Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first:

  • Pinch points

    Created by FrenchyF // 1 thread

    The southbound cycle lane disappears at the pinch points caused by traffic islands. The cycle lanes should get wider through the pinch point. East Lothian Council has done this (on Linkfield Road in Musselburgh, for example), and Edinburgh really needs to follow suit.

    Please sign in to vote.
  • Old Dalkeith Road bike lane

    Created by FrenchyF // 1 thread

    Just south of Little France Road, the southbound bike lane on Old Dalkeith Road is appalling. It's alongside a parking bay, but the parking bay isn't wide enough for cars to fit into it without them sticking into the bike lane. Even if it was, "dooring" would still be a significant hazard.

    Even away from the parking bay, the bike lane is too narrow.

    The bike lane really needs to be wider and further away from parked cars. If this isn't possible, I think it would be better to have no cycle lane at all.

    Please sign in to vote.
  • Old Dalkeith Road/Ferniehill junction

    Created by FrenchyF // 1 thread

    The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.

    Please sign in to vote.
  • Protected Cycleway on northern section of Leeds Ring Road

    Created by M Stanley // 1 thread

    Leeds City Council are applying for investment to put a protected cycle way on the northern section of Leeds ring road.

    Draft plans are available here:

    A: https://www.dropbox.com/s/c2borky0obwf9yt/TM-00-2936-02-02A.pdf?dl=0

    B: https://www.dropbox.com/s/agapwxnnxjveffk/TM-00-2936-02-02C.pdf?dl=0

    C: https://www.dropbox.com/s/sxk9g6nezr4cnhh/TM-00-2936-02-03B.pdf?dl=0

    We have provided a letter of support which can be found here:

    https://www.dropbox.com/s/mcxpirrr5qrnxab/2017-06-30%20Letter%20of%20support%20for%20NPIF%20bid%20.pdf?dl=0

    Council are expecting to hear about success of bid in early autumn

    Please sign in to vote.
  • 17/1008/FUL Darwin Green resubmission

    Created by Matthew // 1 thread

    17/1008/FUL | Resubmitted application (previously approved under application reference 14/0063/FUL) for the construction of vehicular road link across the north-west green corridor of consented development 07/0003/OUT to provide access to the proposed secondary school parcel of land within South Cambridgeshire District Council. (Resubmitted due to the expiration of three years from the date of the previous permission). | Land Adjoining Whitehouse Lane, Part Of The Darwin Green One Land Between Huntingdon Road And Histon Road Cambridge

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=OR6PWVDXKPN00

    Please sign in to vote.
  • Narrow chicanes need removal

    Created by Stephan Matthiesen // 1 thread

    The path between Hyvot Loan and Guardwell Glen has two narrow chicanes at both ends, which are quite overgrown too.

    This path is important as it allows people to leave the quiet route northwards towards Ellens Glen, so you can avoid parts of the busy Gilmerton Rd.

    I contacted the Active Travel team about it and they are going to look at it. There is some uncertainty if this is owned by the Morrison supermarket or the council. The chicanes were put in after local complaints about motorbike, so the Active Travel team has to investigate if this is still a concern.

    Please sign in to vote.
  • Balfour Street Streetscape Improvement

    Created by Luce // 1 thread

    Main cycling concerns:

    Installation of contraflow lane (and removal of parking where said lane is to be - currently contraflow is allowed, with no formal lane);
    Reduction of parking;
    Tightening up of jct. with Rodney Rd - as well as most of Balfour St. (reducing reckless driving);
    Additional cycle parking at corner of Victory Pl.

    Issues:

    Current shared contraflow 'bypass' at corner of John Maurice Cl. and Balfour St. seems to be gone, this meant cyclists didn't have to go head-on with oncoming traffic;
    Width for safe contraflow (this is also a bit of an issue due to parking; however Balfour St. is not very busy, so I have never had any conflicts myself)

    Overview

    Southwark Council has plans to enhance the appearance and improve accessibility along Balfour Street between Rodney Road and Munton Road, and its junction with Rodney Road.

    Due to the ongoing regeneration of the local area, we would like to enhance the appearance of Balfour Street and its junction with Rodney Road by widening the footway to improve access for all users, creating a safer environment for cyclists, upgrading the public realm and increasing tree provisions, and improving safety for all road users at the Rodney Road junction.

