Quietway 2 (Cycleway 27) in Westminster
This is an east-west cycle route between Bayswater and Fitzrovia.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Colin Wing // 7 threads
This is an east-west cycle route between Bayswater and Fitzrovia.
Created by Colin Wing // 4 threads
This is the route of Quietway 19 in Westminster. Only this section is scheduled for completion by 2016. The remaining section through Mayfair is scheduled for a later phase.
Nominal deadline set to clear this from the Consultation Map.
Created by Colin Wing // 4 threads
This is the route of the Circle Line South Quietway in Westminster. Only this section is scheduled for completion by 2016.
Created by Colin Wing // 2 threads
This is one of the options for Cycle Superhighway 5 in Westminster.
Created by Colin Wing // 2 threads
This is the proposed route of Quietway 16 in Westminster
Nominal deadline set to clear this from the Consultation Map.
Created by Colin Wing // 4 threads
This is the proposed route of the Grand Union Quietway. It actually follows the Regent's Canal.
Created by Colin Wing // 4 threads
This is the proposed route of Quietway 68 in Westminster.
Created by Hester Wells // 1 thread
There are proposals to build a permanent ice rink on land owned by Marshalls within the Park and Ride site. Various community groups are currently being consulted at an early stage about the plans.
Cycling issues include cycle parking, construction and delivery lorry danger, and connectivity for cycling.
The site in on NCN 51.
Created by Angela Hobsbaum // 1 thread
Camden Council are consulting on proposals to improve road safety around the newly-rebuilt Netley Primary Schools, Stanhope Street NW1 3EX.
Full details can be found here:
https://consultations.wearecamden.org/culture-environment/public-realm-improvements-netley-primary-school-de/consult_view
Deadline Friday 12 December.
I will collate comments and write a response from Camden Cyclists on Wed. 10th December.
Created by David Butler // 3 threads
Manchester City Council's proposed Prstwich Cycleway, a route from Heaton Park to Hulme Hall Lane, with the southern section following NCN Route 60.
Created by David Butler // 1 thread
Manchester City proposed route from Altrincham Road to the airport, funded by CCAG. Most of this route exists already; the proposals upgrade sections and creates new links to form continuous route.
Created by Colin Rosenstiel // 1 thread
A planning application (14/1818/FUL) proposes to replace the road blockers with gates. The design has such a large gate it has to open to the left of the opening as seen from Manor St (see http://goo.gl/maps/j7Lfm), requiring 3 of the 5 cycle parking hoops (obscured by the trees and not in use in the photo) to be moved to the right of the entrance. They serve shops on King St and visitors to the Malcolm Place flats so moving them would take them significantly further from the needs they serve.
I am drafting an email to the planning department to include criticism of the gate design from my point of view as a local resident. I am also soliciting Campaign support on the cycle parking issue. I'll post a draft shortly.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Tom McKeown // 1 thread
Drivers ignoring the marked priority at Magdalene pinch point is a regular occurrence when faced with city bound riders. At times this can be very dangerous. Especially when large numbers of riders are forced into a very small gap between the vehicle and the bollards. I should imagine the situation is especially unpleasant travelling with small children. Also difficult to resolve with a wider cargo cycle, trailer or trike.
Created by Al Storer // 1 thread
Motor vehicles frequently fail to give priority to cyclists leading to conflict
Created by Philip Shore // 2 threads
With very limited maintenance on cyclepaths, should the local community:
- volunteer time and effort to increase maintainance eg cutting back hedgerows?
- if desired, how could volunteer effort be arranged?
Created by Jean Dollimore // 1 thread
This issue is about our priorities for two way cycling in a pair of one way streets, the first north and the second south of the canal at Camden Lock:
- Hawley Road runs one way eastbound between Chalk farm Road and Kentish Town road.
- Hawley Crescent runs one way westbound from Kentish Town Road to Camden High Street
Both of these roads are on our list of permeability issues but we are being asked to say which we would like to see tackled first.
Created by Richard Jennings // 2 threads
There are a variety of issues with construction lorries in this busy location, closure of the footway outside the hotel, narrowing of the route from Regents Street to Parker's Piece and traffic signal changes. The construction is expected to take two years.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Created by Oscar Hughes // 2 threads
Large numbers of cyclists and pedestrians access Cambridge station from Devonshire Road and from the pedestrian and cycle bridge through the car park. This is unsafe, unpleasant and dangerous. How could we develop alternatives? A better route along Station Road and Tenison Road? Direct access to the station from the east doesn't really seem feasible.
Created by Oscar Hughes // 1 thread
This unpleasant underpass is heavily criticised in the 2016 vision.
http://www.camcycle.org.uk/vision2016/junctions.html#elizabethway
Created by Andrea // 1 thread
Remove left-turn priority filter: if you want to cycle to the station from Stoke Park Drive, you currently get a lot of stress from drivers honking at you from behind
Created by Andrea // 1 thread
more cycle parking spaces for all times of the day needed
Cargo bike parking needed
Current two-tier parking for cycles are not female-friendly as upper tier too heavy to lift
Created by Jean Dollimore // 1 thread
Leather Lane has a well established market that trades on the street throughout the week
To stop vehicles using Leather Lane when the market is on, Camden proposes to close access to Leather Lane and other roads leading directly to Leather Lane with some consequent changes in parking provision.
Camden Council's proposals can be seen at:
They include the following:
Option A
- close Leather Lane
- close Hatton Wall, between Leather Lane and Hatton Garden
- close St Cross Street, between Leather Lane and Hatton Garden
- close Portpool Lane and Baldwin’s Gardens where they meet Leather Lane
Option B
- same as Option A but keeps St Cross Street open
Comments:
The proposal consistently refers to stopping "vehicles" using Leather Lane. It should refer to "motor vehicles" so that cycles still have access.
Reply due 5 December 2014.
Please add your comments by 1st December
Created by Andrea // 0 threads
a hotspot for delivery vans and cars parking on cycle lanes. We need enforcement to curb this
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.