Bicycle parking
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by Stephan Matthiesen // 0 threads
Roundabout needs cycling and pedestrian provision, extremely difficult to turn right from Newcraighall Rd or cross from B&Q to Fort Kinnaird.
Created by Stephan Matthiesen // 1 thread
Terrifying stretch of Gilmerton Rd around Robin's Nest needs complete overhaul. Pinch points, blind corners, parking, cratered surface, and school exit, also on a hill where cycling and driving speeds vary a lot.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Stephan Matthiesen // 0 threads
A new path between Cameron March and Crawfurd Rd would be an enormous improvment as it would allow cyclists coming from Old Dalkeith Rd and Peffermill Rd to avoid Lady Rd (steep uphills, no cycle provision, much traffic) or Dalkeith Rd (steep uphills, no cycle provision, much traffic, plus parking).
This path would also connect naturally to the strange cycle path on the inside of Cameron Toll that just ends on Lady Rd. with a "cyclist dismount" sign.
Created by Stephan Matthiesen // 1 thread
Guardrails on W side of the toucan are unnecessary, restrict the footpath & lead to conflict between pedestrians and cyclists. They also block part of the dropped kerb.
Created by Stephan Matthiesen // 1 thread
No way to get a bicycle through these chicanes.
Created by Stephan Matthiesen // 0 threads
Important connection to get from Gilmerton Rd to Liberton Rd/Mayfield Rd/Kings Buildings, but road surface is badly cratered with some deep holes in blind corners.
Created by Stephan Matthiesen // 0 threads
Remove the railings at the steps, unnecessary street clutter that narrows the pavement and makes crossing Old Dalkeith Rad more difficult.
Created by Stephan Matthiesen // 0 threads
Dropped kerb needed at the end of Ravenswood Avenue, so that bicycles can get to the footpath that leads to the toucan.
Created by Stephan Matthiesen // 1 thread
The footbridge has lot of steps, even though it is a shallow ramp; apparently the designers did not expect that people with bicycles, wheelchairs, buggys or trolleys might ever want to use the bridge.
Created by Stephan Matthiesen // 0 threads
The Range supermarket has no cycle parking at all, and no railings or other things to lock a bike to. I usually lock it to a couple of shopping trolleys, but I'm sure that's not what the shop prefers.
Created by Stephan Matthiesen // 0 threads
Build a path (steps and alternative ramp) from the bus stop in Liberton Road to the Shopping Centre.
This would be an ENOURMOUS improvement for shoppers who use the bus, as currently you have to walk all the way to Gilmerton Rd and back across the car park.
The path would enable cyclists to avoid the busy and fast Lady Rd roundabout to get into the car park.
Created by Stephan Matthiesen // 0 threads
The underpass of Innocent under Milton Link is very dark (even during day); particularly unpleasant/dangerous as the path surface is badly damaged, cracked and uneven, and very often rubbish, stones or other obstacles are placed there by inconsiderate citizens.
Needs better lighting and resurfacing.
Created by Stephan Matthiesen // 0 threads
The cattle pen in the middle of York Place is too narrow and has awkward corners so that you can't even push a bike there when there are pedestrians.
Created by Stephan Matthiesen // 0 threads
It is really not clear how you get from the east end of George Street to York Place. The toucan leads you onto the pavement in the centre of St Andrews Square but then there is no sign or any hint how to get to NE corner of St Andrew Sq where the shared footpath starts again.
Created by Heather Coleman // 2 threads
I noticed a poster at the junction of Elm St and Clarendon St a few days ago. As I needed a rest this morning I stopped to read it. Apparently ONLY the residents of the Kite area (and not all of them according to the note pinned below the poster) are being consulted on the closure of Elm St, as far as I can tell, at the Elm Tree pub, to motor vehicles. Allegedly access by cyclists and pedestrians will be unaffected (although if it's some kind of rubbish narrow everyone having to give way to everyone else design, some regular users might wish to take issue with this, and suggest improvements to the design).
There is no reference to this anywhere I can find online. If I wish to reply to this consultation (and as I'm not a resident, will my views be taken into account?), I will have to go back to the poster and copy down the email address on a bit of paper. Deadline is tomorrow.
However, as a DAILY user of Clarendon St, I feel my democratic rights are being are being totally undermined. It may well be that a very large number of residents are against this proposal. Looking at it, it looks as if, for the vast number of cyclists who cycle along Clarendon St, it will probably improve safety as there may be fewer motor vehicles trying to use the Elm St crossroads which is probably the dodgiest bit of this route. Therefore regular users of Clarendon St may well wish to support this proposal.
My question is: how can they have a consultation that's secret and only open to those who actually live in an area rather than all those actually affected? As far as I am concerned this is totally undemocratic to the extreme.
If anyone is passing the area in the next couple of hours and has the technology to take a photo of the posters and start a thread on here regarding it and posting the posters so we can look at them at our leisure, it might be helpful for those of us who might like to drop a quick email in support of this plan.
Created by Stephan Matthiesen // 0 threads
Kirk Brae really needs a cycle lane uphills. There is enough space as the car lanes are fairly wide (sometimes with space wasted by hatching in the centre) but at the moment encourage dangerous overtaking.
Created by Stephan Matthiesen // 0 threads
Parked cars create narrow pinch points in front of the school, cycle lane becomes unusable so that cyclist can't pass the queuing cars.
Created by Stephan Matthiesen // 1 thread
Making the Park-Glenallan Drive connection unnecessarily awkward for trailers, wheelchair users and others.
Created by Stephan Matthiesen // 0 threads
The gate at the top of the cycle path, at Lasswade road, is very difficult to open when you're on a bicycle, and it swings into to path.
It is not clear why a gate is needed here in the first place (the whole fence is quite pointless), it could be removed.
Created by Stephan Matthiesen // 0 threads
Some kind of connection across Lasswade Rd (40mph!!), either an underpass or a toucan crossing, to connect the Burdiehouse Burn paths.
Created by Shaun McDonald // 2 threads
Suffolk County Council have put forward some plans for changes to Mulberry Corner, which Cycle Ipswich don't believe will help cycling.
Created by Stephan Matthiesen // 1 thread
There should be a walking/cycling connection between Lidl and the housing behind it (Craigmillar Castle Avenue area).
People living there are forced a long detour down to Niddrie Mains Rd then up to Lidl again. This encourages car use and discourages walking.
Niddrie Mains Rd is terrible for cycling so this connection would also benefit people cycling from Greendykes or Inch (through the park).
Created by Stephan Matthiesen // 0 threads
The fence around the car part at Inch House has no gap at the back (there is a gate to allow access to the waste bins but it's locked). This forces walkers and cyclists into a very narrow path along the wall and entrance of Inch House, too narrow to pass others and people leaving the house step right into your path.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by Martin A // 1 thread
This attractive former railway line would provide a useful off-road link between Ripley Greenway and Derby for commuters and leisure users.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.