Abdon Avenue - Bristol Road Link
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
This road has been left with a hopelessly outmoded junction geometry, with huge radii and a simply breathtaking width. It's so bad that it's not unknown for oncoming vehicles to pass "continental style", because a perfectly reasonable path turning right into the close will take you way over to the right of anyone making a right turn out of the close (note there are no white lines to provide road positioning guidance). This would in fact make a great cycling link from Cob Lane into the park. There is ample room to create a cycle path and a crossing with a central refuge, and make the junction safer and less bizarre for motorists. Instead the city council has elected to take cyclists on an unlit shared path the same width as a bike, across an informal crossing upon which cyclists are instructed to dismount, and along a footpath.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
This path has been built recently as part of the Merritts Brook Greenway walking and cycling route. It would be quite useful were it not narrow, twisty, and covered in loose chippings. As it is, it is all but useless for cycling, so it needs to be rebuilt properly.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Jean Dollimore // 2 threads
N-S Cycle Superhighway consultation
------------------------------------------------------
TfL proposed that the N-S Cycle Superhighway should stop at Greville Street but LCC's response to the consultation stated that the route should continue on Farringdon Road to at least the junction with Calthorpe and Margery Street (under discussion here).
After the consultation TfL replied that they would explore options north of Stonecutter Street(which is actually south of Greville Street!). The N-S Cycle Superhighway may be completed by Spring 2016 but we have no date for it being extended any further north.
Link to our discussion on CycleScape
http://camdencyclists.cyclescape.org/issues/1407-the-tfl-north-south-cycle-superhighway-consultation
=========
Junction Kings Cross Road/Farringdon Road/Calthorpe Street/Margery Street
---------
See consultation on TfL's website at:
https://consultations.tfl.gov.uk/cycling/kings-cross-road
which has a link to their junction plan
Plan to build September 2015
-----------
TfL's proposals include the following:
On Farringdon Road - Grays Inn Road
- right turn pocket for northbound cyclists turning into Margery Street
-1.5 m advisory cycle lane on Kings Cross Road for cyclists travelling southbound with one instead of two motor lanes and on northbound carriageway north of the junction
- footway build outs
Calthorpe Street
- longer ASL and low-level early release signals
- footway build out
Margery Street
- widen contraflow
- longer ASL box and low-level early release signals
Immediate issues:
- no space for cycling on Farringdon Road south of the junction
- northbound approach on Farringdon Road left hook issue
- no attempt to provide protection for cyclists crossing the junction; Farringdon Road is wide enough to put in the infrastructure needed for a separate signal stage for northbound cyclists or for "hold the left turn".
- the early release signals are only as effective as a longer ASl box, not protecting cycles that arrive during the green stage.
Dates: consultation 20 February 2015; reply due 6 April 2015.
Created by Dawes Jaguar // 0 threads
The layout here makes crossing from Victoria Common to St Joseph's Avenue awkward on this proposed cycle route: http://www.pushbikes.org.uk/location/northfield-3. It would benefit from some minor attention.
Created by Dawes Jaguar // 0 threads
This footpath needs to be improved and made shared use for this proposed cycle route segment: http://www.pushbikes.org.uk/location/northfield-3
Created by Dawes Jaguar // 0 threads
This short section of scruffy footpath completes this proposed cycle route segment http://www.pushbikes.org.uk/location/bournville-1 and links it with the Merritts Brook Greenway. Since the path is in such a poor state I would suggest updating it to create a cycle path and footpath, the two being made flush with the existing carriageway.
Created by Dawes Jaguar // 0 threads
This puffin crossing is a barrier to creating a cycle route: http://www.pushbikes.org.uk/location/bournville-1. I've attached a photo, because despite it being a random Google Street View shot it shows there is a demand for cycling.
Created by Dawes Jaguar // 0 threads
The footpaths on the Davids Estate provide permeability for pedestrians, but not cyclists, yet one of them would allow the creation of a quiet route for cyclists: http://www.pushbikes.org.uk/location/bournville-1 (the other just links that route with The Davids). Making the paths shared use to lift a barrier to cycling.
Created by Donald Noble // 0 threads
It would be good to have a dropped kerb near here to allow southeast-bound cyclists who have used the road/bus lane to rejoin the cycle path without having to go onto the A90 slip road to rejoin at Crammond Brig
Created by Dawes Jaguar // 0 threads
Cycling is banned on Victoria Common, but it represents the sort of environment in which people love to cycle. In the short term the paths should be made shared use, but longer term it would be sensible to create cycle paths through the park.
