Bicycle parking
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by Stephan Matthiesen // 0 threads
Roundabout needs cycling and pedestrian provision, extremely difficult to turn right from Newcraighall Rd or cross from B&Q to Fort Kinnaird.
Created by Stephan Matthiesen // 1 thread
Terrifying stretch of Gilmerton Rd around Robin's Nest needs complete overhaul. Pinch points, blind corners, parking, cratered surface, and school exit, also on a hill where cycling and driving speeds vary a lot.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Stephan Matthiesen // 0 threads
A new path between Cameron March and Crawfurd Rd would be an enormous improvment as it would allow cyclists coming from Old Dalkeith Rd and Peffermill Rd to avoid Lady Rd (steep uphills, no cycle provision, much traffic) or Dalkeith Rd (steep uphills, no cycle provision, much traffic, plus parking).
This path would also connect naturally to the strange cycle path on the inside of Cameron Toll that just ends on Lady Rd. with a "cyclist dismount" sign.
Created by Stephan Matthiesen // 1 thread
Guardrails on W side of the toucan are unnecessary, restrict the footpath & lead to conflict between pedestrians and cyclists. They also block part of the dropped kerb.
Created by Stephan Matthiesen // 1 thread
No way to get a bicycle through these chicanes.
Created by Stephan Matthiesen // 0 threads
Important connection to get from Gilmerton Rd to Liberton Rd/Mayfield Rd/Kings Buildings, but road surface is badly cratered with some deep holes in blind corners.
Created by Stephan Matthiesen // 0 threads
Remove the railings at the steps, unnecessary street clutter that narrows the pavement and makes crossing Old Dalkeith Rad more difficult.
Created by Stephan Matthiesen // 0 threads
Dropped kerb needed at the end of Ravenswood Avenue, so that bicycles can get to the footpath that leads to the toucan.
Created by Stephan Matthiesen // 1 thread
The footbridge has lot of steps, even though it is a shallow ramp; apparently the designers did not expect that people with bicycles, wheelchairs, buggys or trolleys might ever want to use the bridge.
Created by Stephan Matthiesen // 0 threads
The Range supermarket has no cycle parking at all, and no railings or other things to lock a bike to. I usually lock it to a couple of shopping trolleys, but I'm sure that's not what the shop prefers.
Created by Stephan Matthiesen // 0 threads
Build a path (steps and alternative ramp) from the bus stop in Liberton Road to the Shopping Centre.
This would be an ENOURMOUS improvement for shoppers who use the bus, as currently you have to walk all the way to Gilmerton Rd and back across the car park.
The path would enable cyclists to avoid the busy and fast Lady Rd roundabout to get into the car park.
Created by Stephan Matthiesen // 0 threads
The underpass of Innocent under Milton Link is very dark (even during day); particularly unpleasant/dangerous as the path surface is badly damaged, cracked and uneven, and very often rubbish, stones or other obstacles are placed there by inconsiderate citizens.
Needs better lighting and resurfacing.
Created by Stephan Matthiesen // 0 threads
The cattle pen in the middle of York Place is too narrow and has awkward corners so that you can't even push a bike there when there are pedestrians.
Created by Stephan Matthiesen // 0 threads
It is really not clear how you get from the east end of George Street to York Place. The toucan leads you onto the pavement in the centre of St Andrews Square but then there is no sign or any hint how to get to NE corner of St Andrew Sq where the shared footpath starts again.
Created by Heather Coleman // 2 threads
I noticed a poster at the junction of Elm St and Clarendon St a few days ago. As I needed a rest this morning I stopped to read it. Apparently ONLY the residents of the Kite area (and not all of them according to the note pinned below the poster) are being consulted on the closure of Elm St, as far as I can tell, at the Elm Tree pub, to motor vehicles. Allegedly access by cyclists and pedestrians will be unaffected (although if it's some kind of rubbish narrow everyone having to give way to everyone else design, some regular users might wish to take issue with this, and suggest improvements to the design).
There is no reference to this anywhere I can find online. If I wish to reply to this consultation (and as I'm not a resident, will my views be taken into account?), I will have to go back to the poster and copy down the email address on a bit of paper. Deadline is tomorrow.
However, as a DAILY user of Clarendon St, I feel my democratic rights are being are being totally undermined. It may well be that a very large number of residents are against this proposal. Looking at it, it looks as if, for the vast number of cyclists who cycle along Clarendon St, it will probably improve safety as there may be fewer motor vehicles trying to use the Elm St crossroads which is probably the dodgiest bit of this route. Therefore regular users of Clarendon St may well wish to support this proposal.
My question is: how can they have a consultation that's secret and only open to those who actually live in an area rather than all those actually affected? As far as I am concerned this is totally undemocratic to the extreme.
If anyone is passing the area in the next couple of hours and has the technology to take a photo of the posters and start a thread on here regarding it and posting the posters so we can look at them at our leisure, it might be helpful for those of us who might like to drop a quick email in support of this plan.
Created by Stephan Matthiesen // 0 threads
Kirk Brae really needs a cycle lane uphills. There is enough space as the car lanes are fairly wide (sometimes with space wasted by hatching in the centre) but at the moment encourage dangerous overtaking.
Created by Stephan Matthiesen // 0 threads
Parked cars create narrow pinch points in front of the school, cycle lane becomes unusable so that cyclist can't pass the queuing cars.
Created by Stephan Matthiesen // 1 thread
Making the Park-Glenallan Drive connection unnecessarily awkward for trailers, wheelchair users and others.
Created by Stephan Matthiesen // 0 threads
The gate at the top of the cycle path, at Lasswade road, is very difficult to open when you're on a bicycle, and it swings into to path.
It is not clear why a gate is needed here in the first place (the whole fence is quite pointless), it could be removed.
Created by Stephan Matthiesen // 0 threads
Some kind of connection across Lasswade Rd (40mph!!), either an underpass or a toucan crossing, to connect the Burdiehouse Burn paths.
Created by Shaun McDonald // 2 threads
Suffolk County Council have put forward some plans for changes to Mulberry Corner, which Cycle Ipswich don't believe will help cycling.
Created by Stephan Matthiesen // 1 thread
There should be a walking/cycling connection between Lidl and the housing behind it (Craigmillar Castle Avenue area).
People living there are forced a long detour down to Niddrie Mains Rd then up to Lidl again. This encourages car use and discourages walking.
Niddrie Mains Rd is terrible for cycling so this connection would also benefit people cycling from Greendykes or Inch (through the park).
Created by Stephan Matthiesen // 0 threads
The fence around the car part at Inch House has no gap at the back (there is a gate to allow access to the waste bins but it's locked). This forces walkers and cyclists into a very narrow path along the wall and entrance of Inch House, too narrow to pass others and people leaving the house step right into your path.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.