Modify gate on cycle-path 46 near the castle
RAISED AT PUBLIC MEETING 10-04-2014
The cycle gate where route 46 enters castle meadows near the castle is poorly designed: very tight for long bikes such as tandems.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The cycle gate where route 46 enters castle meadows near the castle is poorly designed: very tight for long bikes such as tandems.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The cycle gate at the underpass between Llanfoist and Abergavenny is poorly designed: Impossible to pass with a 2-seat bike trailer, and very tight for long bikes such as tandems.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Several people mentioned that some people do cross the pipe bridge: Would it be possible to modify the bridge to make it possible for it to be an official crossing point?
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Can anything be done to improve this busy junction for cyclists and pedestrians?
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
School traffic from King Henry VIII School, exiting the school onto Pen-y-Pound, uses this very narrow route as a quicker way, at a busy times, of getting to the A40 or to Old Hereford Road. Can anything be done to discourage drivers from using these narrow lanes as a rat-run?
The issue of fly-tipping on Deri Road was also raised.
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Waiting to turn right onto Chapel Road from Brecon Road can be unpleasant. Can something be done to improve this junction for cyclists?
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Turning right from Park Street onto Pen-y-Pound, by Tesco, can be awkward, as eastbound cars often come around the bend from Frogmore street very quickly. How can this be solved?
Created by George Coulouris // 1 thread
We have of course been campaigning for a cycle and pedestrian connection enabling more direct movement between Kentish Town Road and Grafton Road for years. At one time a semi-official route via Arctic Street was actually established, but the landowner eventually vetoed it for various reasons.
How can we revive the campaign for this?
Created by Al Storer // 1 thread
The Draft Cambridgeshire Long Term Transport Strategy and Local Transport Plan Refresh has, as a City Deal item, a £43million project to create "Comprehensive segregated bus priority / Busway on Newmarket Road into Cambridge between Airport Way and Elizabeth Way / East Road."
This is quite clearly an opportunity to get far better cycle provision on this corridor.
Created by MJR // 0 threads
For a change, I tried following the route signs for the station today. As well as a mystery tour near the Grafton centre where the signs simply stop, my route was blocked at Gresham Road by "WET TAR" and a sign proclaiming it. No diversion was signed and there were no advance warning signs that would have let me pick a better route earlier. Plenty of people were riding along the footways - enough that it was too crowded for me to feel safe doing so. I performed a U-turn, waited a second time at the crossroad traffic lights and rode along the very busy Gonville Place and Hills Road instead.
I've tweeted at Cambridgeshire County Council and Cambridge City Council in https://mobile.twitter.com/mjray/status/453926972843118593 because I don't think that is legal - a cycle route suddenly being blocked by wet tar does not comply with the code of practice on safety at streetworks, which is required by law. I'm disappointed to encounter this in Cambridge.
Created by BrianInBeeston // 0 threads
The DfT have contracted consultants to come up with a concept for a north south cycle route broadly following the alignment of the HS2 railway line, but linking up key points of interest and centres of population along the way. For the section from East Midlands Airport to the new station at Toton, a key issue is where the cycle route should cross the Trent. There is a compromise to be made between the shortest route from EMA-Toton and locating the bridge where it would serve the largest population. A more Eastern bridge would serve large population centres in Beeston & Clifton, whereas a more western bridge would be a more direct route. A possible compromise would be to locate the bridge near the existing rail bridges at Trent Junction near Trent Lock.
Created by Sam Charrington // 0 threads
The National Speed Limit currently applies on this very narrow lane. There should surely be be a 20mph limit here? Pentre Road runs along the tops of a number of residential streets on the edge of Abergavenny. It is popular with cyclists and pedestrians. Much of the lane is extremely narrow, with some blind bends, and it is not possible to drive safely along here faster than 20mph.
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
We aren't aware of plans to replace this particular crossing with a bridge, but it does have the highest risk score of any crossing in the area, so will e on the Network Rail radar.