    Please sign in to vote.
  • Unsurfaced Path

    Created by Rob Earl // 0 threads

    Useful shortcut to Halfords/etc without having to cross Seafield Road twice. Could be used year round if surfaced properly.

    Please sign in to vote.
  • Dropped Kerb/DYL on NEPN Access

    Created by Rob Earl // 0 threads

    Better access to NEPN than through St Mark's Park which involves an uphill, narrowing road approaching a blind bridge. Requires stopping in traffic to negotiate parked cars and kerb.

    Please sign in to vote.
  • Tower Hamlets Local Infrastructure Fund consultation

    Created by Alex Jenkins // 1 thread

    The council is consulting on the Local Infrastructure Fund (LIF) to give local people a say in defining the infrastructure priorities for their areas.

    The consultation period will run for six weeks from 27 June 2017 to 8 August 2017.

    Tower Hamlets has grown rapidly in recent years, and a number of new housing and employment developments have been built across the borough. Additional growth is expected in the future and the council recognises that this can put pressure on local services and infrastructure - that is, on areas like transport, schools, healthcare facilities and parks/open spaces.

    To deal with the impacts, developers are required to pay a financial contribution called the Community Infrastructure Levy (CIL). The borough has apportioned to each LIF Area, 25 per cent of the money from which the income was generated. Please refer to the LIF Area Profile documents for the specific amounts collected so far for each LIF Area. The council must then use this money to support the development of the local area, by addressing the demands that development places on the area, and by making sure the right infrastructure and services are in place for residents.

    In addition to understanding local people’s infrastructure priorities, the council is engaging with local people and giving them an opportunity to nominate projects that they would like to see delivered in their neighborhood. These can be new or existing projects already identified by the council in the LIF Area Profiles. Prior to the allocation of funding to any project and in line with the regulations, you will need to clearly demonstrate how the project will deliver the provision, improvement, replacement, operation and/or maintenance of infrastructure or anything else that is concerned with addressing the demands that development places on an area.

    This consultation provides local people with an opportunity to nominate up to three (new or existing) projects. Prior to the allocation of the funding to any project and in line with the regulations it will need to be clearly demonstrated how the project will deliver the provision, improvement, replacement, operation or maintenance of infrastructure or provides anything else that is concerned with addressing the demands that development places on an area.

    Please sign in to vote.
  • Waterloo roundabout

    We want your views on proposals to help inform our LCC response.

    TfL says:

    Overview:
    We want your views on our proposals to create a better Waterloo. We’ve developed these proposals over the past 10 years by working with local stakeholders and the community. The original vision can be found here. Our proposals aim to create a healthier and safer environment for people to walk and cycle and use public transport as well as support the regeneration and growth of Waterloo. These proposals aim to improve the quality of life in the area by:
    Reducing the dominance of traffic, allowing people to better enjoy the area
    Creating a healthier and safer environment
    Planting more trees to replace the removal of trees which will have the potential to benefit biodiversity, landscaping and wildlife
    Creating a sense of place with the proposed new public square
    Creating a focal point for Waterloo, helping build on it as a cultural destination and support the regeneration and growth of Waterloo
    Keeping buses and traffic moving through the area.
    The proposals form part of the Mayor of London’s plan for Healthy Streets - a long-term vision to encourage more Londoners to walk and cycle and use public transport by making London’s streets healthier, safer and more welcoming.

    What we are proposing

    Our proposals would:
    Create a new tree-filled public square supporting civic and cultural life of the area by moving the existing bus stops from Tenison Way to an improved bus station on Waterloo Road, closing the south-west arm of the roundabout and changing the remaining carriageway to two-way traffic
    Introduce segregated cycle lanes making cycling around Waterloo roundabout safer
    Create new pedestrian routes and permanently remove some subways (but keep others) to help create more direct walking routes towards the river Thames. The subways can be unpleasant and divisive, inaccessible to large sections of the community
    Widen the footways on Waterloo Road to give more space to pedestrians and waiting bus passengers by narrowing the carriageway through removing a section of bus lane
    Relocate northbound and southbound bus stops to keep traffic moving on Waterloo Road
    Ban the right turns from Waterloo Road into Stamford Street and from Concert Hall Approach (except for buses) to keep traffic moving.

