South Cambridgeshire Local Plan review
South Cambridgeshire District Council are reviewing their Local Plan. It is important that cycling issues are dealt with and brought to their attention during this process.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 6 threads
South Cambridgeshire District Council are reviewing their Local Plan. It is important that cycling issues are dealt with and brought to their attention during this process.
Martin Lucas-Smith // 9 threads
The Great Kneighton (Clay Farm) development will have effects on cycling. A series of planning applications have been passed and more will come.
Nigel // 0 threads
Department for Transport press release 23 March 2012:
http://assets.dft.gov.uk/press-releases/20120323a/east-england-fact-sheet.pdf
Cambridgeshire "Better Bus Area Fund"
Cambridgeshire will receive £1,724.000 to improve accessibility, bus journey times on key bus routes in Cambridgeshire. The changes will include new traffic management on four corridors into the city, bus priority, upgraded buses, improved interchanges (including with Guided Busway), smart ticketing top-up on street and real time passenger information. For further information, go to http://www.cambridgeshire.gov.uk/NR/rdonlyres/1BA212D3-E038-47C5-9E0A-50E2BDBE3AB7/0/CambridgeshireBBAFproposalFINAL.pdf.
The proposals include much of relevance for cyclists, including bus priority at junctions, a "bus gate" through the middle of Mitcham's Corner and more.
Created by Simon Nuttall // 1 thread
A campaign member and resident of the area has sent this:
I've just received a consultation paper from the City Council for residents of Stanley Road, Garlic Row and Oyster Row. I've summarised the proposals below.Scheme 2 Option B seemed the most significant.
Scheme 1. Extension of parking and loading restrictions on Stanley Road
Scheme 2, Option A. "No entry except cycles" on Garlic Row adjacent to the junction with Mercers Row
Scheme 2, Option B. Oyster Row becomes one-way in the northeasterly direction. No exemption for cycles.
Comments to Gavin Card at the City Council by the 30th March (gavin.card@cambridge.gov.uk or PO Box 700, CB1 0JH)
Created by Rohan Wilson // 0 threads
The Grove Pub. Transport Statement recognises that 19 cy spaces should be provided (1 per 15sqm public space), states they are in "garage" but details not given, just assumed space available. Needs closer look. TRICS database for a Leeds Sikh Temple shows no cycling, 16.4% walking, 3.6% public tpt.
Created by George Coulouris // 0 threads
The Foot tunnel should be more accessible
Martin Lucas-Smith // 0 threads
Blackfriar's Bridge is a major collision blackspot that actively discourages people from cycling.
Created by Gregory Williams // 0 threads
The cycle parking standards for Medway can be found here:
http://www.medway.gov.uk/pdf/Medway%20Council%20Residential%20Parking%20Standards%20Jan%202010.pdf
The standards have low minimum quantities and are very basic in their detail. There is no mention, for example, of the minimum space needed to be left around cycle parking, or the spacing of the cycle parking for it to be effective. Nor is there any mention of what constitutes an acceptable type of cycle parking (e.g. Sheffield stands) and what is unacceptable (e.g. wheelbenders). No mention is made about provision of covered cycle parking. No mention is made of the proximity of cycle parking to building entrances. No mention is made of the need for cycle parking to be highly visible and for lighting and CCTV coverage.
Created by Simon Nuttall // 1 thread
The cycleway between Fen Ditton and Horningsea
Created by Rohan Wilson // 0 threads
The adjacent, approved plot, 11/05530/FUL designed by the same architectural practice, places the cycle cupboard next to the front door and closer to it than is the car.
THIS proposal, however, offers the standard back-of-garden shed for bins and bikes, with the bikes beyond the bins, while the car driver door is adjacent to the house front door...
Note Manual for Streets 8.2.1, quoted in a prominent panel on p5 of the Cambridge Cycle Parking Guide:
"In residential developments, designers should aim to make access to cycle storage at least as convenient as access to car parking."
Created by Rohan Wilson // 1 thread
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The site is proposed as study rooms for students aiming to enter university. Thus they would be old enough to cycle independently within Cambridge, for example between their places of residence and the various study buildings.
