Prijelaz Držićeva - istok
Potrebno iscrtati prijelaz preko ceste
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by James Gilbert // 1 thread
New barriers will be used to prevent cars driving into the ford when the river is too high. Almost all of the time when the ford is in flood it is still passable by cyclists and pedestrians on the footbridge. On the Duxford side (pictured), cyclists will have to squeeze past on the verge next to a ditch to get round. This will be hard for cyclists with trailers, children in seats etc...
Richard G // 1 thread
Hi everyone
I'm looking on cycling round the east anglian coastline with a group of scouts this summer.
Has anyone done this & could give hints or suggestions to the routes?
Sustrans maps show plenty of quiet road type routes, but I'm thinking they are not well signposted.
the NCR01 route cuts through Norwich rather than round the coast, but I guess may well be better signposted?
Can anyone help me out with thinking about a route please?
Thanks
Richard (Cambridge area)
Created by timlennon // 1 thread
Note from correspondent:
At the moment there is an agreement for non-vehicle access in and out and vehicular egress for the Canons leisure club members via a controlled barrier with responsibility in the hands of The Harlequins Management. This is regularly abused by unauthorised traffic. I want to investigate the feasibility of it being made pedestrian and cycling only, in advance of any building developments which might want to bring it back into full use for vehicle entry and egress, which would have a significant negative impact on the safe use by pedestrians and cyclists.
Created by Robin Heydon // 1 thread
The Guided Busway is a huge success. It carries many adults and youth to and from many destinations, a major destination being the Cambridge Regional College bus stop. Unfortunately, the volume of bicycle and pedestrian traffic along the line of the busway at this point probably wasn’t considered and is now causing problems. It will probably cause even more problems once the new Science Park Station is built at the far end of the busway.
Current Situation
When I started looking at this junction, I tried to ignore what was “built” and instead tried to observe how people moved through the junction. In the first diagram I’ve shown the main desire lines. Desire lines are where people actually move rather than those which engineers designed. For example, when crossing the access road to the college, from the busway, people walked in as straight a line as possible pretty much ignoring the supposed 90º toucan crossing.
Many people on bicycles don’t bother with the toucan but instead just wait for a gap between the traffic light phases and quickly scoot across. Many people ignore what has been designed and have found new, possibly better, ways through the junction - for example, creating a path from King Hedges Road over bare ground. This informal crossing obviously works, but is it safe? Do the bus drivers expect people to cross at this point?
There are many conflict points, some less bothersome than others. The two biggest problems are at the bus stop exit junction with the science park entrance, and between the toucan crossing and the brick surround of the gas supply for the area. When cycling there can be many people trying to cross the road, especially after the bus has stopped, or just before classes are due to start, all getting in your way. Of course, we are getting in their way too, and this isn’t helped by the poor sight lines.
I would therefore summarise that the problems are simply:
1. Severely limited space at the toucan crossing and busway crossing points.
2. Informal pedestrian crossing show junction isn’t working as desired.
3. Very narrow access to science park with poor sight lines.
Proposed Solution
First, we should always respect peoples desire lines. They are voting with their feet, it is obviously safe enough for them to do it day after day, and they have left plenty of evidence that it works by wearing down the grass. So we should make this a proper pedestrian route. This actually has two benefits: it moves a lot of the pedestrian traffic to the west side of the busway stop reducing the number of people at the science park entrance, and it allows a more “directed” path to the north side of that brick building.
Second, we should separate the CRC traffic and guided busway traffic as much as possible at the CRC junction. The busway traffic should follow their natural desire line which is straight on. There are wide turning splays for buses to access the busway from the CRC, yet no buses do this. We should remove them and make a straight on toucan in line with the busway. The CRC traffic would be given their own toucan on the north side of the brick building. Some of the existing railing (cycle parking) here may need to be removed, and the car stop line pushed back a car length or so. The space between the car stop line and the new toucan could usefully become an advanced cycle box.
Third, we should build a proper segregated footway to the north of the cycle track that links to the existing footway going to the “new” toucan. This would be built similar to the Coton path such that pedestrian traffic would be encouraged to seek the higher and safer ground.
Forth, we should straighten the line for access from the science park to the busway. The current facility bends away from the busway crossing, is very narrow, and limits the flow. I’ve seen times when people are queuing cross the busway to travel through this gate. On the south side, the highly restrictive chicane should be removed. People happily cross the busway at multiple points without problems, as here the buses are moving very slowly as they approach the station.
