Ponding
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Iain Lane // 1 thread
There's a new island here, which was constructed as part of the tram works. If you look at the attached picture you can see that when it is raining there is a large puddle which makes it difficult to cycle over.
Created by Iain Lane // 1 thread
The city council received a £6.1m grant from the D2N2 LEP to construct 4 radial routes. This is the first, a mixture of a physically segregated and a shared route.
I use this route twice every day and the cycle lane is always blocked by cars parked to use the shops or hotels on this street.
It makes the cycle lane pointless as I can't use it.
This isn't quite our area, I suspect, but I'm wondering if anyone in the group knows what's happening with the once-proposed new bridge at Burwell Lode? Back in 2010, the Campaign newsletter reported that, "The National Trust anticipates being able to build this 'in the next couple of years'"; from what I can find elsewhere on the web, new ramps were built near/to the existing (horrible) bridge in 2012-13.
Not an urgent enquiry - it's just the route to Ely via Reach is one I do fairly often with friends with small children/babies in trailers, and at the moment we have to detour via Bottisham to avoid it, so I wondered if the new bridge was still on the cards at all.
Thanks,
Rachael
Richard G // 1 thread
There seems to be a number of cars parking half in the cycle lane on the new Addenbrooke's road (Dame Mary Archer Way)
Is parking in a cycle lane an offence of some sort, and would it make a difference on what I think is a private road? (I think that those roads around Addenbrooke's are not normal in terms of ownership)
Vegetation breaking through the surface of a, basically brand new, shared use path surface at Smeaton Bing.
Created by Jenny Barnes // 2 threads
If the level crossings either side of farncombe station were cycle/ ped only, with bollards in nightingale rd at the farncombe street end, and on frith hill, farncombe would be divided into 3 areas for cars, each of which would need to come out onto distributor roads. Further, if the New pond rd end of summers Rd as far as Brioadwater school were made one way southwest bound, any traffic trying to bypass the a3100/ Meadrow would be unable to.
Access Walden is a campaign group based in Saffron Walden.
Their objective is to create a safe walking and cycling link between their town centre and Audley End railway station, a journey of two miles.
Created by Bracken VanRyssen // 1 thread
The Brook Lane road badly needs cycle infrastructure and there is definitely the space available and small changes here have the potential to have a big impact on the route. Easy changes would be to resurface and open up the ends of the Brook Lane service road to allow continuous movement along it, as well as putting in a crossing for the Yardley Wood road. On the easterly section a protected bicycle lane for cyclists ascending and descending the hill could be created by moving the parking in the left lane further away from the pavement and using the resulting space (especially important for cyclists travelling up the steep hill).
Created by Roxanne (CEO) // 1 thread
The path running in front of Petersfield Mansions (identified below in red) is only 1.2m wide. This means that when passing each other pedestrians and cyclists often have to use the grass which is problematic when it is wet and muddy. It is also difficult for residents of Petersfield Mansions when exiting their properties as there is very little space for people to manoeuvre around each other.
Usage of this path has increased over the years with more cyclists using the path to access the cycle racks which have been installed on Bradmore Street as part of the expansion of Anglia Ruskin University. It is therefore proposed to widen the path by 1metre to cater for this increased usage and to improve access from Mill Road with the removal of a short section of railing and the installation of a flush kerb.
Petersfield is owned by the City Council and the path in question is maintained by the County Council as highway.
The cost of these works is approximately £20,000 and this project will be joint funded by Cambridge City Council and Anglia Ruskin University.
The path marked in blue is maintained by the City Council and we hope to improve the surface of this path at the same time if funding can be identified.
If you have any comments regarding the widening of this path or would like more information please contact cyclingconsultations @ cambridge.gov.uk by 14th September 2015.
Anon // 1 thread
KCC consultation on reduction in speed limit to 40mph
http://consultations.kent.gov.uk/consult.ti/40mphspeedlimitheadcorn/consultationHome
Consultation closes 28 Sept 2015.
