Anchor Road crossing
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by kirbyjames // 0 threads
The short length of narrow cyclepath contains two black bollards. (presumably to stop small cars using thbe cyclepath) These present a hazard to cyclists - we are aware of three cyclists havingh been injured hitting them.
It is recomended that they be removed.
Martin Lucas-Smith // 1 thread
This area of town has lots of children having to cycle round the main road because there is one-way cycling - we should get the council to make it two way.
Created by Rohan Wilson // 1 thread
An application for 148 homes 11/0008/FUL was refused by Planning Committee(against officer recommendation) on 4 April. Cycle parking "storage" is generally less easy to reach than car parking, and it appears that for the central blocks it is proposed in a shared basement area - I haven't found the drawing for the basement.
There is no access to the site except by the narrow road around the existing Westbrook office block - the site is a deep enclave.
The issues for cycling are probably virtually identical to previously. One of various reasons for previous refusal was "...lack of transport mitigation measures..." and the Highways provisional comment on the current one outlines concerns. I fear that cycle and pedestrian access issues were not previously considered grounds for refusal and that therefore we might be fighting a lost cause... have contacted the officer about this, and hope to submit a comment for Sustrans.
Created by cobweb // 8 threads
There have been problems before with unsatisfactory cycle parking and obstruction of the paths across this busy green space. New people are providing the ice rink this year though.
Created by Chris Lowe // 1 thread
Plans submitted for consultation on improvements to the A38 corridor. http://www.birmingham.gov.uk/LSTFBristolRoad
Created by Chris Lowe // 0 threads
This looks like it was designed originally as a cycle path - because of the way the kerbs are placed.
Would be a good cut-through for bicycles. Needs re-assigning as shared use, plus a dropped kerb at the Gilby Road junction.
Created by Chris Lowe // 1 thread
Monument Road is a serious barrier to cyclists using this designated cycle route. There is a pedestrian crossing, just down Monument Road, but the pavements are too narrow for shared use.
There needs to be a crossing to enable cyclists to move easily along the cycle route.
Created by Chris Lowe // 0 threads
This is signed 'no cycling'. It is a nice route to access the shops on the junction of Hagley Road / Monument Road, as it has very low traffic.
Needs to have cycling permitted, plus dropped kerbs at the north end for access.
Created by Chris Lowe // 0 threads
Nice road closure, but there is poor provision for bicycles to get through. The kerbs need work to be done, to allow bicycles to get through.
Created by Chris Lowe // 0 threads
Good road-closure, but there is poor provision for bicycle permeability. Needs gaps for bicycles (up to width of cargo bike / trike) to fit through.
Created by velocipedus@gmail.com // 3 threads
On Hills Rd Bridge (etc) a large message sign displaying 5 lines of text and two screens warns of delays because of upcoming building work in central Cambridge (Lensfield Rd etc)
I am minded to write to the city early on Monday
Re: Message signs warning of congestion due to street works
Dear Madam, Sir,
We would like to make an suggestion regarding the text displayed on the mobile message signs currently warning of major road works and congestion. Our suggestions would be to add the words “Thanks for cycling” and “Try the bicycle to avoid delays” (alternating).
We believe it is entirely appropriate to use any major road-works as an opportunity to encourage the use of active transportation, because it is proven to reduce congestion. Such messages will also deliver an important message about the status of cycling in the city. The expression of gratitude expressed in the first suggestion is especially important, as it sets a tone of public appreciation.
We would also like to remind you that a recent Freeway closure in Los Angeles was widely advertised by local authorities as “Carmageddon” and residents were encouraged to participate in local bike rides, organised by the regional transportation authority (METRO), to overcome the expected delays. Given our own little Carmageddon, should Cambridge not do the same ?
----
Feedback please, contacts, CCs to the press, Travel to work, etc
Created by Matthew Phillips // 1 thread
There is no obvious public cycle parking on Palace Green, the key tourist destination in Durham. While there is some cycle parking, it is well hidden and un-signposted. Some racks along between the trees at the Castle end of Palace Green would be ideal.
Created by Simon Hewison // 0 threads
A parade of shops that serve the local community have nowhere suitable to park bicycles, not even any useful street furniture. Having a sensible cycle rack here would encourage people to cycle to these shops rather than drive.
http://www.cambridge-news.co.uk/News/Development-plan-for-Mitchams-Corner-unveiled-28092012.htm
In summary: Staples and Lloyd’s bank are due to be demolished in this redevelopment. There's a consultation meeting next Friday from 2-7pm and on Saturday from 10am - 2pm at The Tivoli pub which is opposite.
Created by velocipedus@gmail.com // 1 thread
Jim C raised this in an email to SUSTRANS: ...if staff from the London office would find an 'Awayday' in Cambridge an interesting outing?
> Cambridge can be great in the spring, and if a trip is in term time
you can see just the sorts of diverse cycles and cyclists (diversity)
>
> I'm sure we can create a good itinerary, covering innovative
locations, tourist hotspots, and key cycle facilities.
>
> As I said at the time, why go 'Dutch' to see examples of cycle
culture, when in Cambridge you can see what can be achieved in the UK.
Created by velocipedus@gmail.com // 1 thread
International Cycling Safety Conference 2012, 7 Nov
Location: Helmond, The Netherlands
Costs: 150 Euro
Twitter hashtag: #safecycling2012
This is a segregated off road path.
The plants along the marked section of the Penistone Road cycle path restrict the width of the path considerably and make it impossible for 2 cyclists to pass each other keeping in the cycle lane and forcing cyclists to take to the pedestrian half of the path.
There are also plants overhanging the pedestrian side which make pedestrians walk along the cycle half causing conflict.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by velocipedus@gmail.com // 0 threads
Proposal for a Business Improvement District which would replace (?) "Love Cambridge". http://www.cbbid.co.uk/
Proposal is all about safety, cleanliness, city ambassadors, ultimately revenue
Beverly Carpenter from millroadsociety.org has a very spirited and serious response in the local paper
http://www.cambridge-news.co.uk/Home/Bidding-to-make-the-most-from-city-12092012.htm (does not include the "threat to diversity" argument present in the print version)
She calls it an attempt to privatise public space, privatise policing, (BID's don't honor Freedom of information requests) and turning the city centre into a shopping centre
I have seen these BIDs working in other places: ambassadors whizzing around on strange wheeled things, trying to enforce "no cycling" rules, but also a large budget which funded an annual festival.
The proposal has no language about car parking this is a topic that needs to be very closely watched from the bicycle saddle.
Created by Robin Heydon // 1 thread
What if we could create a standardised method of assessing cycling infrastructure, either proposed by developers or existing?
Northstowe used something called the "IHT Cycle Audit Guidelines" that appear to be from 1996. Perhaps something better can be done that follows a more continental approach?
Thoughts? Opinions?
Martin Lucas-Smith // 1 thread
This is a proposal for a link joining the Guided Busway cycleway and Hills Road bridge.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Several meetings, in each area committee location to discuss s106 money and how it should be spent. Details below.
http://www.cambridge.gov.uk/ccm/content/planning-and-building-control/developer-contributions.en
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by Cycling Dumfries // 1 thread
At the moment there are toucan crossings from the Whitesands up to the High Street past the lower entrance to the Loreburne Centre (where the buses stop) but there is no actual cycle path so you end up illegally on the pavement. It would be a useful route otherwise, as long as cyclists can get past the bus stops (and waiting bus passengers).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.