Cycle path on Lammas Land
A proposal to put in a new cycle path on the southern side of Lammas Land. The comment next to this in the report dismisses it because of the access road. They feel the loss of green space outweighs the need for it.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by cobweb // 1 thread
A proposal to put in a new cycle path on the southern side of Lammas Land. The comment next to this in the report dismisses it because of the access road. They feel the loss of green space outweighs the need for it.
Created by cobweb // 1 thread
This could be important given the traffic calming work that was approved for the section of road outside the rugby ground.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by cobweb // 1 thread
From the West/Central Area Committee agenda, a proposal to resurface the track from South Green Road to the start of the Grantchester Meadows path. They will consider whether to adopt this on 1st March.
Created by cobweb // 1 thread
In the Environmental Improvements Programme for the West Area Committee, (1st March) they are considering whether to adopt the proposal to ban right turns from Newnham Croft Street.
Created by Heather Coleman // 1 thread
A colleague asked if the gate from Downing to the Downing Site was open again, since he needed to go to Pathology. I said it wasn't, but why didn't he take the route I take, down Norwich St, Panton St, Tennis Court Road. Answer, "because I fell off my bike there, those speed humps are dangerous, and if you go slowly enough not to fall off, it's really slow".
Now I find that worrying. I go my way to avoid the awful traffic jams at the junction by the Catholic Church. I think most people would consider it a safer route. But if some cyclists are being put off going that way, and instead taking the zoo that is Regent St in preference, well, I don't think the traffic calming is doing the job intended.
Too late to fix this here, but we must make it a priority that any future traffic calming in the city or South Cambs doesn't inadvertently act as an anti-cyclist measure and force cyclists onto the much busier main roads which I'm sure everyone would prefer them not to use if there's a better a and quicker route. But if the traffic calming, that was presumably done, in part, to improve cycle safety, has failed, this is a waste of money. The speed humps on Bateman St, unless you do a slalom, you have to cycle over and the ones on Norwich St are viscious. I've just got good at taking them at speed as I've had plenty of practice.
Created by Robin Heydon // 15 threads
New station that will serve the northern part of Cambridge, specifically the Science Park - but also by extension through the guided bus, villages to Northstowe.
This provides a good opportunity to construct another section of the Chisholm Trail (especially a link over the river and on to Newmarket Road). We must also ensure that any footbridge provides facilities for those with bikes AND that there is adequate cycle parking.
The Times is running a campaign for cycle safety.
How can we best capitalise on this in Cambridge?
Created by Gregory Williams // 1 thread
Speed limit reduction from National Speed Limit to 30mph on this narrow section of road which forms part of National Cycle Route 1.
Created by Gregory Williams // 1 thread
Phase 2 of the River Dour Greenway will connect the existing portion of the River Dour Greenway cycle route with National Cycle Routes 1 and 2 on Dover's seafront. It'll also connect to Regional Cycle Route 17.
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Gregory Williams // 1 thread
This proposed cycle path will remove the need to climb a hill when following the Great Stour Way to reach Canterbury city centre. It'll also increase the proportion of traffic-free path used for the route and remove some areas of potential conflict with other road users due to parked cars.
Created by Gregory Williams // 1 thread
Completion of this section of the riverside cycle path will allow students to cycle virtually traffic free from the Parham Road Student Village into Canterbury city centre. Making this route cycleable will allow the existing and proposed developments at the Parham Road Student Village to fulfil their car-free objectives.
Martin Lucas-Smith // 1 thread
The pedestrian crossing joining the pavements here are frequently blocked by parked cars.
Martin Lucas-Smith // 1 thread
This development (a clear case of squeezing a quart into a pint-pot) has no cycle parking.
Martin Lucas-Smith // 1 thread
This attractive, car-free development - heavily used as a cycling and walking route - has gradually turned into an ugly car park in recent months following the temporary removal of enforcement. The County Council are proposing partial re-regulation of parking.
Created by Heather Coleman // 0 threads
An article in today's Cambridge News about the new shops in Orchard Park isn't encouraging reading.
Link to article is
http://www.cambridge-news.co.uk/Home/Build-us-some-more-shops-or-well-all-get-in-our-cars-17022012.htm
The headline says it all. They are proposing shops that will probably only act as "corner shops" so people will all drive along the A14 or Kings Hedges Road to Milton Tesco.
This seems on the face of it, to add to the general anti-cycling design that Orchard Park has had since the first bulldozers went into action. I don't know what others think, or what can be done about it. Presumably a too large supermarket isn't wanted there, as then it would become a magnet for people outside of Orchard Park to drive to, unless, but this is not a suggestion that is possible, it had virtually no car parking, just for the disabled, but lots of bike parking, and good smooth pedestrian paths to all the houses.
A 20mph limit in residential areas of Cambridge would vastly improve safety and enable more people to cycle. What extent should it cover and how can we achieve it?
Martin Lucas-Smith // 2 threads
Planning application here which may be of interest.
Martin Lucas-Smith // 21 threads
The Local Plan is being reviewed - which will be a big process over the coming two years. It's important that cyclists engage with this and ensure that deficiencies, such as lack of cycle parking, are fixed.
Martin Lucas-Smith // 1 thread
There was a Sainbury's lorry delivering to the front of the St Andrew's Street store today despite signs saying there is no loading at any time on posts nearby. Sadly I didn't have camera. So my question is 1) Are they allowed to do this? and 2) if not, should we make a fuss (assuming it's a regular occurrence?)
[Originally submitted by another user, just transferring this to be a full issue so it has a location]
Created by Robin Heydon // 2 threads
The busway is not lit at night, which is unsafe and hard to navigate.
Martin Lucas-Smith // 2 threads
A new school at Cambourne is proposed here. Obviously we want to encourage children to cycle to it, but the conditions need to be right.
Martin Lucas-Smith // 1 thread
The City Council believes there are rat-running issues here.
Martin Lucas-Smith // 10 threads
Various issues relating to enforcement of taxis in Cambridge (the line shown on the map being the worst area)
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."