    Why We Are Consulting

    Encourage more walking and cycling and use of buses by
    Making it easier, safer and more pleasant
    Keeping buses and traffic moving through the area
    Provide a sense of place and improve the environment by
    Creating a new, high-quality, traffic-free, green public space to become a focal point for Waterloo supporting the civic and cultural life of the area
    Support the regeneration and growth of Waterloo
    Currently the area is overcrowded and difficult to navigate for pedestrians, bus passengers and cyclists. This is exacerbated by street clutter and level differences that make it confusing and harder for people to get to where they want to go.
    It will get even busier because of major planned developments, including increasing capacity at Waterloo station. The roundabout is dominated by motor traffic and can be intimidating and unpleasant to walk and cycle.
    By giving cyclists more space and time to pass through the area more easily, and by providing new signalised crossings, a new public space and wider footways for pedestrians and waiting bus passengers, we can encourage more people to use these healthy and sustainable forms of transport, whilst keeping other traffic moving.
    Waterloo is a very important transport hub with Europe’s busiest rail station, a strategic bus interchange, and large numbers of cyclists and some key cycle routes passing through it.
    It is also home to international visitor and cultural attractions, workplaces, residents and academic institutions.
    Our proposals are designed to improve safety for vulnerable road users by introducing dedicated facilities, such as signalised pedestrian crossings, new cycle lanes and separate cycle signals. Waterloo roundabout is one of 33 locations across London we are prioritising as part of our Safer Junctions programme.
    Overall, these proposals are designed to make it easier, safer and more attractive to walk, cycle and use public transport in the area, and to prepare for and stimulate further growth and regeneration.

    Potential effects of our proposals

    Journey times
    We expect the proposals would result in changes, both positive and negative, to journey times for motorists, bus passengers and cyclists once complete. Click here for the information (PDF) that explains the impacts we expect our proposals to have on journey times and is accompanied by a more detailed table of data.

    Walking
    We want to make walking more convenient and attractive. There are a number of places where overcrowding is common such as Tenison Way and Waterloo Road:
    The proposed new public space would provide lots more room for pedestrians and create a key focal point in the local area with crossings relocated to where people want to cross
    Wider and clearer footways would reduce overcrowding on Waterloo Road
    Walking routes would be opened up, improving way finding and permeability.

    Cycling
    Taken from survey data in 2013 cyclists make-up 40% of traffic around Waterloo roundabout in the AM peak.
    We want to make cycling in Waterloo easier, safer and more attractive. Our proposals provide dedicated time and space for cyclists and aim to reduce road casualties by addressing the patterns of past collisions:
    Segregated cycle lanes around the new peninsula. The impact of this is balanced with bus and general traffic movements by making some strutural changes to the roundabout
    Separate cycle signals on traffic lights would reduce the number of conflicts with general traffic
    Existing cycle parking stands would be relocated
    The cycle hire docking station outside Kings College would be relocated
    We are working with other teams delivering projects that would provide better and safer connections to existing and planned cycle routes.

    Bus passengers
    Waterloo is a strategic part of the London bus network, with some of its busiest routes serving the area, used by 20,000 passengers a day. Our proposals aim to encourage more people onto buses and keep all traffic moving:
    An improved bus station and new public square would provide a much improved interchange and waiting environment for bus passengers
    Wider footways on Waterloo Road would provide a larger and safer area for waiting bus passengers and accommodate future growth in numbers
    Bus stops would be relocated from Tenison Way to the improved bus station on Waterloo Road and the northbound and southbound bus stops on Waterloo Road would be consolidated.
    A short section of bus lane on Waterloo Road would be removed to keep traffic moving.

    General traffic
    We want to reduce the dominance of traffic around Waterloo by creating an environment which encourages people to walk, cycle or use public transport. As a result:
    There would be some changes to general traffic journey times as a result of these proposals. We would remove the south-western side of the roundabout to create the new public space. Traffic would flow two-way around the new peninsula
    The section of northbound bus lane on Waterloo Road from the junction with The Cut would be removed to provide more space for pedestrians. Buses would share the general traffic lane and pull-in to the relocated bus stops allowing traffic to pass
    The right turn from Waterloo Road into Stamford Street and the right turn from Concert Hall Approach (except for buses) would be banned to keep traffic moving through the area.
    We do not develop proposals to introduce traffic restrictions without carefully considering the potential impacts and exploring alternative solutions. The restrictions are proposed to either address a safety issue, or help the signalised junction operate more efficiently and minimise potential journey time delays to road users.

