Abdon Avenue - Bristol Road Link
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
This road has been left with a hopelessly outmoded junction geometry, with huge radii and a simply breathtaking width. It's so bad that it's not unknown for oncoming vehicles to pass "continental style", because a perfectly reasonable path turning right into the close will take you way over to the right of anyone making a right turn out of the close (note there are no white lines to provide road positioning guidance). This would in fact make a great cycling link from Cob Lane into the park. There is ample room to create a cycle path and a crossing with a central refuge, and make the junction safer and less bizarre for motorists. Instead the city council has elected to take cyclists on an unlit shared path the same width as a bike, across an informal crossing upon which cyclists are instructed to dismount, and along a footpath.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
This path has been built recently as part of the Merritts Brook Greenway walking and cycling route. It would be quite useful were it not narrow, twisty, and covered in loose chippings. As it is, it is all but useless for cycling, so it needs to be rebuilt properly.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Jean Dollimore // 2 threads
N-S Cycle Superhighway consultation
------------------------------------------------------
TfL proposed that the N-S Cycle Superhighway should stop at Greville Street but LCC's response to the consultation stated that the route should continue on Farringdon Road to at least the junction with Calthorpe and Margery Street (under discussion here).
After the consultation TfL replied that they would explore options north of Stonecutter Street(which is actually south of Greville Street!). The N-S Cycle Superhighway may be completed by Spring 2016 but we have no date for it being extended any further north.
Link to our discussion on CycleScape
http://camdencyclists.cyclescape.org/issues/1407-the-tfl-north-south-cycle-superhighway-consultation
=========
Junction Kings Cross Road/Farringdon Road/Calthorpe Street/Margery Street
---------
See consultation on TfL's website at:
https://consultations.tfl.gov.uk/cycling/kings-cross-road
which has a link to their junction plan
Plan to build September 2015
-----------
TfL's proposals include the following:
On Farringdon Road - Grays Inn Road
- right turn pocket for northbound cyclists turning into Margery Street
-1.5 m advisory cycle lane on Kings Cross Road for cyclists travelling southbound with one instead of two motor lanes and on northbound carriageway north of the junction
- footway build outs
Calthorpe Street
- longer ASL and low-level early release signals
- footway build out
Margery Street
- widen contraflow
- longer ASL box and low-level early release signals
Immediate issues:
- no space for cycling on Farringdon Road south of the junction
- northbound approach on Farringdon Road left hook issue
- no attempt to provide protection for cyclists crossing the junction; Farringdon Road is wide enough to put in the infrastructure needed for a separate signal stage for northbound cyclists or for "hold the left turn".
- the early release signals are only as effective as a longer ASl box, not protecting cycles that arrive during the green stage.
Dates: consultation 20 February 2015; reply due 6 April 2015.
Created by Dawes Jaguar // 0 threads
The layout here makes crossing from Victoria Common to St Joseph's Avenue awkward on this proposed cycle route: http://www.pushbikes.org.uk/location/northfield-3. It would benefit from some minor attention.
Created by Dawes Jaguar // 0 threads
This footpath needs to be improved and made shared use for this proposed cycle route segment: http://www.pushbikes.org.uk/location/northfield-3
Created by Dawes Jaguar // 0 threads
This short section of scruffy footpath completes this proposed cycle route segment http://www.pushbikes.org.uk/location/bournville-1 and links it with the Merritts Brook Greenway. Since the path is in such a poor state I would suggest updating it to create a cycle path and footpath, the two being made flush with the existing carriageway.
Created by Dawes Jaguar // 0 threads
This puffin crossing is a barrier to creating a cycle route: http://www.pushbikes.org.uk/location/bournville-1. I've attached a photo, because despite it being a random Google Street View shot it shows there is a demand for cycling.
Created by Dawes Jaguar // 0 threads
The footpaths on the Davids Estate provide permeability for pedestrians, but not cyclists, yet one of them would allow the creation of a quiet route for cyclists: http://www.pushbikes.org.uk/location/bournville-1 (the other just links that route with The Davids). Making the paths shared use to lift a barrier to cycling.
Created by Donald Noble // 0 threads
It would be good to have a dropped kerb near here to allow southeast-bound cyclists who have used the road/bus lane to rejoin the cycle path without having to go onto the A90 slip road to rejoin at Crammond Brig
Created by Dawes Jaguar // 0 threads
Cycling is banned on Victoria Common, but it represents the sort of environment in which people love to cycle. In the short term the paths should be made shared use, but longer term it would be sensible to create cycle paths through the park.
Created by Dawes Jaguar // 0 threads
If this path was made shared use, cyclists could use it to connect the official cycle route on Heath Road South with Northfield town centre via Chatham Road and Rochester Road (there is a toucan crossing that takes cyclists across Church Road).
Created by Dawes Jaguar // 0 threads
Maas Road used to be two way, and was a quiet road upon which cyclists could bypass the motorised traffic that has been allowed to totally dominate Northfield High Street. Then it was turned into a two-lane, one-way rat run, and became a barrier to cycling. It should be restored to two-way for cycling.
Created by Stephan Matthiesen // 1 thread
The entrance is very decorative but has a really narrow corner, so it is difficult to negotiate by bicycle when you've been shopping, and impossible for trailers. There is a desire line (mudpath) next to it, this could be converted to a proper path.
Created by Stephan Matthiesen // 0 threads
The footpath has a very bad surface, and should also be a little bit wider.
Created by Stephan Matthiesen // 1 thread
A walking/cycling connection between Summertrees court and Gilmerton Rd would make the route to the bus stops, to St John Vianney and generally between the two halves of the Inch much shorter, encouraging walking.