Lastly, we should alter the phasing of the traffic lights. A simple desire for people on bicycle is to wait as little time as possible, but we take very little time to cross a road. Therefore, I would suggest that bicycles are given a green light between every car phase, but only for a few seconds. They should also be given a green light whenever the busway is given a green light. The individual phases may need to be lengthened slightly, say from 25 seconds to 30 seconds to maintain the “capacity”, but the advantages it gives to bicycles would be huge. Also, the pedestrian crossing could be changed to a zebra crossing. This route would then become preferable to the slower toucan crossing further pulling people away. It would also allow for a much more pedestrian focused environment around what should be highly walkable area.
Created by Jack Thurston // 0 threads
The A40 between Abergavenny and Crickhowell is a narrow, fast trunk road and totally unsuitable to cycling. This is a vital connecting route in the area, between two neighbouring towns. There are sections where it is easily wide enough for a proper, separate 2m wide cycle path, or a wider shared use path with pedestrians.
This is a critical issue if the Usk valley is to be made accessible to people riding bikes.
More detail on the issue on the ACG website: http://abergavennycyclegroup.org.uk/cycle-route-to-crickhowell/
Created by Jack Thurston // 0 threads
ISSUE REPORTED AT ACG PUBLIC MEETING - 10 APRIL 2014
Crossing from Belgrave Road to Hatherleigh Road is often difficult due to fast moving traffic and no crossing infrastructure on the Brecon Road.
Created by Jack Thurston // 0 threads
ISSUE REPORTED AT THE ACG PUBLIC MEETING - 10 APRIL 2014
Making right turns when riding east on this section of A40 is difficult due to fast moving motor traffic.
Created by David Earl // 1 thread
Demolition of Edinburgh Building, warehouse and associated buildings and erection of office development of up to 41,750 sq. m. gross external area with development generally being of between 4 and 5 storeys (with limited areas of screened rooftop plant), a single tower element with two further storeys of accommodation, up to 189 car parking spaces (+/- 10%), up to 1325 cycle parking spaces (+/- 20%), up to 26 motorcycle spaces, hard and soft landscaping and ancillary facilities including staff canteens, meeting rooms, refuse enclosures, plant rooms, social break-out spaces etc. all to serve as the new office campus headquarters for Cambridge Assessment.
Created by David Earl // 1 thread
Bella Italia have applied to Cambridgeshire County Council to put outside seating (19 tables/38 chairs) at the Mill Pond outside their restaurant:
http://www.cyclestreets.net/location/57440/
(I'll put the detailed plan on the thread to follow).
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
What would the merits be of putting a crossing further upsteam of Abergavenny, such as where the historic ferry crossing was?
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The obvious cycle route to get to Gilwern Velo Park from Abergavenny is to join the canal towpath at Govilon. On arriving in Gilwern, the cyclist is faces with several issues: Poor surface of the canal path along Gilwern Wharf, steep access down from the canal path. No crossing point on Abergavenny road (without cycling all the way into Gilwern) and then a narrow de-restricted lane with steep sides and no verge leading to the turn into the outdoor centre. We would like to see many improvements made to allow safe access as part of the velo park scheme.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Apparently a route round NH Hospital was proposed once many years. There are many opportunities for the hospital to improve cycle (and foot) access.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
If the authorities are serious about expanding Llanfoist with new housing and de-trunking the A40 though Abergavenny, then they have to face this problem. A foot/cycle bridge, either just upstream of the existing bridge, or down stream into castle meadows would both be a solution, as would a new road bridge that would allow the old bridge to become single lane.
We all know that cost is the big problem here and that some of the options are not going to be possible, but we should campaign for some solution to be found.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Radical, and would please victorian steam enthusiasts... but how about actually re-instating the old high-level bridge? The footings are still there and, if extended, could link directly onto route 46 beside Waitrose, thereby avoiding the need to cross the busy road!
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The A4143 heading up towards the Hospital is plenty wide enough for a dedicated cycle path on one side or the other (we suggest the west side). This is often a busy and fast road. (Note this this would also solve the safe cycle access to the climbing wall and softplay.)
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The small industrial park that includes Aber-Rocks Climbing wall and Kingdom Come Softplay has no cycle path. There are various options for linking it to safe routes.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A key link for route 46 users, as well as people getting to/from Llanfoist village hall, is the strip of pavement on the north side of Merthyr Road. We believe there could be the width to allow this to be widened into a share-pavement allowing cyclists to avoid crossing the road twice in the space of a few hundred metres.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
One mainly for the pedestrians and anyone pushing a pushchair, but also impacts toddlers and young children riding on the pavement: On the corner of The Cutting and Merthyr Road, any car longer than a small hatchback blocks the narrow strip of pavement assigned to pavement users.