    Deliveries and servicing
    Some changes to existing servicing arrangements may be required. If your home or workplace is on or near the proposed changes, please let us know if the proposals could affect your deliveries, collections and servicing. We would encourage you to discuss the proposals with companies undertaking these operations.

    Taxis
    The main taxi rank is on Station Approach and is not affected by these proposals.

    Rail and London Underground users
    Network Rail has a programme of works to increase capacity at Waterloo Station and London Underground has plans to increase Bakerloo and Northern Line services, increasing the numbers of people using Waterloo to interchange. Our proposals would make it easier and more attractive for passengers to continue their journeys on foot, cycle or bus.

    Environment
    Air pollution is one of the most significant challenges facing London, affecting the health of all Londoners. As part of the plans for new measures to tackle London’s current poor air quality, we have been consulting on proposals to bring forward the introduction of the London Ultra Low Emission Zone (ULEZ).
    A number of other schemes to improve London’s air quality are planned, including taking steps to reduce air pollution from our bus fleet, reducing emissions from taxis and private hire vehicles, setting up five ‘Low Emission Neighbourhoods’ and expanding the electric vehicle charging network, as well as making it simpler to use. We are investing to make London’s streets healthy, safe and attractive places to walk and cycle. Enabling more journeys to be made on foot or by bike can help reduce private vehicle use and associated emissions. Click here for more information on how we are creating Healthy Streets and click here for the draft Mayor's Transport Strategy. Our proposals aim to improve the quality of life in the area by:

    Reducing the dominance of traffic, allowing people to better enjoy the area
    Exploring opportunities to achieve more greening
    Creating a sense of place with the proposed new public square and providing additional seating.
    As our proposals for Waterloo would change how traffic moves around the area, we expect there would be some associated and localised changes to air quality and noise levels. We will be carrying-out environmental surveys and environmental modelling to help our design development.

    Security barriers on Waterloo Bridge
    The Metropolitan Police Service has installed barriers to increase security on London’s busiest bridges. Our proposals will aim to ensure that the security of all road users is maintained in the future.

    Working with the local community
    TfL has been working with Lambeth Council and engaging with businesses, local stakeholders and the Mayor to develop these proposals over the years. These are the planning documents and guidance consulted on with the local community that have helped us develop these proposals:
    A local college, Morley College, has produced a photo record to capture the sense of place and character of the area that these proposals will build on. These photos will be on show at the public events and around Waterloo.
    There is a public art poem by the poet Sue Hubbard called “Eurydice” on the wall of one the subways we propose to remove. The poem was written as part of the renovation of the South Bank especially for the underpass that leads from Victory Arch at Waterloo Station to the BFI IMAX cinema. We will work with local stakeholders to investigate how we can include the poem in the new public space.

    Next steps
    Subject to the outcome of this consultation, should we proceed with these proposals, we would look to start construction in late 2019 for a period of up to 18 months.
    We are aware that there is a lot of construction occurring in the Waterloo area and these changes are likely to cause further disruption. We would work with the local community, Lambeth Council, SBEG, WeAreWaterloo and surrounding developers to coordinate works and deliveries to minimise this impact as far as possible.

    Previous consultations
    As part of the Mayor’s Better Junctions Review we made improvements at the roundabout to reduce accidents by providing more priority and road space for cyclists, particularly at the junctions with Stamford Street and Waterloo Road.
    Later the speed limit was reduced to 20mph and will be retained under these proposals.

    Please sign in to vote.
  • Lambeth Bridge North & South

    TfL says:

    Overview:
    We have developed proposals to transform the road layout at the northern and southern roundabouts at Lambeth Bridge to create a safer environment for cycling and walking. We would also make changes to some approach roads and to the bridge itself.
    Focussing on road safety, our proposals are designed to keep traffic moving along these key routes, whilst providing a better balance to the way that space on the road is allocated.
    Our proposals would require changes to the way general traffic moves through the area, including new left or right turn traffic restrictions on some roads at each end of the bridge.

