Adam and Eve rat-running
A proposal has been put forward to add bollarded access in this cut-through from Adam and Eve Street through to Burleigh Street, to avoid rat-running in the area.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 1 thread
A proposal has been put forward to add bollarded access in this cut-through from Adam and Eve Street through to Burleigh Street, to avoid rat-running in the area.
Martin Lucas-Smith // 1 thread
The Newtown area (basically between the Botanic Gardens and Lensfield Road on the inner ring road) is a mass of one-way streets, rat-running vehicles, children being dropped off to the schools rather than cycling, and so on.
We should take the opportunity to work with locals to improve the area.
Created by Bracken VanRyssen // 0 threads
The humpback bridge over the stream at this point is highly unsuitable for a well trafficked bicycle route, the design with extremely steep access from both directions as well as areas of mud make the bridge quite a pain to cross. This is especially problematic for bicycles with small wheels or heavy loads, that may struggle with entry and exit of the bridge. An ideal solution would be a longer bridge with gentler slopes to minimise damage to bicycle wheels and smooth out the transition. No doubt this bridge also causes problems for less-able people and represents a significant barrier which is enough of a reason in itself to undertake improvements.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Martin Lucas-Smith // 1 thread
15/0398/FUL | Erection of student accommodation with 321 student rooms (following demolition of existing buildings), together with ancilliary accommodation comprising common/study rooms, porters lodge, laundry room, plant room, bin and bike enclosures, landscaping and associated infrastructure including a sub-station. | 8, 10 And 10A Cheddars Lane And 351-355 Newmarket Road Cambridge Cambridgeshire CB5 8LD
Usual issues to check out:
- Cycle parking (number, type and positioning)
- Access, in particular need for improvements to Newmarket Road
Created by Colin Wing // 7 threads
This is part of a proposed cycle superhighway from the Finchley Road into Central London.
It will become more attractive after the modification of the Swiss Cottage gyratory system in Camden.
See the discussion threads for details on the sections in Westminster, Camden and Swiss Cottage
Created by Bracken VanRyssen // 0 threads
The cycle path alongside the University of Birmingham campus seems to be a magnet for broken glass, especially in the area opposite the petrol station and Oakfield Road. Avoiding all the broken glass is quite a trial especially for those with less robust tires. Regular sweeping would go a long way towards improving the quality of the route.
The path that runs across the width of Cassiobury Park from Stratford Way to Cassiobury Park Avenue has not been resurfaced since I've been in Watford (13 years). Very poor condition especially in the vicinity of the j/w what seems to be known (on Google Maps) as Central Avenue.
The problem is more than its surface - the path is far too narrow, esp in view of the high use it gets from cyclists and pedestrians.
Created by Kevin Ablitt // 1 thread
It is a constant problem that car drivers think it is acceptable to park in this particular spot.
The single yellow needs upgrading to double yellow lines ( is this enforced anyway ) OR we need hard infrastruture design which prevents such selfish behaviour.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.
The surface of the cycle path, which is also National Cycle Route 1 through Bourne Park is of an extremely poor quality. This really needs to have a smooth tarmac surface, and potentially widened.
I would expect kids to be learning to ride a bike along here, however that's not currently possible as its' touch going for an adult to cycle here never mind a child who is just learning to cycle. If this path is upgraded it would be even better if the surfacing was extended to create a circle around the park which is reasonably smooth, so that people can learn to cycle by cycling around this park.
Created by Donald Noble // 1 thread
A trench has been dug across the cycle path close to the substation, and has not been properly reinstated, leaving a 0.5m wide 5cm deep rut right across the tarmac path,
This should have been reinstated properly at the time, but would be good if it could be fixed soon
Created by Bracken VanRyssen // 1 thread
The pavement and marked cycle path is in pretty bad shape due to root damage and weathering and could really do with some resurfacing. As well as this the numerous side roads and the narrow pavement sections beyond the bus stop create numerous conflict points.
Created by Bracken VanRyssen // 0 threads
Cycle infrastructure is disjointed and confusing, there is no clear and consistent level of infrastructure along the Stratford route. What little infrastructure there is, is mostly made up of narrow shared-use pavements. Unless you approach Shirley High Street from the west (through the park), safe access to the shopping district by bicycle is limited.
Created by Monica Frisch // 2 threads
The site used by Ridgeons (builders' merchants) on Cromwell Road in Cambridge has been identified by Cambridge City Council as a potential location for new housing in the future. As a part of this, Ridgeons and their team of consultants, along with Cambridge City Council, are working to develop a document called the Ridgeons Cromwell Road Development and Planning Brief (Supplementary Planning Document, SPD). This will provide guidance on access, land use, building types, open space and character for all future planning applications on the site.
Created by Stephan Matthiesen // 0 threads
The hill from the Braidburn Inn across Liberton Road up Kirk Brae is very difficult (steep and much traffic).
Cyclists should be allowed to use the pavement from opposite the Braidburn Inn (at the end of the cycle lane), then cross Liberton Rd at the pedestrian lights (to be converted into toucan) and then continue on the pavement up Kirk Brae, at least to the Fire Station.
Dropped kerbs are needed:
- at the end of the cycle lane in Mayfield Road
- at the end of Mayfield Rd, before the lights
- at the bottom of Kirk Brae
- at Double Hedges Row
Many cyclists already use the pavement in this way, but lack of dropped kerbs makes it difficult (and of course it would be better if it's made legal).
