South Cambridgeshire Local Plan review
South Cambridgeshire District Council are reviewing their Local Plan. It is important that cycling issues are dealt with and brought to their attention during this process.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 6 threads
South Cambridgeshire District Council are reviewing their Local Plan. It is important that cycling issues are dealt with and brought to their attention during this process.
Martin Lucas-Smith // 9 threads
The Great Kneighton (Clay Farm) development will have effects on cycling. A series of planning applications have been passed and more will come.
Nigel // 0 threads
Department for Transport press release 23 March 2012:
http://assets.dft.gov.uk/press-releases/20120323a/east-england-fact-sheet.pdf
Cambridgeshire "Better Bus Area Fund"
Cambridgeshire will receive £1,724.000 to improve accessibility, bus journey times on key bus routes in Cambridgeshire. The changes will include new traffic management on four corridors into the city, bus priority, upgraded buses, improved interchanges (including with Guided Busway), smart ticketing top-up on street and real time passenger information. For further information, go to http://www.cambridgeshire.gov.uk/NR/rdonlyres/1BA212D3-E038-47C5-9E0A-50E2BDBE3AB7/0/CambridgeshireBBAFproposalFINAL.pdf.
The proposals include much of relevance for cyclists, including bus priority at junctions, a "bus gate" through the middle of Mitcham's Corner and more.
Created by Simon Nuttall // 1 thread
A campaign member and resident of the area has sent this:
I've just received a consultation paper from the City Council for residents of Stanley Road, Garlic Row and Oyster Row. I've summarised the proposals below.Scheme 2 Option B seemed the most significant.
Scheme 1. Extension of parking and loading restrictions on Stanley Road
Scheme 2, Option A. "No entry except cycles" on Garlic Row adjacent to the junction with Mercers Row
Scheme 2, Option B. Oyster Row becomes one-way in the northeasterly direction. No exemption for cycles.
Comments to Gavin Card at the City Council by the 30th March (gavin.card@cambridge.gov.uk or PO Box 700, CB1 0JH)
Created by Rohan Wilson // 0 threads
The Grove Pub. Transport Statement recognises that 19 cy spaces should be provided (1 per 15sqm public space), states they are in "garage" but details not given, just assumed space available. Needs closer look. TRICS database for a Leeds Sikh Temple shows no cycling, 16.4% walking, 3.6% public tpt.
Created by George Coulouris // 0 threads
The Foot tunnel should be more accessible
Martin Lucas-Smith // 0 threads
Blackfriar's Bridge is a major collision blackspot that actively discourages people from cycling.
Created by Gregory Williams // 0 threads
The cycle parking standards for Medway can be found here:
http://www.medway.gov.uk/pdf/Medway%20Council%20Residential%20Parking%20Standards%20Jan%202010.pdf
The standards have low minimum quantities and are very basic in their detail. There is no mention, for example, of the minimum space needed to be left around cycle parking, or the spacing of the cycle parking for it to be effective. Nor is there any mention of what constitutes an acceptable type of cycle parking (e.g. Sheffield stands) and what is unacceptable (e.g. wheelbenders). No mention is made about provision of covered cycle parking. No mention is made of the proximity of cycle parking to building entrances. No mention is made of the need for cycle parking to be highly visible and for lighting and CCTV coverage.
Created by Simon Nuttall // 1 thread
The cycleway between Fen Ditton and Horningsea
Created by Rohan Wilson // 0 threads
The adjacent, approved plot, 11/05530/FUL designed by the same architectural practice, places the cycle cupboard next to the front door and closer to it than is the car.
THIS proposal, however, offers the standard back-of-garden shed for bins and bikes, with the bikes beyond the bins, while the car driver door is adjacent to the house front door...
Note Manual for Streets 8.2.1, quoted in a prominent panel on p5 of the Cambridge Cycle Parking Guide:
"In residential developments, designers should aim to make access to cycle storage at least as convenient as access to car parking."
