clare Perry MP)
Created by Jon G // 1 thread
The road outside the Barmy Arms pub, Twickenham Embankment, used to be closed to motor traffic by a single line of posts with cycle logos painted on the road between two of these, clearly showing there is a cycle route there.
Recently this has been replaced with two lines of posts about 3m apart and there are no cycle route markers. This is leading pedestrians to reasonably assume that the area between the posts is for pedestrians only and to stand there in groups with drinks from the pub, creating conflicts with cyclists trying to ride through the area. The existence of the cycle route should once again be indicated by signs or painted cycle symbols.
Created by Jon G // 1 thread
The Embankment, Twickenham is a two-way street. Many driver sseem to think it is one-way Westbound. Even the Cyclescape map wrongly marks it as one-way! It needs signage clarifying it is two-way, to avoid motorists being obstructive or abusive to cyclists lawfully riding Eastward along it.
Created by Jon G // 1 thread
Bell Lane is two-way. Most drivers using it go Northward and many seem to think it is one-way that way. It needs signage clarifying it is two-way, to avoid motorists being obstructive or abusive to cyclists lawfully riding South along it.
Created by Jon G // 1 thread
Cricket Lane is a dead end and therefore two-way. Since an exit from a car park was built leading into it, many drivers seem to think it is a one-way street from the car park. In fact it is used by cyclists going in both directions between High St and Bushy Park.
It needs signs clarifying that it is two-way, as drivers are being obstructive or abusive to cyclists legitimately using it.
Created by David K // 1 thread
At present this is a footpath but it could be widened onto the land owned by Network Rail in order to allow a shared use path.
Created by Richard Taylor // 1 thread
Proposal for three new pedestrian and cycle access points to Cambridge Business Park. The proposals are being made in light of the plans for an new station nearby.
Representations from companies with premises on the business park - Redgate and Autonomy - have expressed concerns about security and the potential for people to try and park on the business park and then get on a train.
The proposals are for the new accesses to be gated to restrict general public access.
The proposals include a connection to the potential cycleway along the line of the disused railway.
Cambridge Business Park Cowley Road Cambridge Cambridgeshire CB4 0WZ
Cambridge
Application reference: 15/0919/FUL
Created by Violinist John // 1 thread
Noticed this a couple of weeks ago. As you will see the sign is incomplete and misleading given that the place to see all the details is the end of Ferry Lane waiting to join High Street. High Street at this point is both Route 51 and Route 11.
Major points:
Left turn to go to Impington on Route 51 - I think not.
Abbey and Fen Ditton to the left when you could just go back across Green Dragon bridge.
No directions to Histon, Milton, Waterbeach probably others.
Also the lack of any idea where route 11 goes to the right.
This appears to be one of a number of new signs that have recently appeared. If anyone has seen any more let's get the info out there and try to get them fixed.
Created by Iain Lane // 1 thread
Some new lamp posts have been installed on the pedestrian side of this split ped/cycle path. This reduces the effective width of the path and creates conflict.
Created by Katja Leyendecker // 0 threads
Council is planning changes on parts of Heaton Road
http://www.newcastle.gov.uk/parking-roads-and-transport/cycling/strategic-cycle-routes/improvements-heaton-road
Discuss your thoughts and ideas here!
Created by Roxanne (CEO) // 3 threads
Relocation of the existing liquid nitrogen (LN2) tank, Denios unit and cycle parking facilities.
Department Of Chemistry Lensfield Road Cambridge Cambridgeshire CB2 1EW
Cambridge
Application reference: 15/0988/FUL
NOTE:
Introduction of two tiered cycle parking to maintain the same number of parking spaces.
Richard G // 1 thread
A new research institute is planned for the Addenbrookes campus, plans are due to be submitted within a few weeks
There has been a exhibition of the overall plan & I have concerns about the cycle parking provision
Just wanted to report a collision on 1/6/15 at about 1700 between myself and a car in Cambridge.
Travelling South on Trumpington Road, turning into Fens Causeway I was hit by a car travelling North at the roundabout. There are three lanes of traffic heading north, the outmost car gave way correctly but the car in the second lane for whatever reason chose to accelerate onto the roundabout and hit me square on. I heard the noise of a revving engine, turned and watched the car drive straight into me. I felt the bonnet of the car as it hit and heard the sound of the impact, have a vague recollection about spinning through the air then hitting the tarmac. Although I was wearing a helmet it didn't help as I landed on my right buttock, back and leg.
Fortunately there were several witnesses including medically trained people who left their cars to help; the driver of the car involved remained in his car.
The police took about 25 minutes to arrive and the ambulance about 10 minutes after that.
