Abdon Avenue - Bristol Road Link
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
This road has been left with a hopelessly outmoded junction geometry, with huge radii and a simply breathtaking width. It's so bad that it's not unknown for oncoming vehicles to pass "continental style", because a perfectly reasonable path turning right into the close will take you way over to the right of anyone making a right turn out of the close (note there are no white lines to provide road positioning guidance). This would in fact make a great cycling link from Cob Lane into the park. There is ample room to create a cycle path and a crossing with a central refuge, and make the junction safer and less bizarre for motorists. Instead the city council has elected to take cyclists on an unlit shared path the same width as a bike, across an informal crossing upon which cyclists are instructed to dismount, and along a footpath.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
This path has been built recently as part of the Merritts Brook Greenway walking and cycling route. It would be quite useful were it not narrow, twisty, and covered in loose chippings. As it is, it is all but useless for cycling, so it needs to be rebuilt properly.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Jean Dollimore // 2 threads
N-S Cycle Superhighway consultation
------------------------------------------------------
TfL proposed that the N-S Cycle Superhighway should stop at Greville Street but LCC's response to the consultation stated that the route should continue on Farringdon Road to at least the junction with Calthorpe and Margery Street (under discussion here).
After the consultation TfL replied that they would explore options north of Stonecutter Street(which is actually south of Greville Street!). The N-S Cycle Superhighway may be completed by Spring 2016 but we have no date for it being extended any further north.
Link to our discussion on CycleScape
http://camdencyclists.cyclescape.org/issues/1407-the-tfl-north-south-cycle-superhighway-consultation
=========
Junction Kings Cross Road/Farringdon Road/Calthorpe Street/Margery Street
---------
See consultation on TfL's website at:
https://consultations.tfl.gov.uk/cycling/kings-cross-road
which has a link to their junction plan
Plan to build September 2015
-----------
TfL's proposals include the following:
On Farringdon Road - Grays Inn Road
- right turn pocket for northbound cyclists turning into Margery Street
-1.5 m advisory cycle lane on Kings Cross Road for cyclists travelling southbound with one instead of two motor lanes and on northbound carriageway north of the junction
- footway build outs
Calthorpe Street
- longer ASL and low-level early release signals
- footway build out
Margery Street
- widen contraflow
- longer ASL box and low-level early release signals
Immediate issues:
- no space for cycling on Farringdon Road south of the junction
- northbound approach on Farringdon Road left hook issue
- no attempt to provide protection for cyclists crossing the junction; Farringdon Road is wide enough to put in the infrastructure needed for a separate signal stage for northbound cyclists or for "hold the left turn".
- the early release signals are only as effective as a longer ASl box, not protecting cycles that arrive during the green stage.
Dates: consultation 20 February 2015; reply due 6 April 2015.
Created by Dawes Jaguar // 0 threads
The layout here makes crossing from Victoria Common to St Joseph's Avenue awkward on this proposed cycle route: http://www.pushbikes.org.uk/location/northfield-3. It would benefit from some minor attention.
Created by Dawes Jaguar // 0 threads
This footpath needs to be improved and made shared use for this proposed cycle route segment: http://www.pushbikes.org.uk/location/northfield-3
Created by Dawes Jaguar // 0 threads
This short section of scruffy footpath completes this proposed cycle route segment http://www.pushbikes.org.uk/location/bournville-1 and links it with the Merritts Brook Greenway. Since the path is in such a poor state I would suggest updating it to create a cycle path and footpath, the two being made flush with the existing carriageway.
Created by Dawes Jaguar // 0 threads
This puffin crossing is a barrier to creating a cycle route: http://www.pushbikes.org.uk/location/bournville-1. I've attached a photo, because despite it being a random Google Street View shot it shows there is a demand for cycling.
Created by Dawes Jaguar // 0 threads
The footpaths on the Davids Estate provide permeability for pedestrians, but not cyclists, yet one of them would allow the creation of a quiet route for cyclists: http://www.pushbikes.org.uk/location/bournville-1 (the other just links that route with The Davids). Making the paths shared use to lift a barrier to cycling.
Created by Donald Noble // 0 threads
It would be good to have a dropped kerb near here to allow southeast-bound cyclists who have used the road/bus lane to rejoin the cycle path without having to go onto the A90 slip road to rejoin at Crammond Brig
Created by Dawes Jaguar // 0 threads
Cycling is banned on Victoria Common, but it represents the sort of environment in which people love to cycle. In the short term the paths should be made shared use, but longer term it would be sensible to create cycle paths through the park.