Created by Dexter Johnstone // 1 thread
Weston Street is an advisory cycle route and should link up with the University of Sheffield concourse. However, it does not and you currently have to cross 3 lanes of traffic. The road is often very busy. There should be a toucan crossing instead of the pedestrian crossing, a short off road cycle path across the large grass verge could link the crossing to Weston Street.
Created by Chris Paton // 0 threads
City of Edinburgh council have done good work trialling a segregated path for NCN1 on George Street. Although the trial is coming to an end it's clear from their documents and consultations that George Street will remain the primary east-west route for cyclists travelling through the city centre and more investment is planned.
The problem is that there is very poor access to this route from the West End for any cyclists who have come along Shandwick Place or Rutland Square (including cyclists from the big offices nearby). Heading east, cyclists have to go through the busy West End road junction and then brave cars sweeping into South Charlotte Street as they turn left while simultaneously needing to find a way across two lanes of traffic to the middle of the road to turn right onto George Street -- scary stuff even for a competent cyclist.
Space is always at a premium but there do seem to be options for improving this with minimal loss of road space. A two-way cycle path could be constructed across the paving to link Hope Street with Rutland Place. With careful design this could be done to minimise impact to the pedestrian space and with reconfigured light timings cyclists could emerge from Hope Street to turn left or right, and likewise cyclists from Shandwick Place and Princes Street could turn into the new path. In addition, a left turn strip at Lothian Road onto Rutland Place would provide access to this new path for cyclists from Rutland Square and Lothian Road.
Created by Bracken VanRyssen // 1 thread
The only cycle access to the train platforms at Solihull station is an extremely small lift, otherwise your only option is carrying your bicycle up and down the stairs which can be quiet challenging. A simple solution would be a wheeling rail at the edge of the stairway to guide wheels down slowly. I see quite a few people with bicycles using the train and I myself do so on a weekly basis and two flights of stairs with a laden bicycle certainly make things tricky.
Created by WildNorthlands // 1 thread
Generally I'd say Brunswick St works well as a bike route but the gate between these two roads and the junction is poorly placed - in order to get through it you need to be on the wrong side of the road on a blind bend and it is common to find yourself coming head to head with a car coming the other way. if there were too gates for each direction, and the northbound was lined up with the cycle lane, it might help.
Created by Dominic Fee // 1 thread
Westminster City Council is undertaking a statutory consultation on the Traffic Management Orders (TMOs) needed to implement the East West Cycle Superhighway at Parliament Square. You can find a description and drawings of the proposals here:
http://westminstertransportationservices.co.uk/tmo/tmo_details.php?tt=2&id=909&cid=1
In Westminster Cycling Campaign we rarely respond to statutory TMO consultations because the proposals are either insignificant or, if they are significant, they've usually been subject to an earlier public consultation. It would be inappropriate for us to repeat points we've made previously, and we wouldn't be listened to.
Nevertheless I would encourage interested people to take a look at the Parliament Square drawings to check that the earlier design has been taken forward properly into a detailed design for construction. We have had a recent example where we did respond to a statutory TMO consultation in which the connection between part of the EWCS proposals (Savoy Street) and the rest of the highway network (a left-in left-out junction on the Strand) hadn't really been thought through. If we need to submit a response regarding Parliament Square, the deadline is 21 September 2015.
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Single storey front, side and rear extensions.
58 Willingale Road Loughton Essex IG10 2DB
Epping Forest
Application reference : EPF/1025/15
Created by Heather Coleman // 4 threads
I can't find anywhere sensible to put such things so this is a general issue for people to start specific threads pertaining to temporary closures.
Created by Donald Noble // 1 thread
A barrier has been erected when the NCN7 cycle path joins the A86, presumably to stop children from cycling onto this busy road. However, this blocks the dropped kerb at this location, and no alternative is available without cycling some distance into Kingussie on a footpath which is not marked as shared use.
