Route across Peckforton Hill (NCN45) at risk
NCN45 across Peckforton Hill at risk of being closed
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
NCN45 across Peckforton Hill at risk of being closed
Created by tomguha // 1 thread
Cycle lane on Tooting High Street often blocked by cars
Created by Jim Chisholm // 1 thread
The traffic lights in Gt Shelford (Freestones Corner) are being replaced.
They've already done the DDA compliant paving and the cabling for the new lights is I believe done.
There may be an opportunity for ASBs and approach lanes on at least one of the A1301 approaches. Often motor vehicles turn left across those on cycles with only some 50% of left turning traffic correctly indicating
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Tim P // 1 thread
The current A3 route through Purbrook is very dangerous both northbound and Southbound.
From both directions, there are shared Bus/Cycle lanes, which approaching from the south stop at the roundabout, and from the north stop at the traffic lights before it.
When traveling Northbound, the uphill section past the shops results in a slower moving cyclist, generally holding up Traffic, which causes lots of aggressive, close overtakes, which in a narrow road when "sharing" with HGV's and buses, is not a pleasant experience. Many cyclists therefore jump onto the pavement if feeling unsafe, or do not cycle this section.
When travelling southbound, most of the time the traffic is slow due to queuing for the roundabout, but the narrow, on route cycle route squeezes cyclists between parked cars and slowly moving traffic, directly in the door zone.
Given the remainder of the A3 Portsmouth/London Road corridor is of signficicant benefit to those that commute from Denmead/Waterlooville/Clanfield area towards Portsmouth, this is a real bug bear.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Demolition of an existing sports pavilion, erection of a new sports pavilion, alterations to an existing car park and a vehicular access, a cycle shelter, new flood-lit artificial surfaced sports pitches and associated soft and hard landscaping.
St Marys School Playing Field Long Road Cambridge CB2 8PX
From the Design & Access Statement:
9.4 Cycle Parking
The Cambridge City County Local Plan 2006 Appendix D obligates schools to provide 50% of cycle spaces for children aged 5 to 12 and 75% for children over 12 years old. Under the same Local Plan, the college is obligated to provide cycle spaces for all students plus 1 for every 2 members of the staff.
The proposed pavilion will provide a changing space for maximum 4 teams of 20 players plus 2 staff each, therefore we declare to provide cycle stands for a minimum of 84 bikes.
Current site layout allows for 62 cycle spaces under roof canopy and 64 uncovered stands, therefore exceeds the minimum requirement defined in the Local Plan.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Erection of dwelling following demolition of existing triple garage block. New vehicular access from highway to serve existing dwelling.
4 Cavendish Avenue Cambridge Cambridgeshire CB1 7US
House includes a combined bin and cycle store for three cycles. The space indicated on the drawing does not appear big enough for both bins and cycles. I question whether providing for three cycles is enough considering there is room for at least two cars.
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Redevelopment of St John's Innovation Centre.
Not sure how this application was missed. But we should be aware of what is going on here. There are a few conditions pending consideration which may provide an opening to make comment if we determine the need.
There is a lot of sheltered cycle parking of both two-tier and Sheffield stand variety in several locations around the site.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Erection of 25 dwellings including 40% affordable along with access, car and cycle parking and associated landscaping
Land at Belsar Farm, Willingham
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3145/16/FL
South Cambridgeshire
Application reference : S/3145/16/FL
Created by Monica Frisch // 8 threads
Cycle routes and cycle paths need maintenance. This issue is somewhere to raise matters relating to standards of path maintenance, problems of poor maintenance, and examples of good maintenance.
Created by Ian Dent // 0 threads
There is developer interest in building houses on the existing arable land. Lime Lane (west end) is currently completely unsuitable for cycling. East End with off road cycle route is good. The developer should be encouraged to extend the existing cycle route parallel to Lime Lane to the junction with A608 and then, using a suitable crossing, to NCN.
Created by Cycling Dumfries // 1 thread
It's possible to get to the new shared-use path near the High School from the Caledonian Cycleway/ St Mary's Industrial Estate / Edinburgh Road using cut throughs and back streets but it's not at all clear. A couple of signs on the corner of the Moffat Road / Carnegie St, Greystone Crescent, and the Edinburgh Road and St Mary's Road path entrances, plus a fingerpost at the junction of the three paths at the foot of the Caledonian Cycleway would be really helpful to make the most of this developing off-road network
Created by Cycling Dumfries // 1 thread
Torthorwald is only a couple of miles from Dumfries but very few people are willing to cycle on the Lockerbie Road/ A709. An off-road path running parallel to the road down to Heathhall forest would connect up with the Caledonian Cycleway and provide an accessible route into town.
Created by Colin Wing // 1 thread
Proposal for the introduction of two-way traffic operations on Brook street (between Bond Street and Grosvenor Square) and Davies Street (between Brook Street and Berkeley Square)).
Created by goodlegs // 1 thread
More than once I have been waiting at Warburton Road as it meets Mare Street for a break in traffic so that I can cross to Tudor Road (which is filtered for motor traffic so a nice way to reach Victoria Park) when a car behind me has been very agressive. On one occasion I was "nudged" by the driver literally driving into my back wheel.
I think the aggression stems from:
a) drivers using this route precisely because they are in a hurry / rat running to avoid the traffic lights on Mare Street, so not being willing to be held up
b) drivers not understanding "why doesn't he go?" when it would have been possible for me to turn left (as the driver wants to). I need enough clear space on both sides of the road to go straight across.
Created by MJR // 1 thread
This area is proposed for development. It is of strategic interest because access will almost certainly cross National Route 1 and it would be good to have very good cycling connectivity to avoid adding unnecessary cars to the roads in this area.