Created by Dawes Jaguar // 0 threads
If this path was made shared use, cyclists could use it to connect the official cycle route on Heath Road South with Northfield town centre via Chatham Road and Rochester Road (there is a toucan crossing that takes cyclists across Church Road).
Created by Dawes Jaguar // 0 threads
Maas Road used to be two way, and was a quiet road upon which cyclists could bypass the motorised traffic that has been allowed to totally dominate Northfield High Street. Then it was turned into a two-lane, one-way rat run, and became a barrier to cycling. It should be restored to two-way for cycling.
Created by Stephan Matthiesen // 1 thread
The entrance is very decorative but has a really narrow corner, so it is difficult to negotiate by bicycle when you've been shopping, and impossible for trailers. There is a desire line (mudpath) next to it, this could be converted to a proper path.
Created by Stephan Matthiesen // 0 threads
The footpath has a very bad surface, and should also be a little bit wider.
Created by Stephan Matthiesen // 1 thread
A walking/cycling connection between Summertrees court and Gilmerton Rd would make the route to the bus stops, to St John Vianney and generally between the two halves of the Inch much shorter, encouraging walking.
Created by Stephan Matthiesen // 0 threads
This path is often quite muddy. It is gravel and resurfaced every year or so.
But it's a very busy walking and cycling connection between Inch and Craigmillar, and the gravel just doesn't last very long.
Not sure what to do. It would be a shame to convert it to tarmac, but perhaps there is some surfacing option that lasts a bit longer.
Created by Stephan Matthiesen // 0 threads
Make dropped kerb where the footpath from Ravenswood Avenue meets the Old Dalkeith Rd. This would make it possible for cyclists on Old Dalkeith Rd to dismount here and walk over to Ravenswood Av.
Created by Dawes Jaguar // 0 threads
A bi-directional cycle path here would link Langleys Road (a quiet road that leads down into Bournville Village and beyond) with Katie Road (another quiet road that links with the BCR route on the Worcester and Birmingham canal). Cyclists would cross Oak Tree Lane using what is currently a puffin crossing (suitably modified to promote sustainable transport). There is a huge amount of space here, currently largely used for pavement car parking.
Created by Stephan Matthiesen // 0 threads
Add a dropped kerb at the bottom of Kirk Brae so that people on bike can dismount easier and push if they don't feel like struggling up the hill.
Created by Stephan Matthiesen // 0 threads
Dropped kerb at the end of the cycle lane southbound, so that people on bikes can get off and push.
At rush hour it is usually impossible to merge into and keep up with the motor traffic uphills, many cyclists dismount here and walk to the pedestrian crossing.
Created by Stephan Matthiesen // 1 thread
Often a lot of parking on the grass, in laybys etc., especially during sports event, but also other days.
There is a small parking area in front of the Sports Centre, mainly disabled bays, and a large car park in front of Inch House.
The council has over time added more and more grasscrete areas on the eastern part of the road for about 12 cars, I've been told they were not in the original planning permission.
The provision of parking attracted more and more drivers into the park as there is now an expectation that one can park close to the sports centre, this has become the norm rather than the exception (for people with disabilities, deliveries etc).
Needed are
- bollards along the road to protect the grass
- clear signage
- reduce the parking spaces within the park to the minimum to discourage drivers.
Created by Stephan Matthiesen // 0 threads
Remove the steps and the guardrails to make a connection for bicycles (and buggys and wheelchairs).
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
The cycle lane on Billacombe Road is unusable due to car parking in it.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Rhian // 1 thread
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Natalie G // 1 thread
The proposals for this route along Whiston Road include:
Removing some of the existing speed cushions and replacing them with raised carriageway
tables. These speed tables will be raised to footway level to provide a traffic calming feature
to assist in reducing the speed of traffic along Whiston Road, making it a safer environment for
pedestrians, cyclists and drivers.
Please let us have your comments before 17 October 2016 so that we can draft a group response.
thanks
Natalie
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by Paul L // 0 threads
longer than Kew Rd and any traffic can be obstructive in narrow roads.
Toucan crossings of A316, Kew Road and Mortlake Rd.
Is rat running a problem ?
Created by Cllr Ian Manning // 2 threads
I've long thought the Green End Road area, specifically the section closest to Milton Road, is prime territory for a big reallocation of space, with segregated cycleways, pavements and a narrowed road.
There is a *small possibility* of including an ambitious plan for this in the station project.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Created by Kevin Ablitt // 1 thread
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.