The barrier also limits the entrance to the cycle track, which could make it difficult for people with trailers or alternative bikes
Phil Wigglesworth // 1 thread
They're building lots of flats off Rustat Road, which is on a major cycle route and also is the main area for freloading railway station users.
There are some issues with control of the building work, specifically:
- trucks blocking Fanshawe and Rustat Road at peak times causing dangers to cyclists
- mud on the road making the Fanshawe/ Rustat road junction dangerous
Created by Roxanne (CEO) // 1 thread
Outline application for the demolition of existing industrial and office units and 5 dwellings and the erection of up to 90 dwellings, together with associated garaging, parking, public open space, landscaping, access, highways drainage and infrastructure works. All matters reserved except access.
Created by Roxanne (CEO) // 1 thread
Demolition of Daedalus House and construction of a new 7 storey office building comprising of 9026 sqm (GEA) of office floorspace (class B1); cycle parking spaces; associated plant; hard and soft landscaping; a basement with 51 car parking spaces and 7 motorcycle bays; infrastructure works. | Daedalus House Station Road Cambridge Cambridgeshire CB1 2RE
Created by Jean Dollimore // 1 thread
Official title: "CENTRAL LONDON CYCLE GRID - PRATT ST AND DELANCEY ST PROPOSED WALKING AND CYCLING IMPROVEMENTS"
This consultation proposes the construction of an important two-way east-west cycle route across Camden Town.
It will run from St Pancras Way along Pratt Street, across Royal College Street to Camden High Street, where a two-way cycle crossing will be provided.
It will then run two-way along Delancey Street as far as Mornington Terrace.
A later consultation on the continuation of this route to Regents Park is promised.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Created by Richenda // 1 thread
Apparently TfL commissioned "...to explore the opportunity of a pedestrian river crossing ....". They may not think bikes should also be included, but they should!
http://www.telegraph.co.uk/luxury/travel/4162/a-garden-bridge-across-the-thames.html
http://www.gardenbridgetrust.org/index.html
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by TonyBeaumont // 1 thread
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
Created by HVS // 3 threads
The A5117 at this point has some sections of non-protected cycle lane, but they are not continuous, and they disappear at a number of pinch points. The road carries a lot of very fast moving heavy traffic, and is dangerous and unpleasant to cycle on. It would be a useful route for people travelling by bike to or from Stanlow Refinery, Cheshire Oaks, the University of Chester at Thornton Science Park, and Ince & Elton villages, but is currently only used by a tiny number of very brave and confident cyclists. This situation could be improved by making the cycle lane continuous along the whole route.
Created by Andrew Woodward // 0 threads
Pinch-point at zebra crossing where cyclists are forced to share space with traffic that is often speeding. Cars try to squeeze past cyclists or brake suddenly.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Frenchie // 0 threads
This is one of the prime candidate for a cycle contraflow in Newcastle City Centre. Currently one way for all traffic from Percy Street to Strawberry place. Allowing cyclists down from Strawberry Place to Percy Street would improve permeability and connectivity for cyclists. Note: not a lot of traffic, space not an issue, short uphill section so speeding not an issue.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Ned Harrison // 1 thread
Holywells Park has a section of cycle route 51 running through it, linking South East Ipswich to the centre with a pleasant and safe route down to the waterfront.
During Winter, the park is closed at dusk, sometimes as early as 4, meaning that just when the roads are most dangerous (dark and wet) cyclists are forced onto steep and busy routes either along Cliff Lane or up Bishops Hill.
The closures are largely at the request of the Park Friends group. I've spoken to them, and their concerns seem to be largely about what might go on after dark. It's not clear that there is any evidence for this, nor that the current situation of locking the main gates but leaving others would do anything to deter misbehaviour.
Keeping it open as a cycle route would ensure a legitimate presence in the park, and help provide less confident cyclists in the area with a safe route to and from town.
I'd propose either locking later, or for a trial period leaving the park unlocked.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.