Traffic Light Sensor
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by Tom Chance // 1 thread
Making it safe and convenient to travel from Sydenham Hill onto London Road and then onto Wood Vale would improve the link from this part of Sydenham / Crystal Palace into East Dulwich and onto the LCN 25 and 22 routes north.
Currently one can either dismount at the bottom of the hill, cross Sydenham Hill and then London Road by foot and then take the off-road cycle lane onto Wood Vale; or one can cycle left onto London Road, cross two lanes of traffic, brake into the little cut and cross over the southbound traffic to get onto Wood Vale. The first route is slow and inconvenient, the second is dangerous.
Created by David Earl // 1 thread
According to the Cambridgeshire Road works register, Pembroke Street is going to be closed for a long period starting September 2 by the museum of Zoology. Not clear what, if any, the impact on cycles would be, but the hole will be a dramatic 10m deep, so the works will presumably be quite extensive. Also, Tennis Court Road closed for one day on August 9 to prepare.
http://roadworks.org/?u_se_id=30862209:1&e=545014&n=258186&z=7&t=b
Created by Chris Sandbrook // 1 thread
I have just watched a police car over-run the advanced stop lines twice on Gilbert road, once at the Carlton Way cross roads and then again at the Milton Road T-junction. Both times the police car was approaching an already red light, so they had ample time to stop before the line. The second time they filled at least half of the box. If the police in Cambridge can't be relied on to respect the advanced stop line, how can we expect the general public to do so? Does anyone have similar stories or any suggestions on what to do about it? I didn't get the number plate unfortunately, because I thought turning round and photographing a police car on my phone might be more trouble than it's worth!
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by WilliamNB // 0 threads
When cycling north-bound along Tavistock Road, there is a cycle lane in places. Once out from under the Crownhill Road bridge the lane turns sharply left, forcing cyclists to yield to traffic joining Tavistock Road from the left.
The Highway Code states you should yield to traffic from the right and this junction is very dangerous to cyclists. It would be far better to simply continue the cycle lane straight ahead and erect yield signs to traffic joining Tavistock Road
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Martin Lucas-Smith // 1 thread
The Cambridge News reports that new traffic calming is to be installed on Fen Road.
Cyclists' views ought to be included so the opportunity is taken to improve things for cycling rather than make things worse.
http://www.cambridge-news.co.uk/News/150k-project-to-tackle-Fen-Road-racers-20130803060000.htm
Created by DaveE // 0 threads
The dropped kerb is about 5-10m down the pavement from where the cycle-path meets the road. This encourages cyclists to cycle along the pavement and there are no shared use signs to warn pedestrians.
Created by DaveE // 0 threads
The link between the cycle-path and Trent Close is missing. It is expected that cyclists should dismount, negotiate a large number of parked cars, and an un-dropped kerb to go from cycle path to road or vice-versa. This is unreasonable and I can't think of a reason not to have the cycle path join straight into the end of the road with no interruption.
The current situation encourages cyclists to cycle along the pavement for entire length of Trent Close to reach a dropped kerb, causing unecessary delay and potential conflict between cyclists and pedestrians, as the pavement isn't very wide.
Created by DaveE // 0 threads
The road surface on Wimlands Road is quite dangerously poor. There is much gravel on the road, particularly in the centre, and there are numerous small potholes to dodge.
This is leading to a risk of accidents involving cyclists and putting off inexperienced cyclists from cycling to work.
Created by DaveE // 0 threads
The lights seem to always wait until no traffic is coming on the road before changing in favour of cyclists/pedestrians using the cycle route (NCN 20) to cross the road.
The road is very busy and this equates to extended unecessary delays. What is the point in lights that hardly ever stop cars?
This, combined with the terrible surface of the path to the south, is discouraging cyclists from using the cycle route, pushing them onto the very busy road junctions to the east and west, which have little to no cycle provisions.
Another effect is encouraging people to take risks crossing before the ligths have changed, and leaving the lights to (eventually) change when no-one needs to cross any more.
Created by DaveE // 0 threads
The lights seem to always wait until no traffic is coming on the road before changing in favour of cyclists/pedestrians using the cycle route (NCN 20) to cross the road.
The road is very busy and this equates to extended unecessary delays. What is the point in lights that hardly ever stop cars?
This, combined with the terrible surface of the path to the south, is discouraging cyclists from using the cycle route, pushing them onto the very busy road junctions to the east and west, which have little to no cycle provisions.
Another effect is encouraging people to take risks crossing before the ligths have changed, and leaving the lights to (eventually) change when no-one needs to cross any more.
The condition of the cyclepath is so bad that a road bike with narrow tyres cannot be comfortably or safely ridden along the cycle side of the segregared path. There are numerous potholes of more than 25mm depth and quite a bit of loose gravel besides a generally very rough surface. The surface is more pothole than surface in places! It is even bad for mountain bikes and especially bad for small wheeled bicycles such as folding bicycles. This is forcing cyclists to use the pedestrian side of the path, with the potential for safety issues and confrontation. Last seen mid July 2013.