Created by Dawes Jaguar // 0 threads
If this path was made shared use, cyclists could use it to connect the official cycle route on Heath Road South with Northfield town centre via Chatham Road and Rochester Road (there is a toucan crossing that takes cyclists across Church Road).
Created by Dawes Jaguar // 0 threads
Maas Road used to be two way, and was a quiet road upon which cyclists could bypass the motorised traffic that has been allowed to totally dominate Northfield High Street. Then it was turned into a two-lane, one-way rat run, and became a barrier to cycling. It should be restored to two-way for cycling.
Created by Stephan Matthiesen // 1 thread
The entrance is very decorative but has a really narrow corner, so it is difficult to negotiate by bicycle when you've been shopping, and impossible for trailers. There is a desire line (mudpath) next to it, this could be converted to a proper path.
Created by Stephan Matthiesen // 0 threads
The footpath has a very bad surface, and should also be a little bit wider.
Created by Stephan Matthiesen // 1 thread
A walking/cycling connection between Summertrees court and Gilmerton Rd would make the route to the bus stops, to St John Vianney and generally between the two halves of the Inch much shorter, encouraging walking.
Created by Stephan Matthiesen // 0 threads
This path is often quite muddy. It is gravel and resurfaced every year or so.
But it's a very busy walking and cycling connection between Inch and Craigmillar, and the gravel just doesn't last very long.
Not sure what to do. It would be a shame to convert it to tarmac, but perhaps there is some surfacing option that lasts a bit longer.
Created by Stephan Matthiesen // 0 threads
Make dropped kerb where the footpath from Ravenswood Avenue meets the Old Dalkeith Rd. This would make it possible for cyclists on Old Dalkeith Rd to dismount here and walk over to Ravenswood Av.
Created by Dawes Jaguar // 0 threads
A bi-directional cycle path here would link Langleys Road (a quiet road that leads down into Bournville Village and beyond) with Katie Road (another quiet road that links with the BCR route on the Worcester and Birmingham canal). Cyclists would cross Oak Tree Lane using what is currently a puffin crossing (suitably modified to promote sustainable transport). There is a huge amount of space here, currently largely used for pavement car parking.
Created by Stephan Matthiesen // 0 threads
Add a dropped kerb at the bottom of Kirk Brae so that people on bike can dismount easier and push if they don't feel like struggling up the hill.
Created by Stephan Matthiesen // 0 threads
Dropped kerb at the end of the cycle lane southbound, so that people on bikes can get off and push.
At rush hour it is usually impossible to merge into and keep up with the motor traffic uphills, many cyclists dismount here and walk to the pedestrian crossing.
Created by Stephan Matthiesen // 1 thread
Often a lot of parking on the grass, in laybys etc., especially during sports event, but also other days.
There is a small parking area in front of the Sports Centre, mainly disabled bays, and a large car park in front of Inch House.
The council has over time added more and more grasscrete areas on the eastern part of the road for about 12 cars, I've been told they were not in the original planning permission.
The provision of parking attracted more and more drivers into the park as there is now an expectation that one can park close to the sports centre, this has become the norm rather than the exception (for people with disabilities, deliveries etc).
Needed are
- bollards along the road to protect the grass
- clear signage
- reduce the parking spaces within the park to the minimum to discourage drivers.
Created by Stephan Matthiesen // 0 threads
Remove the steps and the guardrails to make a connection for bicycles (and buggys and wheelchairs).
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Shaun McDonald // 1 thread
Dove Street is currently one way. It would be useful if it could be made 2 way for cycling for peopl coming from St Helen's Primary School to NCN 1.
The left turn from St Helens Street into Dove Street is much easier than a right turn from St Helens Street into Regent Street, as you don't have to block a lane of traffic and hope for a gap in the traffic in the opposite direction, especially with kids. It's also a shorter route when heading towards the town centre.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Cycling Dumfries // 1 thread
No safe route from Collin to Dumfries town centre - the A75 is a dual carriageway along this stretch of road with no direct alternative route
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Andrew Woodward // 0 threads
The route from Kingston Bridge into Church Road and up to Bushy Park traverses busy traffic routes with little protection for people cycling. Making this short section easier and safer for cycling would provide an important link to join up the quiet routes from Hampton through Bushy Park to Kingston town centre.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”