Created by Stephan Matthiesen // 0 threads
This path is often quite muddy. It is gravel and resurfaced every year or so.
But it's a very busy walking and cycling connection between Inch and Craigmillar, and the gravel just doesn't last very long.
Not sure what to do. It would be a shame to convert it to tarmac, but perhaps there is some surfacing option that lasts a bit longer.
Created by Stephan Matthiesen // 0 threads
Make dropped kerb where the footpath from Ravenswood Avenue meets the Old Dalkeith Rd. This would make it possible for cyclists on Old Dalkeith Rd to dismount here and walk over to Ravenswood Av.
Created by Dawes Jaguar // 0 threads
A bi-directional cycle path here would link Langleys Road (a quiet road that leads down into Bournville Village and beyond) with Katie Road (another quiet road that links with the BCR route on the Worcester and Birmingham canal). Cyclists would cross Oak Tree Lane using what is currently a puffin crossing (suitably modified to promote sustainable transport). There is a huge amount of space here, currently largely used for pavement car parking.
Created by Stephan Matthiesen // 0 threads
Add a dropped kerb at the bottom of Kirk Brae so that people on bike can dismount easier and push if they don't feel like struggling up the hill.
Created by Stephan Matthiesen // 0 threads
Dropped kerb at the end of the cycle lane southbound, so that people on bikes can get off and push.
At rush hour it is usually impossible to merge into and keep up with the motor traffic uphills, many cyclists dismount here and walk to the pedestrian crossing.
Created by Stephan Matthiesen // 1 thread
Often a lot of parking on the grass, in laybys etc., especially during sports event, but also other days.
There is a small parking area in front of the Sports Centre, mainly disabled bays, and a large car park in front of Inch House.
The council has over time added more and more grasscrete areas on the eastern part of the road for about 12 cars, I've been told they were not in the original planning permission.
The provision of parking attracted more and more drivers into the park as there is now an expectation that one can park close to the sports centre, this has become the norm rather than the exception (for people with disabilities, deliveries etc).
Needed are
- bollards along the road to protect the grass
- clear signage
- reduce the parking spaces within the park to the minimum to discourage drivers.
Created by Stephan Matthiesen // 0 threads
Remove the steps and the guardrails to make a connection for bicycles (and buggys and wheelchairs).
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
this old fashioned barrier on a major cycleway needs a rethink
Created by North Devon Cycling Forum // 0 threads
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
Created by Simon Still // 2 threads
For pedestrians
Relocate the crossing at the junction. At the moment pedestrians on the eastern side of Streatham High Road cannot see oncoming traffic around the bend and vehicles cannot see people crossing. By relocating the crossing that is currently north of the junction on Streatham High Road to where demand is higher and making it a straight-across signal-controlled crossing we can make it safer for all road users. This relocated crossing would replace the existing unsignalised crossing on the southern arm of the junction where there is significantly lower demand
Create a raised imprint block-paved effect crossing on Gleneldon Road indicating to drivers that pedestrians are likely to be crossing making it easier and safer for people approaching the relocated crossing.
For cyclists
Cycling would be permitted in the proposed bus lane on Tooting Bec Gardens (see below).
For bus passengers
Introduce a bus lane on Tooting Bec Gardens approaching the junction by removing some parking. 15 high-frequency bus routes pass through the junction. Delays resulting from the new crossing would be mitigated by a new 170 metre bus lane on Tooting Bec Gardens approaching the junction. There are often gaps in the parking so the proposal minimises the overall loss of parking spaces and makes more efficient use of the space (see the drawing for the location)
Ban the right-turn into and out of Shrubbery Road on Streatham High Road. Northbound buses are currently delayed by vehicles turning right into Shrubbery Road, approximately 150 metres north of the junction, because of a short right-turn pocket in the road. We therefore propose to ban the right-turn from Streatham High Road into Shrubbery Road for all traffic. There would also be a longer right-turn pocket to allow vehicles to queue without blocking traffic when turning into Sunnyhill Road. Vehicles turning right out of Shrubbery Road can also delay southbound traffic including buses so it is proposed that is banned too. Before we make the banned turns permanent we would monitor congestion and bus delays to confirm if it is necessary to mitigate the impact of the relocated crossing and making it controlled and will publish our findings
We would need to extend the right-turn ban from Mitcham Lane into Streatham High Road southbound to include buses. This wont have an impact on bus passengers as this turn is only used by buses 'not in service'. By fully banning the turn we reduce the traffic impact of the relocated crossing and making it controlled.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by Jack Thurston // 0 threads
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
Created by Clare Rogers // 17 threads
Enfield Council through Cycle Enfield are seeking views from the public on a number of ideas for the area shown in the map. In their words:
"We have a number of ideas that will not only help more people to walk and cycle but will also enhance community spaces, making Haselbury Neighbourhood a better place to live. Help shape our designs before we carry out a consultation later in the year. You have until Sunday 1 July to share your views."
***Note that there are separate threads below for each of the 13 drawings***
THESE DESIGNS ARE NOW REVISED FOR THE STATUTORY CONSULTATION
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here where the tram lines curve across Sheffield Road to the Birley Moor tram stop. The rails cannot be crossed at right angles.
There is loads of open space around here where off road cycle paths could be installed.
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Simon Still // 3 threads
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
Created by JonC // 2 threads
Blake Hall Road is an important and pleasant north-south route for cyclists and is often used by groups avoiding the busy roads in North Weald and in Ongar. However, crossing the A414 can be very difficult due to fast moving traffic from both directions.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.