Created by BrianInBeeston // 0 threads
Following a number of deaths at crossings in this area. This footpath which crosses the midlands mainline is being considered by Network Rail for replacement with a bridge. Unclear at this stage if it will have steps or ramps
www.nottinghampost.com/Plans-new-bridges-railway-crossings-revealed/story-20914367-detail/story.html
Created by BrianInBeeston // 0 threads
Following a number of deaths at this crossing where a footpath crosses the midlands mainline, it being considered by Network Rail for replacement with a bridge. Unclear at this stage if it will have steps or ramps
www.nottinghampost.com/Plans-new-bridges-railway-crossings-revealed/story-20914367-detail/story.html
Created by BrianInBeeston // 0 threads
There has been a surge in use of the station during tram works. Some new users may continue using the station after completion. There is no car park so the village is full of cars. The cycle racks aren't heavily utilised, might be more cycle usage if secure cycle parking were provided.
Created by BrianInBeeston // 0 threads
A white dividing line was put down on University Boulevard in error by the tram contractor. It was not agreed by the City Council.
The white line will be removed. However the cycle path alongside University Boulevard is to be programmed for resurfacing - this will remove the white line and upgrade the surface. This work will be undertaken and paid for by the tram contractor as part of the works they are undertaking to upgrade cycle facilities along the new tram routes.
Created by Heather Coleman // 1 thread
When I popped into the Cambridge Wine Merchants last night, there were signs on all the posts and sheffield stands saying "no cycle parking from 6am, 7th April". I assumed some royal visit. I asked the man in the shop if he thought people not being able to park would affect trade and he said he hoped not. However, by the post where I normally park there's a big "road closed" sign, 6am-6pm (I think).
He is under the impression that there is filming going on from 7am-10am. It is period filming in the 1950s therefore you can't have sheffield stands (probably not invented) or modern bikes.
My main question/gripe is, when I see a "road closed" sign, I assume I will be able to get through even if I need to dismount and wheel my cycle. Sometimes, if it's a long walk, it may be quicker to cycle via another route. From the nature of what I've been told is going on, it sounds to me as if actually the road will even be closed to pedestrians, well unless they're wearing authentic 1950s dress.
Does anyone know any more? Does anyone know anything about the legal status of forcing pedestrians to take a lengthy diversion from what is the public highway? There are various cyclescape threads which have mentioned that although cars only have a permissive right to use the road, pedestrians have some stronger right. Can they force pedestrians and dismounted cyclists to go another route, when it's not an issue of national security?
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by timlennon // 0 threads
There are a lot of schools in our ward, and a lot of traffic. Children should be able to cycle to them safely without having to share space with high volume, fast traffic. Schools should all have 20mph zones, with car-free access around the school, and protected routes to arrive there.
this path isn't a right of way it has a locked gate.
sketch of route following verbal discussion between Brian & SB.
Created by timlennon // 0 threads
Bushy Park is a pleasant place to cycle and provides a number of potential routes for people wanting to get around the area. However, it should be possible to leave the Park at the Holly Road exit and proceed without the current level of potential conflict and threat inherent in the present route. We’d like to see protected space for cycling allowing people to leave the Holly Road exit and get to Broad Lane and the nearby schools - Denmead and Carlisle Infants.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Shaun McDonald // 1 thread
Dove Street is currently one way. It would be useful if it could be made 2 way for cycling for peopl coming from St Helen's Primary School to NCN 1.
The left turn from St Helens Street into Dove Street is much easier than a right turn from St Helens Street into Regent Street, as you don't have to block a lane of traffic and hope for a gap in the traffic in the opposite direction, especially with kids. It's also a shorter route when heading towards the town centre.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Cycling Dumfries // 1 thread
No safe route from Collin to Dumfries town centre - the A75 is a dual carriageway along this stretch of road with no direct alternative route
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Andrew Woodward // 0 threads
The route from Kingston Bridge into Church Road and up to Bushy Park traverses busy traffic routes with little protection for people cycling. Making this short section easier and safer for cycling would provide an important link to join up the quiet routes from Hampton through Bushy Park to Kingston town centre.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”