Ponding
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Iain Lane // 1 thread
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
Created by Iain Lane // 1 thread
The city council received a £6.1m grant from the D2N2 LEP to construct 4 radial routes. This is the first, a mixture of a physically segregated and a shared route.
I use this route twice every day and the cycle lane is always blocked by cars parked to use the shops or hotels on this street.
It makes the cycle lane pointless as I can't use it.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Richard G // 1 thread
There seems to be a number of cars parking half in the cycle lane on the new Addenbrooke's road (Dame Mary Archer Way)
Is parking in a cycle lane an offence of some sort, and would it make a difference on what I think is a private road? (I think that those roads around Addenbrooke's are not normal in terms of ownership)
Vegetation breaking through the surface of a, basically brand new, shared use path surface at Smeaton Bing.
Created by Jenny Barnes // 2 threads
If the level crossings either side of farncombe station were cycle/ ped only, with bollards in nightingale rd at the farncombe street end, and on frith hill, farncombe would be divided into 3 areas for cars, each of which would need to come out onto distributor roads. Further, if the New pond rd end of summers Rd as far as Brioadwater school were made one way southwest bound, any traffic trying to bypass the a3100/ Meadrow would be unable to.
Access Walden is a campaign group based in Saffron Walden.
Their objective is to create a safe walking and cycling link between their town centre and Audley End railway station, a journey of two miles.
Created by Bracken VanRyssen // 1 thread
The Brook Lane road badly needs cycle infrastructure and there is definitely the space available and small changes here have the potential to have a big impact on the route. Easy changes would be to resurface and open up the ends of the Brook Lane service road to allow continuous movement along it, as well as putting in a crossing for the Yardley Wood road. On the easterly section a protected bicycle lane for cyclists ascending and descending the hill could be created by moving the parking in the left lane further away from the pavement and using the resulting space (especially important for cyclists travelling up the steep hill).
Created by Roxanne (Cycling Campaign Officer) // 1 thread
The path running in front of Petersfield Mansions (identified below in red) is only 1.2m wide. This means that when passing each other pedestrians and cyclists often have to use the grass which is problematic when it is wet and muddy. It is also difficult for residents of Petersfield Mansions when exiting their properties as there is very little space for people to manoeuvre around each other.
Usage of this path has increased over the years with more cyclists using the path to access the cycle racks which have been installed on Bradmore Street as part of the expansion of Anglia Ruskin University. It is therefore proposed to widen the path by 1metre to cater for this increased usage and to improve access from Mill Road with the removal of a short section of railing and the installation of a flush kerb.
Petersfield is owned by the City Council and the path in question is maintained by the County Council as highway.
The cost of these works is approximately £20,000 and this project will be joint funded by Cambridge City Council and Anglia Ruskin University.
The path marked in blue is maintained by the City Council and we hope to improve the surface of this path at the same time if funding can be identified.
If you have any comments regarding the widening of this path or would like more information please contact cyclingconsultations @ cambridge.gov.uk by 14th September 2015.
Anon // 1 thread
KCC consultation on reduction in speed limit to 40mph
http://consultations.kent.gov.uk/consult.ti/40mphspeedlimitheadcorn/consultationHome
Consultation closes 28 Sept 2015.
Created by Dexter Johnstone // 1 thread
Weston Street is an advisory cycle route and should link up with the University of Sheffield concourse. However, it does not and you currently have to cross 3 lanes of traffic. The road is often very busy. There should be a toucan crossing instead of the pedestrian crossing, a short off road cycle path across the large grass verge could link the crossing to Weston Street.
Created by Chris Paton // 0 threads
City of Edinburgh council have done good work trialling a segregated path for NCN1 on George Street. Although the trial is coming to an end it's clear from their documents and consultations that George Street will remain the primary east-west route for cyclists travelling through the city centre and more investment is planned.
The problem is that there is very poor access to this route from the West End for any cyclists who have come along Shandwick Place or Rutland Square (including cyclists from the big offices nearby). Heading east, cyclists have to go through the busy West End road junction and then brave cars sweeping into South Charlotte Street as they turn left while simultaneously needing to find a way across two lanes of traffic to the middle of the road to turn right onto George Street -- scary stuff even for a competent cyclist.
Space is always at a premium but there do seem to be options for improving this with minimal loss of road space. A two-way cycle path could be constructed across the paving to link Hope Street with Rutland Place. With careful design this could be done to minimise impact to the pedestrian space and with reconfigured light timings cyclists could emerge from Hope Street to turn left or right, and likewise cyclists from Shandwick Place and Princes Street could turn into the new path. In addition, a left turn strip at Lothian Road onto Rutland Place would provide access to this new path for cyclists from Rutland Square and Lothian Road.