Created by jpennycook // 2 threads
Outline application for up to 150 new homes and to include access
Land At Redlands Reading Road Sherfield-on-Loddon Hampshire RG27 9EA
Basingstoke
Application reference : 16/02457/OUT
Created by George Reeves // 0 threads
This is pointless and dangerous ASL it encourages cyclists to squeeze between large vehicles(anything transit van and above) There is the added danger of the railing a relic from when a secondary school stood on this corner.
Created by M Stanley // 1 thread
Message from Cycling UK:
It has been brought to Cycling UK’s attention that an exciting new bicycle project is under consultation in your local area of Leeds, which would benefit from supportive comments from local cyclists.
You can submit your comments up until the 16th December.
The project is the conversion of a Local Authority owned golf course (Middleton Park Golf Course ) into Leeds Urban Bike Park. The vision is that the Bike Park will eventually comprise a number of progressive trails for all levels of cyclist, plus BMX and play tracks, together with a community building providing a café, bike hire and maintenance facilities and other community use spaces.
It is proposed that the facility will be operated and managed by Cycle Pathways, a Community Interest Company Limited by guarantee.
Cycling UK would like to thank you in advance for taking time to submit your comments on this wonderful project proposal in Leeds.
Respond to the planning application:
Full details and documents:
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Erection of extensions to Norfolk Building for common room, 16 student rooms, college offices and research space, cafe and kitchens; erection of 6 family accommodation units; landscaping and cycle parking following demolition of maisonettes.
St Edmunds College Mount Pleasant Cambridge CB3 0BN
"The College currently has 304 cycle parking spaces that includes 146 Sheffield hoops providing 292 spaces and 12 single V stands. The current proposal is to add a further 22 Sheffield hoops under a cycle shelter providing a total of 348 cycle spaces."
Created by Roxanne (Cycling Campaign Officer) // 1 thread
The proposal comprises the conversion of the existing end terrace known as No.48 New Square and will comprise of 3No. self-contained flats, the demolition of the existing garage and the erection of 1No. self-contained studio-flat and the removal of 4No. Parking bays accessed via Willow Walk and the erection of 1No. self-contained flat. All with associated landscaping and access arrangements.
48 New Square Cambridge Cambridgeshire CB1 1EZ
" Cycle Parking
Cycle parking has been designed in accordance with the Council’s current standards - Cycle Parking in Residential Developments (2010). The new flats are to be provided with a communal covered and secure cycle store within the building fronting Willow Walk. Access will be solely via New Square through the communal garden.
The store will be fitted with steel Sheffield cycle stands spaced in accordance with Diagram 3 of the above guide. Access gates are to be a minimum of 1m in width where required, and fitted with mortise locks."
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Change of use of HMO and takeaway to a three storey rear extension, and roof extension to form 3no new flats. New rear annexe to create a further 2no flats.
61 Norfolk Street Cambridge Cambridgeshire CB1 2LD
Application reference : 16/1916/FUL
Very little description of cycle parking. The drawings look like "wheel-benders". Only 9 spaces.
"The area will consist of a grass area and the planting of a central tree. Footpaths provide access the rear building and to the proposed cycle stand."
"Access to the ground floor flat to 61 Norfolk Street is via an existing entrance door. Access to the rear courtyard, bin store and cycle stand is via a newly formed security gate and passage at ground floor level."
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Erection of 3.No four bed houses, internal access road, car and cycle parking, hard and soft landscaping.
Land Rear Of 268 Queen Ediths Way Cambridge CB1 8NL
Application reference : 16/1919/FUL
"CYCLE PARKING
Cycle parking has been designed in accordance with the Council’s current standards - Cycle Parking Guide for New Residential Developments (2010). The new dwellings are to be provided with cycle storage within the integral carport. This is of sufficient size to accommodate a total of at least 4 cycles."
Created by Sam Wakeling // 0 threads
Through traffic drives along South Road and goes down Parsonage Crescent as a short-cut to access Walkley Bank Road rather than going down to the turn opposite The Florist.
On an evening peak this is done by about 1/3 of all the outbound traffic on South Road (220 out of 670 motor vehicles per hour). In the evening peak cycle traffic is almost exclusively outbound, with 87% using this route from South Road and down Parsonage Crescent.
Stopping motor access to the top of Parsonage Crescent would remove traffic from this narrow residential street and also create a safe and convenient way for people cycling to access South Road up from the Rivelin direction without needing to cycle up Walkley Road, crossing the difficult turn at The Florist, which has heavy traffic and no protected space.
As with all routing of motor traffic away from a route of maximum convenience it should show some level of traffic evaporation from the area. The current pedestrian crossing on this arm could be removed as no motor traffic would have to be crossed.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Shaun McDonald // 1 thread
Dove Street is currently one way. It would be useful if it could be made 2 way for cycling for peopl coming from St Helen's Primary School to NCN 1.
The left turn from St Helens Street into Dove Street is much easier than a right turn from St Helens Street into Regent Street, as you don't have to block a lane of traffic and hope for a gap in the traffic in the opposite direction, especially with kids. It's also a shorter route when heading towards the town centre.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Cycling Dumfries // 1 thread
No safe route from Collin to Dumfries town centre - the A75 is a dual carriageway along this stretch of road with no direct alternative route
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Andrew Woodward // 0 threads
The route from Kingston Bridge into Church Road and up to Bushy Park traverses busy traffic routes with little protection for people cycling. Making this short section easier and safer for cycling would provide an important link to join up the quiet routes from Hampton through Bushy Park to Kingston town centre.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”