Created by Rohan Wilson // 1 thread
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The site is proposed as study rooms for students aiming to enter university. Thus they would be old enough to cycle independently within Cambridge, for example between their places of residence and the various study buildings.
Remarkably, it is suggested (Planning Statement) that the students might park their bikes on Station Road where cycle parking is available, and might be augmented, and walk to the proposed site. This is a distance of 700m, taking 10 minutes at a normal walking pace plus any waiting time to cross the East Road/ Regent Street junction. Any student with a cycle at Station Road would be likely to wish to use it to continue to the proposed site, if parking arrangements provided there were reasonably convenient and secure.
We are told that the Regent Street site is closer to the student residences than Free School Lane, but no more definite information is given as to how far the residences are from the proposed site or from Station Road.
The city's cycle parking standards are presumably set to reflect normal levels of demand from staff and students, and no explanation is given as to why "very few students have bicycles".
The access to the suggested cycle parking in a narrow yard at the rear of the building is presumably the gated passageway to its north. This is not made clear, nor is it clear whether there are steps to be negotiated. It seems impossible that more than perhaps a dozen bicycles could be parked in the yard most of whose width appears to be less than a bike's length, leaving no room for daily or emergency access with the parking arrangement indicated.
The transport aspects of this proposal have not been examined in sufficient detail for their impact to be properly assessed, but it is certain that there is insufficient space for the level of cycle parking required. There appears to be no disabled access. We therefore object.
Created by Rohan Wilson // 1 thread
12/0342/FUL 12 cycle spaces indicated but space looks inadequate (no dimensions or layout shown)
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The site is on a local cycle link and thus it is reasonable, in the context of Cambridge, to anticipate a high proportion of parents and children arriving by bicycle. Indeed, bearing in mind the limited car parking available we would recommend that a travel plan strongly promoting cycle access for staff and users be required.
We object because we do not believe that the cycle parking space(s) allocated are consistent with the stated aim and the need to achieve high cycling levels. In particular, tagalongs, trailers and large carrier-bikes are likely to form a high proportion of customer cycles. The dimensions of the small, unsheltered enclosure (designed as a bin store in the current use of the site?) and a proposed layout are not given but look insufficient, and include a narrow entrance.
If cycles for say 30% of 18 customers, their children and 8 staff were to arrive by bike (say 3 staff, 6 adult customers and 8 children during a single class) then allowing a 50% margin for changeover between classes, space would be needed for a variety of types of bike and trailer to accommodate some 3 staff, 9 adult and 12 children customers.
This sort of calculation and the detail of the use of the cycle parking spaces do not seem to have been presented by the applicant, and should be required and assessed before the application is determined. We suggest that at least one car space would have to be used to accommodate sufficient cycles on this site.
Created by Gregory Williams // 1 thread
Proposed 20mph speed limit along School Road, Saltwood. The design involves removing the buildout at the Brockhill Road junction and installing overrunnable humped buildouts at regular intervals on alternate sides of School Road. "Gate" features with kerb buildouts to restrict the road width will denote the start and end of the 20mph zone.
Martin Lucas-Smith // 1 thread
The Penny Ferry Path (Halingway) entrance remains rather poor even after the changes a few years ago.
The application proposes to design a new lobby for this department and to relocate the cycle racks.
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
This application proposes to demolish every but the façade of 55-57 Regent Street and create a restaurant with 14 residential units
Martin Lucas-Smith // 1 thread
Cycling on Long Road can be pretty hazardous and unpleasant. There needs to be a lower speed limit (30mph) as a minimum.
Created by Gregory Williams // 1 thread
This portion of the cycle path near Reed Pond gets quite muddy on an annual basis. In the autumn / winter / spring it can sometimes be quite difficult to traverse.
Created by Gregory Williams // 1 thread
The gaps between the boards on the ramp connecting to the Weir Court cycle bridge mean that cyclists crossing the bridge could get their wheels caught in the gaps.
Created by Gregory Williams // 0 threads
A new playground is being proposed in the vicinity of Vauxhall Avenue. The playground is welcome, but it is important that its placement does not jeopardise the long-term ambition of a riverside cycle route.