Cycling provision totally inadequate in proposals.
Created by Jon Warbrick // 1 thread
Contractor's safety fencing for some of the work going on adjacent to Addenbrookes has been put up on the adjacent cycle path, presumably because it's easier to to that than put it up in the building site itself. Unfortunately this obstructs about a third of the path.
Whoever did this obviously realised that this was problematic, since they have painted the path side of all the bases yellow. Unfortunately this doesn't help in the dark.
I can't see any obvious contact details for the contractors, apart from 'Tamdown' on an attached 'Danger - Deep Excavation' sign. Anyone any idea how to get this addressed?
Notice is herby given that Southampton city council
proposes to make the following
The City of Southampton(various roads)
(movement restrictions)(amendment no9)order 2013
1. the effect of the order is to remove the contraflow cycle lane on
second avenue between first avenue and the north-westernmost
access to the NXP site, approximately 150metres south-east of allington
road thus reverting this part of second avenue to two way traffic. The
contraflow cycle lane will remain on the part of second avenue between
the north-westernmost access to the NXP site and allington road.
2.Copies of the order, relevant map and statement of reasons for
proposing may be inspected during normal working hours at my enquiry
office. Further information may also be obtained from the Southampton
Highways Partnership (traffic management) on 02380798064
3.Any person wishing to object to the order must write to at the
address given below or email:
Traffic.Orders.legal@southampton.gov.uk stating the grounds for
objection within 21 days of this notice (i.e. by 2 August 2013)
Dated 12 July 2013
Richard Ivory Head Of Legal, HR and Democratic Services,
Created by Sam Saunders // 0 threads
The Brunel Mile is a notional route between Millennium Square and Temple Meads Station. A video (date uncertain) on the Better By Bike website shows the intended journey. http://www.betterbybike.info/video-list/millennium-square-to-bristol-temple-meads-along-brunel-mile
Some of the route shown in the video corresponds with Bristol Cycling Campaign's important orbital freeway: Fo1 Inner Loop Redcliffe Way to Triangle. (see https://maps.google.co.uk/maps/ms?msid=213139683046776952805.0004d820d652973f23c70&msa=0&ll=51.491805,-2.665343&spn=0.025758,0.032959&dg=feature) To enable a network to develop coherently as it grew, Fo1 would be our recommended route.
As it stands (July 2013) there is only one short section of the Brunel Mile that meets a majority of the criteria that would characterise a cycling Freeway, namely the segregated cycle lane across Redcliffe Bridge which fails only on the "continuous" criterion. It seems important that all of it should do, as a priority, given that sections of the Brunel Mile are very heavily used by cyclists and pedestrians, especially at peak times. For many visitors coming by train with cycles or using the Brompton Dock at Temple Meads this will be a first experience of cycling in Bristol. It needs to make sense and to be easy to use first time.
Issues and suggestions, as things stand, are as follows
1. Pero's Bridge already has too much pedestrian and cycle traffic. It is often uncomfortable for pedestrians and for cyclists. Keeping it as part of a major cycle route through the city is unacceptable. Route Fo1 uses Prince Street instead, where a wide segregated cycle lane would be feasible.
2. The Royal Oak Avenue, Queen Square and Bell Avenue sections would benefit from clear segregation of pedestrians and cyclists, along the lines suggested by the de facto segregation that tends to happen at peak times.
3. The pedestrian and cycle crossing at Welsh Back might benefit from an analysis of behaviour at that junction and consideration of standards adopted in other places. Casual observation suggests a great deal of uncertainty among all road users as to what is supposed to happen and who has priority.
4. At the end of Redcliffe Bridge cyclists are faced with uncertainty as to whether to continue along the paved area beside Freshford House or use the pavement alongside Redcliffe Way. Signage at that point (as it is all along the route) is confusing, inconsistent and unspecific.
5. Crossing Redcliffe Street by cycling straight over the zebra crossing and expecting cars to stop seems to be condoned, and practised. This doesn't feel right and matches no standards that I am aware of. A clear decision needs to be made about how cyclists and pedestrians can cross here without arcane knowledge of "Bristol Rules". Many of those using this (as on the other crossings on the Brunel Mile) are visitors to the city on their first mile of city cycling.
6. The following section of Portwall Lane could be made into a fully segregated cycle lane, with a better crossing at Phippen Street. The numbers of pedestrians, cyclists and out-of-office smokers on this section can be very high and leaving the traffic to fend for itself is inimical to a genuine 8-80 environment.