Created by Bracken VanRyssen // 1 thread
The only cycle access to the train platforms at Solihull station is an extremely small lift, otherwise your only option is carrying your bicycle up and down the stairs which can be quiet challenging. A simple solution would be a wheeling rail at the edge of the stairway to guide wheels down slowly. I see quite a few people with bicycles using the train and I myself do so on a weekly basis and two flights of stairs with a laden bicycle certainly make things tricky.
Created by WildNorthlands // 1 thread
Generally I'd say Brunswick St works well as a bike route but the gate between these two roads and the junction is poorly placed - in order to get through it you need to be on the wrong side of the road on a blind bend and it is common to find yourself coming head to head with a car coming the other way. if there were too gates for each direction, and the northbound was lined up with the cycle lane, it might help.
Created by Dominic Fee // 1 thread
Westminster City Council is undertaking a statutory consultation on the Traffic Management Orders (TMOs) needed to implement the East West Cycle Superhighway at Parliament Square. You can find a description and drawings of the proposals here:
http://westminstertransportationservices.co.uk/tmo/tmo_details.php?tt=2&id=909&cid=1
In Westminster Cycling Campaign we rarely respond to statutory TMO consultations because the proposals are either insignificant or, if they are significant, they've usually been subject to an earlier public consultation. It would be inappropriate for us to repeat points we've made previously, and we wouldn't be listened to.
Nevertheless I would encourage interested people to take a look at the Parliament Square drawings to check that the earlier design has been taken forward properly into a detailed design for construction. We have had a recent example where we did respond to a statutory TMO consultation in which the connection between part of the EWCS proposals (Savoy Street) and the rest of the highway network (a left-in left-out junction on the Strand) hadn't really been thought through. If we need to submit a response regarding Parliament Square, the deadline is 21 September 2015.
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Single storey front, side and rear extensions.
58 Willingale Road Loughton Essex IG10 2DB
Epping Forest
Application reference : EPF/1025/15
Created by Heather Coleman // 4 threads
I can't find anywhere sensible to put such things so this is a general issue for people to start specific threads pertaining to temporary closures.
Created by Donald Noble // 1 thread
A barrier has been erected when the NCN7 cycle path joins the A86, presumably to stop children from cycling onto this busy road. However, this blocks the dropped kerb at this location, and no alternative is available without cycling some distance into Kingussie on a footpath which is not marked as shared use.
The barrier also limits the entrance to the cycle track, which could make it difficult for people with trailers or alternative bikes
Phil Wigglesworth // 1 thread
They're building lots of flats off Rustat Road, which is on a major cycle route and also is the main area for freloading railway station users.
There are some issues with control of the building work, specifically:
- trucks blocking Fanshawe and Rustat Road at peak times causing dangers to cyclists
- mud on the road making the Fanshawe/ Rustat road junction dangerous
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Outline application for the demolition of existing industrial and office units and 5 dwellings and the erection of up to 90 dwellings, together with associated garaging, parking, public open space, landscaping, access, highways drainage and infrastructure works. All matters reserved except access.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Demolition of Daedalus House and construction of a new 7 storey office building comprising of 9026 sqm (GEA) of office floorspace (class B1); cycle parking spaces; associated plant; hard and soft landscaping; a basement with 51 car parking spaces and 7 motorcycle bays; infrastructure works. | Daedalus House Station Road Cambridge Cambridgeshire CB1 2RE
Created by Jean Dollimore // 1 thread
Official title: "CENTRAL LONDON CYCLE GRID - PRATT ST AND DELANCEY ST PROPOSED WALKING AND CYCLING IMPROVEMENTS"
This consultation proposes the construction of an important two-way east-west cycle route across Camden Town.
It will run from St Pancras Way along Pratt Street, across Royal College Street to Camden High Street, where a two-way cycle crossing will be provided.
It will then run two-way along Delancey Street as far as Mornington Terrace.
A later consultation on the continuation of this route to Regents Park is promised.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by Jack Thurston // 0 threads
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
Created by Clare Rogers // 17 threads
Enfield Council through Cycle Enfield are seeking views from the public on a number of ideas for the area shown in the map. In their words:
"We have a number of ideas that will not only help more people to walk and cycle but will also enhance community spaces, making Haselbury Neighbourhood a better place to live. Help shape our designs before we carry out a consultation later in the year. You have until Sunday 1 July to share your views."
***Note that there are separate threads below for each of the 13 drawings***
THESE DESIGNS ARE NOW REVISED FOR THE STATUTORY CONSULTATION
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here where the tram lines curve across Sheffield Road to the Birley Moor tram stop. The rails cannot be crossed at right angles.
There is loads of open space around here where off road cycle paths could be installed.
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Simon Still // 3 threads
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
Created by JonC // 2 threads
Blake Hall Road is an important and pleasant north-south route for cyclists and is often used by groups avoiding the busy roads in North Weald and in Ongar. However, crossing the A414 can be very difficult due to fast moving traffic from both directions.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.