Ponding
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Iain Lane // 1 thread
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
Created by Iain Lane // 1 thread
The city council received a £6.1m grant from the D2N2 LEP to construct 4 radial routes. This is the first, a mixture of a physically segregated and a shared route.
I use this route twice every day and the cycle lane is always blocked by cars parked to use the shops or hotels on this street.
It makes the cycle lane pointless as I can't use it.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Richard G // 1 thread
There seems to be a number of cars parking half in the cycle lane on the new Addenbrooke's road (Dame Mary Archer Way)
Is parking in a cycle lane an offence of some sort, and would it make a difference on what I think is a private road? (I think that those roads around Addenbrooke's are not normal in terms of ownership)
Vegetation breaking through the surface of a, basically brand new, shared use path surface at Smeaton Bing.
Created by Jenny Barnes // 2 threads
If the level crossings either side of farncombe station were cycle/ ped only, with bollards in nightingale rd at the farncombe street end, and on frith hill, farncombe would be divided into 3 areas for cars, each of which would need to come out onto distributor roads. Further, if the New pond rd end of summers Rd as far as Brioadwater school were made one way southwest bound, any traffic trying to bypass the a3100/ Meadrow would be unable to.
Access Walden is a campaign group based in Saffron Walden.
Their objective is to create a safe walking and cycling link between their town centre and Audley End railway station, a journey of two miles.
Created by Bracken VanRyssen // 1 thread
The Brook Lane road badly needs cycle infrastructure and there is definitely the space available and small changes here have the potential to have a big impact on the route. Easy changes would be to resurface and open up the ends of the Brook Lane service road to allow continuous movement along it, as well as putting in a crossing for the Yardley Wood road. On the easterly section a protected bicycle lane for cyclists ascending and descending the hill could be created by moving the parking in the left lane further away from the pavement and using the resulting space (especially important for cyclists travelling up the steep hill).
Created by Roxanne (CEO) // 1 thread
The path running in front of Petersfield Mansions (identified below in red) is only 1.2m wide. This means that when passing each other pedestrians and cyclists often have to use the grass which is problematic when it is wet and muddy. It is also difficult for residents of Petersfield Mansions when exiting their properties as there is very little space for people to manoeuvre around each other.
Usage of this path has increased over the years with more cyclists using the path to access the cycle racks which have been installed on Bradmore Street as part of the expansion of Anglia Ruskin University. It is therefore proposed to widen the path by 1metre to cater for this increased usage and to improve access from Mill Road with the removal of a short section of railing and the installation of a flush kerb.
Petersfield is owned by the City Council and the path in question is maintained by the County Council as highway.
The cost of these works is approximately £20,000 and this project will be joint funded by Cambridge City Council and Anglia Ruskin University.
The path marked in blue is maintained by the City Council and we hope to improve the surface of this path at the same time if funding can be identified.
If you have any comments regarding the widening of this path or would like more information please contact cyclingconsultations @ cambridge.gov.uk by 14th September 2015.
Anon // 1 thread
KCC consultation on reduction in speed limit to 40mph
http://consultations.kent.gov.uk/consult.ti/40mphspeedlimitheadcorn/consultationHome
Consultation closes 28 Sept 2015.
Created by Dexter Johnstone // 1 thread
Weston Street is an advisory cycle route and should link up with the University of Sheffield concourse. However, it does not and you currently have to cross 3 lanes of traffic. The road is often very busy. There should be a toucan crossing instead of the pedestrian crossing, a short off road cycle path across the large grass verge could link the crossing to Weston Street.
Created by Chris Paton // 0 threads
City of Edinburgh council have done good work trialling a segregated path for NCN1 on George Street. Although the trial is coming to an end it's clear from their documents and consultations that George Street will remain the primary east-west route for cyclists travelling through the city centre and more investment is planned.
The problem is that there is very poor access to this route from the West End for any cyclists who have come along Shandwick Place or Rutland Square (including cyclists from the big offices nearby). Heading east, cyclists have to go through the busy West End road junction and then brave cars sweeping into South Charlotte Street as they turn left while simultaneously needing to find a way across two lanes of traffic to the middle of the road to turn right onto George Street -- scary stuff even for a competent cyclist.
Space is always at a premium but there do seem to be options for improving this with minimal loss of road space. A two-way cycle path could be constructed across the paving to link Hope Street with Rutland Place. With careful design this could be done to minimise impact to the pedestrian space and with reconfigured light timings cyclists could emerge from Hope Street to turn left or right, and likewise cyclists from Shandwick Place and Princes Street could turn into the new path. In addition, a left turn strip at Lothian Road onto Rutland Place would provide access to this new path for cyclists from Rutland Square and Lothian Road.