Created by Gregory Williams // 1 thread
The cycle parking at the new Waitrose in Ashford is positioned such that some spaces are not available for use. One rack is too close to a bollard. Both racks are too close to each other.
Created by cobweb // 2 threads
Burwell is scheduled to be expanded by East Cambs and there are fears it might end up car centric.
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Gregory Williams // 1 thread
Canterbury planning permission CA//09/00142 includes an emergency access road, which is intended to be open to cyclists. This provides a vital link in the riverside cycle route in Canterbury. The rest of the construction on this planning application has been completed, but, contrary to conditions 12 and 13 of the appeal planning permission the emergency access link and the final portion of the cycle path have not been constructed.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
this old fashioned barrier on a major cycleway needs a rethink
Created by North Devon Cycling Forum // 0 threads
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
Created by Simon Still // 2 threads
For pedestrians
Relocate the crossing at the junction. At the moment pedestrians on the eastern side of Streatham High Road cannot see oncoming traffic around the bend and vehicles cannot see people crossing. By relocating the crossing that is currently north of the junction on Streatham High Road to where demand is higher and making it a straight-across signal-controlled crossing we can make it safer for all road users. This relocated crossing would replace the existing unsignalised crossing on the southern arm of the junction where there is significantly lower demand
Create a raised imprint block-paved effect crossing on Gleneldon Road indicating to drivers that pedestrians are likely to be crossing making it easier and safer for people approaching the relocated crossing.
For cyclists
Cycling would be permitted in the proposed bus lane on Tooting Bec Gardens (see below).
For bus passengers
Introduce a bus lane on Tooting Bec Gardens approaching the junction by removing some parking. 15 high-frequency bus routes pass through the junction. Delays resulting from the new crossing would be mitigated by a new 170 metre bus lane on Tooting Bec Gardens approaching the junction. There are often gaps in the parking so the proposal minimises the overall loss of parking spaces and makes more efficient use of the space (see the drawing for the location)
Ban the right-turn into and out of Shrubbery Road on Streatham High Road. Northbound buses are currently delayed by vehicles turning right into Shrubbery Road, approximately 150 metres north of the junction, because of a short right-turn pocket in the road. We therefore propose to ban the right-turn from Streatham High Road into Shrubbery Road for all traffic. There would also be a longer right-turn pocket to allow vehicles to queue without blocking traffic when turning into Sunnyhill Road. Vehicles turning right out of Shrubbery Road can also delay southbound traffic including buses so it is proposed that is banned too. Before we make the banned turns permanent we would monitor congestion and bus delays to confirm if it is necessary to mitigate the impact of the relocated crossing and making it controlled and will publish our findings
We would need to extend the right-turn ban from Mitcham Lane into Streatham High Road southbound to include buses. This wont have an impact on bus passengers as this turn is only used by buses 'not in service'. By fully banning the turn we reduce the traffic impact of the relocated crossing and making it controlled.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by Jack Thurston // 0 threads
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
Created by Clare Rogers // 17 threads
Enfield Council through Cycle Enfield are seeking views from the public on a number of ideas for the area shown in the map. In their words:
"We have a number of ideas that will not only help more people to walk and cycle but will also enhance community spaces, making Haselbury Neighbourhood a better place to live. Help shape our designs before we carry out a consultation later in the year. You have until Sunday 1 July to share your views."
***Note that there are separate threads below for each of the 13 drawings***
THESE DESIGNS ARE NOW REVISED FOR THE STATUTORY CONSULTATION
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here where the tram lines curve across Sheffield Road to the Birley Moor tram stop. The rails cannot be crossed at right angles.
There is loads of open space around here where off road cycle paths could be installed.
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Simon Still // 3 threads
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
Created by JonC // 2 threads
Blake Hall Road is an important and pleasant north-south route for cyclists and is often used by groups avoiding the busy roads in North Weald and in Ongar. However, crossing the A414 can be very difficult due to fast moving traffic from both directions.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.