7. At the end of the Portway there is great ambiguity about how to reach Temple Meads on a bike. The Better By Bike video shows the least satisfactory option that ends abruptly on the wrong side of Temple Way with two busy pedestrian crossings and an unsatisfactory cobbled road to negotiate before reaching the front of the station. Most cyclists seem to use one of the more direct routes over light controlled crossings to The Friary, thence to the side entrance of Temple Meads where the presence of the Brompton Docks and the Cycle Hub van give a natural welcome.
8. Development work on the derelict "island" around Portwall Road East should take full account of the existing use of that section as a crossing point for cyclists and pedestrians getting to and from Temple Meads Station.
In conclusion, A cyclist coming off the platforms at Temple Meads should be able to see very clear signs about which exit to use, and which path to use to get to Bristol City Centre. At present there is nothing at all. Once they have made an exit they should be able to see cycling specific signs that are prominent and clear. They should then be able to follow a designated route that is self-evident and waymarked. The current pedestrian signs are elegant and have good maps, but they are no more use to cyclists than they are to motorists.
A cyclist wanting to get to Temple Meads Station from Bristol City Centre should be able to find the Brunel Mile (on Fo1) from wherever they are without too much difficulty, and then follow it confidently all the way to the railway platforms.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by Eric Booth // 1 thread
I need to report a problem with a route in Whitehall. The council made a hoohaa about linking the cycle path to St George Park. They installed a contraflow in Stretford Road, a bike crossing over Whitehall Road and signage between the cycle path and the park. Laudable. I have used this route to take my daughter to Whitehall Primary School on Johnsons Road for the last year. She had her first Bikeability Lesson on Sunday and is now riding to school (aged 6 - v. proud!!). However, where the link goes through a snicket between the Kings Head pub and Packers Field it is being blocked by cars. This is making navigating a blind corner even more dangerous. Links to pictures below.
A lot of money was spent on this link and its being rendered unusable.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by Elizabeth E. // 1 thread
TfL are making changes to junction because of safety issues.
For Cyclists:
Two-stage right turns at the junction in the west to south and east to north directions
An early release at the traffic lights on all four arms of the junction
Deeper Advanced Stop Lines (ASLs)
Mandatory cycle lane on Camberwell Church Street westbound approach to operate at all times
St Giles bus stop moved further west from the Vicarage Grove junction to improve safety of left turning cyclists on the LCN 23 cycle route
Resurfacing throughout the junction.
Retention of the 20mph speed limit at the junction and on all the approaches.
Created by Andrea // 1 thread
Remove left-turn priority filter: if you want to cycle to the station from Stoke Park Drive, you currently get a lot of stress from drivers honking at you from behind
Created by Jean Dollimore // 1 thread
Camden is consulting on improving safety for pedestrians in the vicinity of Hampstead School in Westbere Road.
See StreetView from Lichfield Road (Barnet) towards Westbere Road Camden showing Hampstead School on the left and the 20 mph sign
Created by jpennycook // 1 thread
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Kate Ravilious // 2 threads
The Fishergate Gyratory is a complete nightmare for all cyclists and very dangerous. Crossing the lanes of the busy dual carriage-way is dangerous and drivers show little awareness or patience with cyclists. The entire junction needs rethinking.
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Created by North Devon Cycling Forum // 0 threads
Change of Road lay out on Long Bridge; NO new centre road line when road is due resurfacing and long term research into "shared space" alternative road surface
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by jpennycook // 1 thread
Erection of Class A1 and Class A3/A5 units. Provision of highway works and alterations to access; parking; landscaping; service infrastructure; and associated works and improvements.
St Michaels Retail Park The Harrow Way Basingstoke Hampshire
Basingstoke
Application reference : 16/04208/FUL
NCN45 across Peckforton Hill at risk of being closed
Created by Simon B // 1 thread
Adjacent to existing apartments on Sealand Road near the Cop is a new development currently under construction by Watkins Homes Ltd. Curently there is a barriered-off ramped access to Sealand Road to cross the Canal entrance to the river that leads around the exisiting apartments. This was originally envisaged as part of a continuous shared use riverside route.
The development of the site offers the opportunity to ensure that shared use access can be maintained, developed and improved along the riverside route that skirts the perimiter of the Racecourse and continues to the River Dee path that leads to Garden City and Queensferry. This could be before residents purchase properties who could well be resistant to a pathway near their new homes.
Whilst the access to the River Dee from the Shropshire Union Canal presents a barrier to a straightforward continuation of the riverside route to join the River Dee shared use path into Wales, the creation of a small extension around the permiter of the new development under construction would mean that an attractive continuous offroad route could be created with minimal additional works (widening of the existing footway for approximately 100mtrs).
It would be helpful to gather thoughts and ideas before the developers and Planning and Highways Department of the Local Authority are approached about this opportunity
Created by Roxanne (CEO) // 0 threads
Plans are emerging for development on the Coldham's Lane site with implications for the surrounding area including links with Cherry Hinton.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Simon Nuttall // 3 threads
London Cycling Campaign's Space for Cycling campaign
Has a clear message - what can we learn from them?