    What are we proposing?
    We propose to convert both the northern and the southern roundabouts of Lambeth Bridge into crossroad junctions, with traffic signals and signalised pedestrian crossings. At each junction, dedicated space would be given for cyclists and new pedestrian areas would be created.
    To support these transformational plans, changes to the road layout are also proposed on Lambeth Bridge itself, at the Millbank north junction with Great Peter Street and along Lambeth Palace Road. These layout changes include two general traffic lanes at each exit from the bridge, the introduction of a signalised pedestrian crossing at the Millbank north junction with Great Peter Street, and the extension of the southbound bus lane on Lambeth Palace Road.
    We have also developed public realm improvements, sensitive to the heritage of the area. These designs propose to further enhance the look and feel of the area so that we can promote a real sense of place to Lambeth Bridge and its surrounds.
    The Metropolitan Police Service has installed barriers to increase security on London’s busiest bridges. Our proposals will aim to ensure that the security of all road users is maintained in the future.

    We are also seeking views on:
    Longer-term plans for the pedestrian underpass at Albert Embankment
    A potential new location for the palm tree at Lambeth Bridge north
    The current traffic speed at Lambeth Bridge north and south

    Why are we proposing it?

    Safety
    Our proposals are designed to improve safety at both northern and southern roundabouts by introducing dedicated facilities for vulnerable road users, such as signalised pedestrian crossings, new cycle lanes and separate cycle signals. The northern roundabout in particular has a high proportion of collisions involving cyclists, and is one of 33 locations across London we are prioritising as part of our Safer Junctions programme.

    Healthy Streets to encourage walking and cycling
    The proposals form part of the Mayor of London’s long-term vision to encourage more Londoners to walk and cycle by making London’s streets healthier, safer and more welcoming. Both roundabouts and Lambeth Bridge are currently dominated by motor traffic and can be intimidating and unpleasant places to walk and cycle. By giving cyclists space and time to pass through the junction more easily, and by providing new signalised crossings and clearer footways for pedestrians, we can encourage more people to use these healthy and sustainable forms of transport, whilst keeping other traffic moving.

    Building a local cycle network
    Lambeth Bridge and its roundabouts lie on busy cycle commuter routes. Making the area safer and more welcoming for cyclists would help build connections to existing infrastructure, such as Cycle Superhighway Route 8 on Millbank, and planned improvements, such as Westminster Bridge and Central London Grid routes. The following map shows how our proposals would build on cycling connectivity in the area.

    The impacts of our proposals

    Journey times
    Our proposals have been designed to not have a disproportionate impact on other road users. However we expect there would be changes, both positive and negative, to journey times for motorists, bus passengers and cyclists.
    More detailed information on the traffic impacts of the Lambeth Bridge proposals, including tables of the likely journey time impacts, can be found here https://consultations.tfl.gov.uk/roads/lambeth-bridge/user_uploads/traffic-impacts-and-data-table.pdf
    Should these proposals go ahead, we would take a number of steps to ensure that the changes made along the route are balanced. We are investing in advanced traffic signal technology to allow us to better manage traffic depending on differing conditions at any given time.

    Turning restrictions
    Our proposals include a number of restrictions to turning movements:

    ‘Straight-ahead only’ for traffic exiting Millbank north
    A time-of-day banned right-turn from Millbank south onto Lambeth Bridge during the evening peak
    A banned left-turn for northbound traffic from Millbank south into Horseferry Road
    ‘Straight-ahead only’ for traffic exiting Horseferry Road
    A banned left-turn from Lambeth Palace Road onto Lambeth Road.
    A banned right-turn from Lambeth Road onto Lambeth Palace Road.
    We do not develop proposals to introduce traffic restrictions without carefully considering the potential impacts and exploring alternative solutions. The restrictions are proposed either to address a safety issue or to help the signalised junction operate more efficiently, minimising potential journey time delays to road users.

    The environment

    Air and noise
    Although the designs for Lambeth Bridge north and south are not expected to increase the number of motor vehicles in the area, our proposals may change how traffic moves around some roads, which may result in some associated and localised changes to air quality and noise levels. Environmental surveys and modelling would take place as part of our ongoing evaluation of these proposals.

