Radegund Road additional parking restrictions proposed
Cambridgeshire County Council order proposing additional parking restrictions outside Coleridge college on Radegund Road
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by David Earl // 1 thread
Cambridgeshire County Council order proposing additional parking restrictions outside Coleridge college on Radegund Road
Created by Sarah Wood // 1 thread
Park Road is one way to motorised traffic at this point. There is a contra flow on road cycle path to allow cyclists to travel S. This path is far less that 1 metre wide and parked cars are allowed to the right of the cycle lane. The issues here are: high risk of being doored; wobbling into gutter; knocking wing mirrors; being hit by vehicles turning right into entrances because of poor sight lines between motorists and cyclists created by the barrier of parked cars. This is shown in the photo.
Created by Peter Loader // 4 threads
This issue involves working out the SPOKES response to a draft version of the forthcoming public consultation for Clarendon Road Phase 2, Watford.
If you are a member of SPOKES and do not yet have a copy of the draft document, please contact a member of the SPOKES committee.
When creating a new thread to discuss this issue, you’ll be asked whether this thread is private to the group or not. Please keep it private to the group.
Created by Simon Redding // 0 threads
Spital is an area of high cycle ownership. To cycle to town, Spital residents have to currently either traverse a dangerous junction & road bridge to join the Hasland Road cycle route, cycle on the A632 under a dangerous bridge, or cycle a long diversion around the back of the station. With this short spur from the proposed station link, Spital residents would be able to access the town cycling hub at the Spire Business Park and easily cross into town in a number of ways.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Sam // 1 thread
Herbert St is one of the closest streets to the centre of town that has free on-road parking. As a result, it's a little chaotic.
Councillors are working towards resident only parking (and seem to have been for some time).
Given that it's part of the cycle route from Midsummer common, and has small gardens, narrow pavements etc, is it worth seeing if there can be some cycle stands added or some other improvements at the same time?
There are some by the co-op on Chesterton Road, of which about half seem to be used by residents.
Created by Phillip Barnett // 2 threads
As part of the station redevelopments, the existing cycleparking is being replaced through June-August 2014 with two-tier stacks 'with the same capacity as the current arrangements'
Created by Simon Hewison // 0 threads
On this stretch of CS7, there's mandatory cycle lanes, which motor vehicles aren't allowed in, but it seems that Southwark Council forgot to include double-yellow lines, or any segregation, just blue paint with a solid white line. This leaves cyclists swerving into the road to avoid multiple badly parked vehicles (often HGVs taking their lunch, and in many cases, unmarked police vehicles at the unmarked police office)
Quick fix: Armadillos and/or double-yellow lines.
Created by Simon Redding // 0 threads
The previously offroad cycle lane has a missing 100m section that turns on to a main road, climbs up along it steeply and then has to turn right to proceed to turn. This is not safe for adults, never mind taking the kids into town.
Created by Cllr Ian Manning // 2 threads
I've long thought the Green End Road area, specifically the section closest to Milton Road, is prime territory for a big reallocation of space, with segregated cycleways, pavements and a narrowed road.
There is a *small possibility* of including an ambitious plan for this in the station project.
Created by David Earl // 1 thread
Changes are proposed to this junction (thread and attachment to follow)
Created by Gregory Williams // 1 thread
The cycle parking at Canterbury's new Go Outdoors shop is spaced too close together. It should comply with the Kent Vehicle Parking Standards which detail a one metre separation of stands.
Created by Al Storer // 1 thread
Cambridge City Council planning application 14/0713/FUL. Nursery to be demolished and replaced by housing
Created by Matthew Phillips // 1 thread
See planning application at: http://publicaccess.durham.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=N3SZPOGDGB000
Good points: plans include secure covered cycle places at a ratio of 1:2 which is exactly what we have recently been asking for.
Bad points: Council officers have suggested this is too many and 1:5 would be appropriate. This is despite the fact this accommodation is relatively far off from most University sites.
Issues:
1) cycle access over footbridge
2) ensuring development is connected to all local footpaths
3) bike contraflow needed on Station Lane
4) navigating Gilesgate roundabout
Created by Heather Coleman // 1 thread
I'm getting reports of a very serious accident at the crossing of the Addenbrooke's Trumpington cycleway and the Guided busway from the city centre to the Park and Ride, and the Addenbrooke's spur.
As you approach the end of this particular stretch of NCN 72 past the Egger factory, you suddenly emerge onto a very busy road. This is one of the major arterial routes in and out of Hexam as it leads to and from the A69 bypass, one of the major transpennine links. It is not suitable for adults to ride on never mind young children.( I have a son aged 10)
The route leads across the main road bridge into Hexham, swings around a small roundabout by the Tyne Green park, and then brings you directly onto another roundabout by Tesco and the Wentworth Leisure Centre. It is as though cyclists have been designed out of the picture on this one. Its a shame as my son would use this route to school if it were safe.
Created by Al Storer // 1 thread
A local campaign group has been formed to push for improvements to this busy roundabout
Created by Gregory // 0 threads
Not an issue but good news I thought worth sharing here. I regularly use the Gala/Walkergate cycle racks outside Clayport Library. Today I was confused, they had been replaced with a slightly different style and moved closer to the wall. The concrete looked wet/new but they are firmly in place, perhaps that's why they were empty but a bicycle was locked to a nearby lamp post.
An old gentleman walked by and commented it was a better place for them. I thought he referred to being out of the way, but he said the seat won't get wet (if I had parked my bike facing the other way!).
I have updated the cycle capacity on OpenStreetMap, there are almost double the number of racks as before!!! I don't know what happened to the old style racks, hopefully they are being installed somewhere new. I might ask.
http://www.openstreetmap.org/node/744912599
Created by Hester Wells // 1 thread
Consultation on road markings and traffic signs at https://www.gov.uk/government/consultations/traffic-signs-regulations-and-general-directions-2015
There are a number of things which I believe affect cyclists, see http://www.bikebiz.com/news/read/dft-to-allow-better-signage-for-cyclists-including-removing-asl-lanes/016336
This is really a national issue, but didn't want to spam all users.
Created by Hester Wells // 1 thread
s106 money has been set aside from the West Cambridge development for a route into Central Cambridge.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Heather Coleman // 1 thread
I've just spotted a County Council public notice on the post at the point noted, but applying to various areas as far as I can tell. Was in a bit of a hurry - stupidly didn't think of taking a photo of it. But the Council appear to be suggesting putting bus lane enforcement cameras in! I think this has to be good news, and ought to help cyclists - what do other people think?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by Martin A // 1 thread
This attractive former railway line would provide a useful off-road link between Ripley Greenway and Derby for commuters and leisure users.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.