Created by Bracken VanRyssen // 1 thread
The only cycle access to the train platforms at Solihull station is an extremely small lift, otherwise your only option is carrying your bicycle up and down the stairs which can be quiet challenging. A simple solution would be a wheeling rail at the edge of the stairway to guide wheels down slowly. I see quite a few people with bicycles using the train and I myself do so on a weekly basis and two flights of stairs with a laden bicycle certainly make things tricky.
Created by WildNorthlands // 1 thread
Generally I'd say Brunswick St works well as a bike route but the gate between these two roads and the junction is poorly placed - in order to get through it you need to be on the wrong side of the road on a blind bend and it is common to find yourself coming head to head with a car coming the other way. if there were too gates for each direction, and the northbound was lined up with the cycle lane, it might help.
Created by Dominic Fee // 1 thread
Westminster City Council is undertaking a statutory consultation on the Traffic Management Orders (TMOs) needed to implement the East West Cycle Superhighway at Parliament Square. You can find a description and drawings of the proposals here:
http://westminstertransportationservices.co.uk/tmo/tmo_details.php?tt=2&id=909&cid=1
In Westminster Cycling Campaign we rarely respond to statutory TMO consultations because the proposals are either insignificant or, if they are significant, they've usually been subject to an earlier public consultation. It would be inappropriate for us to repeat points we've made previously, and we wouldn't be listened to.
Nevertheless I would encourage interested people to take a look at the Parliament Square drawings to check that the earlier design has been taken forward properly into a detailed design for construction. We have had a recent example where we did respond to a statutory TMO consultation in which the connection between part of the EWCS proposals (Savoy Street) and the rest of the highway network (a left-in left-out junction on the Strand) hadn't really been thought through. If we need to submit a response regarding Parliament Square, the deadline is 21 September 2015.
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Single storey front, side and rear extensions.
58 Willingale Road Loughton Essex IG10 2DB
Epping Forest
Application reference : EPF/1025/15
Created by Heather Coleman // 4 threads
I can't find anywhere sensible to put such things so this is a general issue for people to start specific threads pertaining to temporary closures.
Created by Donald Noble // 1 thread
A barrier has been erected when the NCN7 cycle path joins the A86, presumably to stop children from cycling onto this busy road. However, this blocks the dropped kerb at this location, and no alternative is available without cycling some distance into Kingussie on a footpath which is not marked as shared use.
The barrier also limits the entrance to the cycle track, which could make it difficult for people with trailers or alternative bikes
Phil Wigglesworth // 1 thread
They're building lots of flats off Rustat Road, which is on a major cycle route and also is the main area for freloading railway station users.
There are some issues with control of the building work, specifically:
- trucks blocking Fanshawe and Rustat Road at peak times causing dangers to cyclists
- mud on the road making the Fanshawe/ Rustat road junction dangerous
Created by Roxanne (CEO) // 1 thread
Outline application for the demolition of existing industrial and office units and 5 dwellings and the erection of up to 90 dwellings, together with associated garaging, parking, public open space, landscaping, access, highways drainage and infrastructure works. All matters reserved except access.
Created by Roxanne (CEO) // 1 thread
Demolition of Daedalus House and construction of a new 7 storey office building comprising of 9026 sqm (GEA) of office floorspace (class B1); cycle parking spaces; associated plant; hard and soft landscaping; a basement with 51 car parking spaces and 7 motorcycle bays; infrastructure works. | Daedalus House Station Road Cambridge Cambridgeshire CB1 2RE
Created by Jean Dollimore // 1 thread
Official title: "CENTRAL LONDON CYCLE GRID - PRATT ST AND DELANCEY ST PROPOSED WALKING AND CYCLING IMPROVEMENTS"
This consultation proposes the construction of an important two-way east-west cycle route across Camden Town.
It will run from St Pancras Way along Pratt Street, across Royal College Street to Camden High Street, where a two-way cycle crossing will be provided.
It will then run two-way along Delancey Street as far as Mornington Terrace.
A later consultation on the continuation of this route to Regents Park is promised.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Matthew // 2 threads
On 1 January 2026, historic routes in England that aren’t properly recorded will be lost to the public forever. We are looking for people to volunteer their time to help us identify and register these routes before it is too late.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Stephan Matthiesen // 1 thread
The chicane at the west end of the Magdalene Glen path interrupts the flow when going uphills, particularly unpleasant for people with weak knees. It also forces cyclists uphills often to stop and start when there are other people going through, as it's not wide enough to pass.
It doesn't serve any useful purpose at it is on the top of the slope where cyclists are very slow anyway. As it's uphills, there is little danger that e.g. kids run out onto the wide pavement of Duddingston Pk South. Cyclists from the West are slow at this point anyway as they turn into the path.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.