Bicycle parking
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by Stephan Matthiesen // 0 threads
Roundabout needs cycling and pedestrian provision, extremely difficult to turn right from Newcraighall Rd or cross from B&Q to Fort Kinnaird.
Created by Stephan Matthiesen // 1 thread
Terrifying stretch of Gilmerton Rd around Robin's Nest needs complete overhaul. Pinch points, blind corners, parking, cratered surface, and school exit, also on a hill where cycling and driving speeds vary a lot.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Stephan Matthiesen // 0 threads
A new path between Cameron March and Crawfurd Rd would be an enormous improvment as it would allow cyclists coming from Old Dalkeith Rd and Peffermill Rd to avoid Lady Rd (steep uphills, no cycle provision, much traffic) or Dalkeith Rd (steep uphills, no cycle provision, much traffic, plus parking).
This path would also connect naturally to the strange cycle path on the inside of Cameron Toll that just ends on Lady Rd. with a "cyclist dismount" sign.
Created by Stephan Matthiesen // 1 thread
Guardrails on W side of the toucan are unnecessary, restrict the footpath & lead to conflict between pedestrians and cyclists. They also block part of the dropped kerb.
Created by Stephan Matthiesen // 1 thread
No way to get a bicycle through these chicanes.
Created by Stephan Matthiesen // 0 threads
Important connection to get from Gilmerton Rd to Liberton Rd/Mayfield Rd/Kings Buildings, but road surface is badly cratered with some deep holes in blind corners.
Created by Stephan Matthiesen // 0 threads
Remove the railings at the steps, unnecessary street clutter that narrows the pavement and makes crossing Old Dalkeith Rad more difficult.
Created by Stephan Matthiesen // 0 threads
Dropped kerb needed at the end of Ravenswood Avenue, so that bicycles can get to the footpath that leads to the toucan.
Created by Stephan Matthiesen // 1 thread
The footbridge has lot of steps, even though it is a shallow ramp; apparently the designers did not expect that people with bicycles, wheelchairs, buggys or trolleys might ever want to use the bridge.
Created by Stephan Matthiesen // 0 threads
The Range supermarket has no cycle parking at all, and no railings or other things to lock a bike to. I usually lock it to a couple of shopping trolleys, but I'm sure that's not what the shop prefers.
Created by Stephan Matthiesen // 0 threads
Build a path (steps and alternative ramp) from the bus stop in Liberton Road to the Shopping Centre.
This would be an ENOURMOUS improvement for shoppers who use the bus, as currently you have to walk all the way to Gilmerton Rd and back across the car park.
The path would enable cyclists to avoid the busy and fast Lady Rd roundabout to get into the car park.
Created by Stephan Matthiesen // 0 threads
The underpass of Innocent under Milton Link is very dark (even during day); particularly unpleasant/dangerous as the path surface is badly damaged, cracked and uneven, and very often rubbish, stones or other obstacles are placed there by inconsiderate citizens.
Needs better lighting and resurfacing.
Created by Stephan Matthiesen // 0 threads
The cattle pen in the middle of York Place is too narrow and has awkward corners so that you can't even push a bike there when there are pedestrians.
Created by Stephan Matthiesen // 0 threads
It is really not clear how you get from the east end of George Street to York Place. The toucan leads you onto the pavement in the centre of St Andrews Square but then there is no sign or any hint how to get to NE corner of St Andrew Sq where the shared footpath starts again.
Created by Heather Coleman // 2 threads
I noticed a poster at the junction of Elm St and Clarendon St a few days ago. As I needed a rest this morning I stopped to read it. Apparently ONLY the residents of the Kite area (and not all of them according to the note pinned below the poster) are being consulted on the closure of Elm St, as far as I can tell, at the Elm Tree pub, to motor vehicles. Allegedly access by cyclists and pedestrians will be unaffected (although if it's some kind of rubbish narrow everyone having to give way to everyone else design, some regular users might wish to take issue with this, and suggest improvements to the design).
There is no reference to this anywhere I can find online. If I wish to reply to this consultation (and as I'm not a resident, will my views be taken into account?), I will have to go back to the poster and copy down the email address on a bit of paper. Deadline is tomorrow.
However, as a DAILY user of Clarendon St, I feel my democratic rights are being are being totally undermined. It may well be that a very large number of residents are against this proposal. Looking at it, it looks as if, for the vast number of cyclists who cycle along Clarendon St, it will probably improve safety as there may be fewer motor vehicles trying to use the Elm St crossroads which is probably the dodgiest bit of this route. Therefore regular users of Clarendon St may well wish to support this proposal.
My question is: how can they have a consultation that's secret and only open to those who actually live in an area rather than all those actually affected? As far as I am concerned this is totally undemocratic to the extreme.
If anyone is passing the area in the next couple of hours and has the technology to take a photo of the posters and start a thread on here regarding it and posting the posters so we can look at them at our leisure, it might be helpful for those of us who might like to drop a quick email in support of this plan.
Created by Stephan Matthiesen // 0 threads
Kirk Brae really needs a cycle lane uphills. There is enough space as the car lanes are fairly wide (sometimes with space wasted by hatching in the centre) but at the moment encourage dangerous overtaking.
Created by Stephan Matthiesen // 0 threads
Parked cars create narrow pinch points in front of the school, cycle lane becomes unusable so that cyclist can't pass the queuing cars.
Created by Stephan Matthiesen // 1 thread
Making the Park-Glenallan Drive connection unnecessarily awkward for trailers, wheelchair users and others.
Created by Stephan Matthiesen // 0 threads
The gate at the top of the cycle path, at Lasswade road, is very difficult to open when you're on a bicycle, and it swings into to path.
It is not clear why a gate is needed here in the first place (the whole fence is quite pointless), it could be removed.
Created by Stephan Matthiesen // 0 threads
Some kind of connection across Lasswade Rd (40mph!!), either an underpass or a toucan crossing, to connect the Burdiehouse Burn paths.
Created by Shaun McDonald // 2 threads
Suffolk County Council have put forward some plans for changes to Mulberry Corner, which Cycle Ipswich don't believe will help cycling.
Created by Stephan Matthiesen // 1 thread
There should be a walking/cycling connection between Lidl and the housing behind it (Craigmillar Castle Avenue area).
People living there are forced a long detour down to Niddrie Mains Rd then up to Lidl again. This encourages car use and discourages walking.
Niddrie Mains Rd is terrible for cycling so this connection would also benefit people cycling from Greendykes or Inch (through the park).
Created by Stephan Matthiesen // 0 threads
The fence around the car part at Inch House has no gap at the back (there is a gate to allow access to the waste bins but it's locked). This forces walkers and cyclists into a very narrow path along the wall and entrance of Inch House, too narrow to pass others and people leaving the house step right into your path.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Nicola Peck // 1 thread
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.