Remarkably, it is suggested (Planning Statement) that the students might park their bikes on Station Road where cycle parking is available, and might be augmented, and walk to the proposed site. This is a distance of 700m, taking 10 minutes at a normal walking pace plus any waiting time to cross the East Road/ Regent Street junction. Any student with a cycle at Station Road would be likely to wish to use it to continue to the proposed site, if parking arrangements provided there were reasonably convenient and secure.
We are told that the Regent Street site is closer to the student residences than Free School Lane, but no more definite information is given as to how far the residences are from the proposed site or from Station Road.
The city's cycle parking standards are presumably set to reflect normal levels of demand from staff and students, and no explanation is given as to why "very few students have bicycles".
The access to the suggested cycle parking in a narrow yard at the rear of the building is presumably the gated passageway to its north. This is not made clear, nor is it clear whether there are steps to be negotiated. It seems impossible that more than perhaps a dozen bicycles could be parked in the yard most of whose width appears to be less than a bike's length, leaving no room for daily or emergency access with the parking arrangement indicated.
The transport aspects of this proposal have not been examined in sufficient detail for their impact to be properly assessed, but it is certain that there is insufficient space for the level of cycle parking required. There appears to be no disabled access. We therefore object.
Created by Rohan Wilson // 1 thread
12/0342/FUL 12 cycle spaces indicated but space looks inadequate (no dimensions or layout shown)
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The site is on a local cycle link and thus it is reasonable, in the context of Cambridge, to anticipate a high proportion of parents and children arriving by bicycle. Indeed, bearing in mind the limited car parking available we would recommend that a travel plan strongly promoting cycle access for staff and users be required.
We object because we do not believe that the cycle parking space(s) allocated are consistent with the stated aim and the need to achieve high cycling levels. In particular, tagalongs, trailers and large carrier-bikes are likely to form a high proportion of customer cycles. The dimensions of the small, unsheltered enclosure (designed as a bin store in the current use of the site?) and a proposed layout are not given but look insufficient, and include a narrow entrance.
If cycles for say 30% of 18 customers, their children and 8 staff were to arrive by bike (say 3 staff, 6 adult customers and 8 children during a single class) then allowing a 50% margin for changeover between classes, space would be needed for a variety of types of bike and trailer to accommodate some 3 staff, 9 adult and 12 children customers.
This sort of calculation and the detail of the use of the cycle parking spaces do not seem to have been presented by the applicant, and should be required and assessed before the application is determined. We suggest that at least one car space would have to be used to accommodate sufficient cycles on this site.
Created by Gregory Williams // 1 thread
Proposed 20mph speed limit along School Road, Saltwood. The design involves removing the buildout at the Brockhill Road junction and installing overrunnable humped buildouts at regular intervals on alternate sides of School Road. "Gate" features with kerb buildouts to restrict the road width will denote the start and end of the 20mph zone.
Martin Lucas-Smith // 1 thread
The Penny Ferry Path (Halingway) entrance remains rather poor even after the changes a few years ago.
The application proposes to design a new lobby for this department and to relocate the cycle racks.
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
This application proposes to demolish every but the façade of 55-57 Regent Street and create a restaurant with 14 residential units
Martin Lucas-Smith // 1 thread
Cycling on Long Road can be pretty hazardous and unpleasant. There needs to be a lower speed limit (30mph) as a minimum.
Created by Gregory Williams // 1 thread
This portion of the cycle path near Reed Pond gets quite muddy on an annual basis. In the autumn / winter / spring it can sometimes be quite difficult to traverse.
Created by Gregory Williams // 1 thread
The gaps between the boards on the ramp connecting to the Weir Court cycle bridge mean that cyclists crossing the bridge could get their wheels caught in the gaps.
Created by Gregory Williams // 0 threads
A new playground is being proposed in the vicinity of Vauxhall Avenue. The playground is welcome, but it is important that its placement does not jeopardise the long-term ambition of a riverside cycle route.
Created by Gregory Williams // 1 thread
The cycle parking at the new Waitrose in Ashford is positioned such that some spaces are not available for use. One rack is too close to a bollard. Both racks are too close to each other.
Created by cobweb // 2 threads
Burwell is scheduled to be expanded by East Cambs and there are fears it might end up car centric.