This is a key route for people coming from Abergavenny to access Llanfoist and route 46.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
There are relatively shallow paths that run from both ends of the bridge down to the A4143, but both have shallow steps that stop them being useful to cyclists. This means that people heading out of the hospital wanting to cycle down the A4143 towards Llanfoist have to cross the road with the traffic, rather than the safer alternative of crossing the bridge and coming down the ramp.
Note that openstreetmap's map of this is incorrect. I'll submit a correction (11-04-2014)
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Part of Union Road East is one-way, so cyclists heading from the hospital into town have to cycle 3 sides of an undulating square to reach Tudor Street. A contraflow cycle lane would solve this and encourage cycling.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A very short section of Route 42 is steep and rutted. Not rideable by road bikes. Simply improving the surface would be a start.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Andrew Woodward // 0 threads
Cyclist coming from the river come up Friars Lane exit and have to currently route right round Richmond Green because it is one way. Many do not and simply cycle across the green. The path across the green should be formally opened up to cyclists - as a share path with pedestrian priority - or a seperate track provided along the south side of Richmond Green.
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by Andrew Woodward // 1 thread
I have serious concerns about the safety of this portion of the bike path; arising from its recent re-design. Recently my 10 year old son was in a very close “near-miss” with a car turning off the A316 into Bicester Road; and I believe many more similar incidents are likely occurring. Eventually someone will be seriously hurt or killed on it.
However, the improvement in the track leads cyclists to feel more confident in using it – giving a false sense of security.
In particular:
• The segregated track makes it particularly appealing for inexperienced and more vulnerable cyclists (such as kids).
• This track design leads to an increase in the cyclists speed.
• The smooth/quick nature of the track leads inexperienced cyclists to believe that THEY HAVE RIGHT OF WAY across side roads.
• There are no markings on the roads to tell drivers coming in or out of side roads that cyclists could be on the track crossing their path.
• There is a particular challenge for EASTBOUND cyclists.
To avoid stopping at every side road, when on the track travelling Eastbound (as per red arrow on photo) approaching roads such as Bicester road, the cyclist has to simultaneously
(a) check to their FRONT/LEFT side to see if a car is exiting the side road
(b) check BEHIND them on their REAR/ RIGHT hand side to see if a car is about to swing off the A316 into the side road (usually at speed) - (as per orange arrow on photo).
This is a hard combination to perform – looking 180 degrees opposite directions at the same time. If you are an inexperienced cyclist, on an apparently safe track, it is very likely that you will not realise you have to be this vigilant and not check adequately for cars.
Hence, my boy rode across Bicester road from the east and was very nearly hit by a car turning off the A316.
(Note that travelling from the west is somewhat easier as both the vehicles turning in from the A316 and those turning out from the side roads are in your front field of vision).
My suggestions for improving this situation are:
(1) Clearly mark the bike track across the side roads so cars are aware there are cyclists approaching from the side.
(2) Ideally, give cyclists priority across the side roads; so making cars slow to a halt and making it more intuitive for cyclists.
(3) To facilitate this, would require some stopping space for traffic coming on/off the A316 to after the bike track crossing
At roads such as Bicester road the bike track could be curved to the south by about 2m before crossing the side road – this curve in the track would
(a) naturally slow cyclists down as they approach the side road
(b) would provide vehicles moving onto the A316 a decent gap so they can separate the concerns of first negotiating the bike track then focus on getting on the A316;
(c) for vehicles coming off the A316 the additional space would give them space to stop and give way to cyclists.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Ned Harrison // 1 thread
Holywells Park has a section of cycle route 51 running through it, linking South East Ipswich to the centre with a pleasant and safe route down to the waterfront.
During Winter, the park is closed at dusk, sometimes as early as 4, meaning that just when the roads are most dangerous (dark and wet) cyclists are forced onto steep and busy routes either along Cliff Lane or up Bishops Hill.
The closures are largely at the request of the Park Friends group. I've spoken to them, and their concerns seem to be largely about what might go on after dark. It's not clear that there is any evidence for this, nor that the current situation of locking the main gates but leaving others would do anything to deter misbehaviour.
Keeping it open as a cycle route would ensure a legitimate presence in the park, and help provide less confident cyclists in the area with a safe route to and from town.
I'd propose either locking later, or for a trial period leaving the park unlocked.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by PurpleSue // 2 threads
I watch in wonder and amazement as the new cycle lane alongside the A41 from Mostyn lights to the zoo is completed - with lamposts in th emiddle of the path - not to mention a three legged road sign which I am sure will make passage impossible.
I will investigate more and take photos....
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.