Created by Simon Nuttall // 2 threads
The Speedwatch scheme allows the public to get actively involved in monitoring the speed of vehicles travelling through their neighbourhood. It is used in areas where speeding has been identified as a priority at quarterly neighbourhood panel meetings. The scheme is run by the force alongside the Cambridgeshire and Peterborough Road Safety Partnership. It is about educating motorists in the law in relation to speeding and monitoring any trends in speeding in neighbourhoods.
Volunteers are trained to use speed indicator devices which displays vehicle speed. The registered owner of any vehicle seen exceeding the speed limit is sent an advisory letter from their local neighbourhood policing team, explaining that speeding is unacceptable to the local community.
Created by Stephan Matthiesen // 2 threads
Have a new shared path on the Est side of Inch Park, connecting Glenallan Drive, Old Dalkeith Road and Cameron Toll.
This would be a very useful connection that allows cyclists (and pedestrians) to avoid parts of busy Old Dalkeith Road.
There is no real reason why a proper path can't be built there; dog walkers walk along the suggested route all the time (on the grass).
Created by Stephan Matthiesen // 2 threads
There is a strange muddy puddle where the path from Burdiehouse Burn meets the footpath along Burdiehouse Rd., and the right-angle corner is very narrow anyway.
The paths should be connected in a more gentle curve - there is a desire line on top of the wall in the left half of the image.
This is an important point as the footpath does not continue along Burdiehouse Rd northwards, so all cyclists and pedestrians have to walk through the puddle.
From email:
Nottingham City Council (Amesbury Circus Area, Aspley, Nottingham) (Prohibitions of Waiting and Entrance Clearway) Traffic Regulation Order 2015 (TMP 7109)
Please find attached a consultation letter and associated Drawings, Numbers TM/TMP7109 which relates to the above areas, Amesbury Circus Area, Aspley , Nottingham - Traffic Regulation Order (TMP 7109). If you have any concerns in relation to the TRO proposals can you please let me have your comments by 31st March 2015.
Created by Stephan Matthiesen // 3 threads
Create a cycle path on the pavement or make it shared use, from after the bus stop in Liberton Road around the corner to the junction Gordon Terrace/Esslemont Rd.
This would allow cyclists who want to turn left from Liberton Rd towards KB to bypass the traffic lights, then continue onto Gordon terrace or rejoin the other traffic in Esslemont Rd.
Currently it's dangerous because:
(1) this route is uphills and cyclists are going slow, but cars turning left can't see ahead if there are cyclists.
(2) cyclists have to wait at the light and then are in front of cars, so drivers get quite annoyed having to trundle along until safe overtaking is possible in Esslemont Rd, many attempt dangerous overtakes earlier. If cyclists can bypass the red lights they have a chance to go up the difficult bit during quieter phases
(3) cyclists who are not in the ASL (but also those in the ASL) are in danger of being left-hooked (see also http://edinburgh.cyclescape.org/issues/1532-segregate-the-feeder-lane)
Created by Rosie Downes // 11 threads
TfL are consulting on plans for the East-West cycle superhighway in Hyde Park and St James's Park. The proposals can be seen at https://consultations.tfl.gov.uk/cycling/eastwest?cid=cycle-east-west
The LCC office has set up this thread to facilitate discussion in advance of submitting its response to the consultation. The consultation closes on 29th March.
To ensure that your comments will be taken into account when composing LCC’s response please make sure that your registered identity on Cyclescape includes your full name and whether you are a member of LCC and any local LCC group. (You can add these details by clicking on your name at the top of the page and then the Edit Profile tab.)
Ongoing work on the development of the North West Cambridge site results in cycle paths being blocked at random intervals, and inappropriate pedestrian-oriented alternative provision makes the situation more, not less, dangerous for cyclists, forcing us into a narrow roadway with fast-moving traffic. With the increase in heavy traffic, road surface is also deteriorating rapidly - increasing numbers of large potholes, which can easily lead to pinch flats and other mechanical failures on dangerous, narrow sections where lack of cycle path of pedestrian walkway means here is no escape route.
Created by Stephan Matthiesen // 1 thread
Dropped kerb needed at the end of this footpath.
Created by TonyBeaumont // 1 thread
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Area Estates are proposing to build a retail park on the former Smiths Industries site between Winchester Road and Harrow Way, in Basingstoke. This was formerly owned by Tesco, who failed to build a supermarket there.
No cycling access has been proposed, and the provision for cycle parking is inadequate - insufficient for customers, and none for staff.
Please submit feedback to the developer.
No planning application yet, but previous applications for the site are here: https://planning.basingstoke.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=H44MKACRLI568
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Eric Booth // 1 thread
Friend of mine uses a wheelchair & hand cycle and is blocked this gate on his way home. Would be great if we could get it opened for him. [Jack Small]
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by Nicola Peck // 1 thread
This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.
This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.
Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.
The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.
In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Need to check this planning application for access issues. It proposes to make a new car entrance through a high wall across a pavement at the end of Chesterton Road.
The cycleway cut-through here is very poor currently.
Anon // 1 thread
The main HWRC depot which is out of bounds unless you turn up in a car offers a wide range of recycling opportunities. The pedestrian/cycle area directly of Hazel Court offers none of this other than the main recycling types that are available through household waste collections, and tin foil.
Its hardly acceptable to think that just because you're arriving by bike/foot you won't be able bring other items. All that happens is things either get wrongly sorted or left on the floor causing the area to become a state.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.