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Gregory Williams // 1 thread
Canterbury planning permission CA//09/00142 includes an emergency access road, which is intended to be open to cyclists. This provides a vital link in the riverside cycle route in Canterbury. The rest of the construction on this planning application has been completed, but, contrary to conditions 12 and 13 of the appeal planning permission the emergency access link and the final portion of the cycle path have not been constructed.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Colin Wing // 2 threads
This is the proposed route of Quietway 16 in Westminster
Nominal deadline set to clear this from the Consultation Map.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by wookey // 2 threads
Out of the A1307 Linton Greenway consultation has come a plan for the section between Addenbrooke's roundabout and the Babraham P&R, which the county/GCP are keen to move forward. There was an initial invite-only consultation event on Thur 31st Jan for local residents/residents associations to comment.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Martin Lucas-Smith // 3 threads
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by Jon_B // 0 threads
There are currently (29/06/15) temporary 3 way traffic lights in place at the junction where Rope Walk meets St Helen's Street.
This is normally a really painful junction for people cycling from Rope Walks onto St Helens Street at busy times with long waits for a gap in traffic and bad sight lines, particularly where west-bound traffic backs up leaving a gap at the yellow box junction so that people cycling have to venture out halfway across the road to see if there is any traffic coming east-bound.
The lights make this considerably easier and would be worth considering as a permanent signal.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Stephan Matthiesen // 0 threads
Kirk Brae and Lasswade Rd at least up to Margiotta should be included in 20mph. It's very narrow, residential, and with many shops in Lasswade Rd.
It's also steep uphills and fast overtaking makes it very dangerous for cycling.
Created by MB // 1 thread
There is a useful but unmarked path from Queen's Road to Richmond Park and through to Sheen. It is used by pedestrians and cyclists & I have never seen it on any map! From Lower Grove Road, it takes you to the park via Bog Gate, or Sheen via Sheen Common.
If it were better marked on maps, better maintained & wider in places, it could form a useful section of Richmond's (paved, segregated, Dutch style?) cycling network.
Tom McKeown // 1 thread
Drivers ignoring the marked priority at Magdalene pinch point is a regular occurrence when faced with city bound riders. At times this can be very dangerous. Especially when large numbers of riders are forced into a very small gap between the vehicle and the bollards. I should imagine the situation is especially unpleasant travelling with small children. Also difficult to resolve with a wider cargo cycle, trailer or trike.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by Kevin Ablitt // 1 thread
As you can see in the photo there is a shared use path on river side of West End Rd just east of Bobby Robson bridge. But then where ? How far does it go ? It is certainly no good if you want to cross Princes Street- you cant unless you go up to the Burrel Road end of the bridge. And anyway once you get over Princes Street along Commercial Road and Grafton Way it is a narrow footpath which is not shared use.
It would be good to connect Bobby Robson Bridge and the Waterfront.
Directly and not by switching over to the other path and then over two toucans. Perhaps even a wide cycle crossing of the 4 lanes of Stoke St ? That would be brilliant.
Anon // 1 thread
Wandsworth Council has opened a consultation on two-way cycling on Furmage Street and part of Twilley Street between Garratt Lane and Kimber Road in Wandsworth. This would allow cyclists to avaoid having to make the tricky and dangerous right turn at the end of Kimber Road. Wandsworth Cycling Campaign has been asking for this for several years. The scheme is now being built under an Experimental Traffic order and includes physical measures using islands and armadillos to protect cyclists and direct and slow the motorists who rat-run through these small streets. Please use this facility if it's on your route and feed back your comments to the consultation. At the end of the experiential period in October the comments will decide whether the scheme should be made permanent or not. Use the consultation to let them know if you appreciate it. Let the Council and cyclewandsworth@gmail.com know of any problems or improvements you'd like.
The link to the consultation which includes a plan of the changes is:
https://haveyoursay.citizenspace.com/wandsworthecs/twilley-19/consult_view
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Peter Loader // 1 thread
This proposed Berry Lane Estate to Shepherd Primary School, Mill End cycle route follows:
* Chiltern Drive.
* Part of Shepherds Lane.
* Part of the south east path through King George V Playing Fields, Mill End.
* The pathway leading to the new pedestrian entrance to Shepherd Primary School, near its cycle parking area.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A key link for route 46 users, as well as people getting to/from Llanfoist village hall, is the strip of pavement on the north side of Merthyr Road. We believe there could be the width to allow this to be widened into a share-pavement allowing cyclists to avoid crossing the road twice in the space of a few hundred metres.
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.