    Tree removal
    Our proposals require the removal or relocation of a number of trees in order to accommodate the new road layout:
    The iconic phoenix palm tree at the centre of the roundabout on the northern side of Lambeth Bridge would look to be relocated
    Seven trees at the centre of the roundabout on the southern side of Lambeth Bridge would need to be removed
    One tree at the junction of Millbank and Great Peter Street would need to be removed
    New trees will be planted at Lambeth Bridge north and south as part of proposed urban realm improvements. Subject to the outcome of consultation, tree species would be determined during detailed design.

    Visual environment
    Our proposed urban realm improvements aim to improve the look and feel of the area, as shown in our artists’ impressions.

    Features include:
    Reducing the dominance of traffic, allowing pedestrians and cyclists to better enjoy the area
    Increasing the surface area of the public realm by approximately 1,370 square metres at Lambeth Bridge north and approximately 1,790 square metres at Lambeth Bridge south
    Attracting more visitors to the area and local attractions such as Victoria Tower Gardens
    Planting new trees bringing overall benefits for the area’s biodiversity and landscape
    Providing new seating
    New footway materials to improve the look of the streets along Albert Embankment, Lambeth Palace Road, Millbank and Lambeth Bridge
    The removal of unnecessary and duplicate poles, signs and other street furniture
    Upgrades where necessary to existing lighting and drainage
    Provision of more cycle parking
    An opportunity to provide additional Cycle Hire stations
    Upgraded wayfinding for example to Newport Street Gallery
    Equalities
    In considering the design of our streets, we closely consider the needs of all users throughout the design process. On significant infrastructure projects, we:

    Complete Equality Impact Assessments (EqIA), to review potential impacts on equality target groups, including disabled people
    Carry out public consultations, including targeted engagement with specific users such as (amongst many others): Royal National Institute of Blind People, Guide Dogs for the Blind, Age Concern, Transport for All, and the National Autistic Society
    Ensure we comply with established guidance – such as the Design Manual for Roads and Bridges – which includes detailed requirements for disabled people
    The EqIA for Lambeth Bridge north and south will continue to be developed following the outcome of this public consultation, incorporating feedback received.

    Other options considered but not taken forward
    We considered a number of alternative designs before taking forward our current proposals.
    At Lambeth Bridge south, we considered retaining the roundabout, but this provided minimal benefits for cyclists. We also considered ‘hold the left’ turn facilities on Lambeth Road and Lambeth Bridge, which separate cyclists from other traffic with separate traffic signals. However this scenario would have caused significant traffic queueing due to the extra signal phase required and was difficult to accommodate due to the structure of the bridge.
    We also considered a number of designs at Lambeth Bridge north including a signalised junction and a ‘Dutch style’ roundabout with a physically separated cycle track around the edge of the roundabout. However, our modelling indicated that this would have had significant impact on journey times for other road users in the area, including thousands of bus passengers.
    Having considered a number of designs, we believe the current proposals would achieve the best balance for all road users.

    Related schemes
    Lambeth north interim scheme
    During March 2017, we delivered interim safety improvements at Lambeth Bridge northern roundabout.
    The changes were timed to bring improvements whilst we continued with plans to re-work the junction's layout for the long-term.

    Next steps
    Subject to the outcome of this consultation, should we proceed with these proposals, we would look to start construction in late 2018.
    Although construction would cause some disruption, we would take steps to minimise this as far as possible.
    Building in late 2018 would allow us to coordinate with major planned maintenance work on Lambeth Bridge, and with work currently taking place at Westminster Bridge South.

    Please sign in to vote.
  • S/2141/17/OL: Outline planning permission 160 dwellings. Cambridge Rd, Melbourn

    Created by Roxanne (CEO) // 1 thread

    Outline planning permission for the erection of up to 160 residential dwellings, including affordable housing provision, public open space and associated access, infrastructure and landscaping. All matters reserved except for access.

    Land to the west of Cambridge Road, Melbourn, Cambs

    http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/2141/17/OL

    South Cambridgeshire

    Application reference : S/2141/17/OL

    Please sign in to vote.
  • Cycle lane situated in dooring zone

    Created by TMiles // 1 thread

    The south-west-bound cycle lane between the roundabout with Headley Way and the second side road mostly runs directly adjacent to parked vehicles, putting cyclists in danger of being seriously injured by an opening door.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top