I have nothing but praise for everyone who stopped and helped, the police, the paramedics and the A&E staff at Addenbrookes. The driver of the car knows what I think of him as I was quite vocal when he tried to get involved. He apparently told the police that I had 'cut the corner' of the roundabout. I'm not sure what he meant by this, nor was the police officer.
I count myself very lucky. Although I've been off work since the collision, I have no broken bones - just serious bruising, a lot of pain in my back and hip which I'm assuming will go away eventually. The ironic thing is that I'd been cycling from Melbourn to Hills Road since the previous week up and down the A10, and had decided to try a different route over Chapel Hill as I thought it might be safer.
I'm curious though, does this junction not have a history of collisions? I can recall seeing at least one there myself in the past. What is the recommended route for cyclists travelling this route?
I took the advice of the Campaign website and contacted Cycleaid for legal advice. I'll report back the outcome as things progress if anyone is interested.
BTW not sure how to draw a route on the map AND mark the collision point, so I've just done the latter.
By-election for the Romsey Division in June 2015
Martin Lucas-Smith // 1 thread
The University has published initial plans for a Masterplan for the West Cambridge site, which will see further extension towards the M11.
https://www.admin.cam.ac.uk/reporter/2014-15/weekly/6387/section6.shtml#heading2-11
Created by Robin Heydon // 1 thread
Extension to foodstore
ALDI Unit 1 157 Histon Road Cambridge Cambridgeshire CB4 3JD
Cambridge
Application reference: 15/0914/FUL
Created by Shaun McDonald // 1 thread
There is a footpath linking London Road to Columbine Gardens and Lupin Road, which has a series of barriers. Removing the barriers, ensuring there are dropped kerbs are on Columbine Gardens and Cowslip Close. Signs need to be added to sign post the route to the town centre, London Road, and appropriate other places.
This would mean that there would be direct link from Chantry on to London Road and into town along a potentially safer route than Gippeswk Avenue/Birkfield Drive.
Created by Rosie Downes // 1 thread
First consultation on the main scheme: 26 May to 31 July 2015
Second consultation on amendments to the scheme: 22 February to 20 March 2016
Created by Shaun McDonald // 1 thread
The A92 here has some very fast traffic. Considering this is the flagship National Cycle Route 1, and there is already a cycle path of part of the way between these 2 junctions. It would be much better if this cycle path was continued to the next junction, with some crossing aid in the form of traffic lights, bridge or tunnel. This would open this part of the route to a wider range of participants, as it would be significantly safer.
Created by Al Storer // 2 threads
The County Council have launched an initial consultation on improvements to Queen Edith's Way and Cherry Hinton Road (Hills Road to Mowbray Road). Very positively, what they're asking about is separated cycling facilities and bus stop bypasses. The devil will be in the detail as always, but the principle is good
http://www.cambridgeshire.gov.uk/site/custom_scripts/cons_details.aspx?ref=367
Created by Ross // 1 thread
Richmond Hiil and Ormond Road provide direct routes into Richmond town centre. However they are one way and force cyclists to take detours to get into town. Making these roads 2 way for cycling with contraflow cycle lanes would improve movement for cycles and remove some conflict which exists where cyclists ride on the pavement.
Created by Ross // 1 thread
Cycling around Richmond town centre is tortuous on a bicycle due to the one way system. To encourage even greater cycling journeys to Richmond town centre business the one way system should be redesigned to allow 2 way cycling for bicycles on Eton Street, Paradise Road and George Street. Ideally this should be achieved with segregated cycle contraflows
Created by Ross // 1 thread
Make Priests Bridge in Barnes - 2 way for cycling. Facilitate easier and shorter cycle journeys and link more effectively into LCN 37 and 4. Encourage cycle traffic of the busy A205.
Created by Rohan Wilson // 1 thread
Sustrans invites comments by 30 June on its draft chapters of a "Cycle-friendly Design Manual".
This document, once published, could influence local authorities to provide better, safer cycle routes, and so persuade people who are not yet cycling their every day journeys to do so.
Your comments please to designandconstruction@sustrans.org.uk by 30 June.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Matthew // 2 threads
On 1 January 2026, historic routes in England that aren’t properly recorded will be lost to the public forever. We are looking for people to volunteer their time to help us identify and register these routes before it is too late.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Stephan Matthiesen // 1 thread
The chicane at the west end of the Magdalene Glen path interrupts the flow when going uphills, particularly unpleasant for people with weak knees. It also forces cyclists uphills often to stop and start when there are other people going through, as it's not wide enough to pass.
It doesn't serve any useful purpose at it is on the top of the slope where cyclists are very slow anyway. As it's uphills, there is little danger that e.g. kids run out onto the wide pavement of Duddingston Pk South. Cyclists from the West are slow at this point anyway as they turn into the path.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.