The vineyard - one way street
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Andrew Woodward // 0 threads
There is short one way stretch here - this would be easy to make 2 way for cyclists and is key to creating a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road.
Created by Andrew Woodward // 0 threads
This roads is a one way street that feed into Clifford Ave just south of Chalkers Corner. Clifford Avenue is a nightmare for cyclists and there isn’t an obvious remediation because its not very wide and its the South Circular road. Opening up Kingsway to 2-way cycling would enable cyclists travelling north up Clifford Ave who want to travel east/west on the A316 cycle track to get off Clifford Ave as quickly as possible and avoid the queue up to Chalkers corner. It would also give residents of Kingsway a legal cycle route that does NOT force them into Clifford Ave.
Created by Andrew Woodward // 0 threads
This roads is a one way street that feed into Clifford Ave just south of Chalkers Corner. Clifford Avenue is a nightmare for cyclists and there isn’t an obvious remediation because its not very wide and its the South Circular road. Opening up Somerton Ave to 2-way cycling would enable cyclists travelling north up Clifford Ave who want to travel east/west on the A316 cycle track to get off Clifford Ave as quickly as possible and avoid the queue up to Chalkers corner.
Created by velocipedus@gmail.com // 1 thread
University Technical College (UTC) Cambridge is to be launched at the Long Road 6th From site.
The UTC will open in new build facilities in September 2014 and will deliver a technical education to 670 students aged 14 to 19
It is a collaboration of Cambridge University Health Partners, Cambridge Regional College, Babraham Institute, Napp Pharmaceuticals, Medical Research Council, Wellcome Trust Sanger Institute, Long Road Sixth Form College, Parkside Federation Academies, Cambridge Cleantech, Cambridgeshire County Council, East of England NHS, Anglian Water, The Cube, AmeyCespa
Public Exhibition 11 April 2013
4pm to 8pm
Long Road Sixth Form College
Cambridge Regional College in association with Long Road Sixth Form College, their industry partners and Cambridge University Health Partners are developing designs for an exciting new University Technical College on the Long Road Sixth Form College site.
Project Manager is Laurence Wells
c/o Cambridge Regional College
Kings Hedges Road
Cambridge
CB4 2QT
Tel 01223 418502
Created by Sam Saunders // 1 thread
The barrier where Malago Greenway joins Cotswold Road/Windmill Hill is unreasonably restrictive - not just to tricycles, cargo and trailer bikes but also to baby buggies and mobility aids. The low hoop presents an unnecessary hazard to anyone with less than good eyesight.
Created by christhebull // 1 thread
Alright folks, if we're going to get the whole "Freeways and Greenways" network off the ground than we need to make sure we know what the existing routes are like (as some of us know certain parts of the city better than others). Here is my take on this section of the Frome Greenway:
1) The route is fairly direct and a lot flatter than the road through Stapleton past Colston's School, it is also free of motor traffic
2) Part of the route twists and turns *right next to* a lake and is shared by dog walkers. Whilst I recognise that this is meant to be a relatively leisurely route through a park, we don't want anybody taking an unexpected swim. The path also floods after heavy rainfall.
3) The lakeside stretch is particularly hazardous at light. To cut down on energy costs, movement activated lights could be installed on an ideally re-aligned path.
4) The route loses cohesiveness near the M32 junction. Improvements to the path and to signage are needed to direct cyclists to the Stapleton Road shared use section.
5) One of the bridges is exceptionally narrow (haven't measured, but can't be more than 1 metre) and is only fit for single track use
6) At the gated access off Wickham Glen, there is a passage to the side which is filled with loose gravel which gives poor traction on cycles as well as an open drainage channel which is a trip hazard on foot and bike
Overall the route already has strong potential to form a quality part of the greenway network, but these issues should be addressed as part of the overall network creation.
Created by Sam Saunders // 1 thread
New lights and crossings have been installed and pedestrians have recently been given a much safer way to cross Berkeley Place from west to east. The build-out near the end of Procathedral Lane has narrowed the roadway and made the pedestrian crossing time much shorter than it was. The two traffic lanes heading north east out of Berkeley Place are each now reduced to about 2.9 metres wide, leaving very little, or no space for a vehicle to pass a cyclist or for a cyclist to approach the ASL when traffic is stationary. The upward incline can make this even more awkward for a cyclist who needs to stop and then restart from a position behind or alongside vehicles south west of the build-out.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Monica Frisch // 8 threads
This is an administrative issue to help Cambridge Cycling Campaign keep track of the briefing papers it is producing
Created by Heather Coleman // 1 thread
I'm just working out that it seems hard to start a thread without an issue, and something that doesn't have a specific location (actually, I think having to provide a location for something when not appropriate counts as a bug).
Last Thursday (so Maundy Thursday so the day before the double Bank Holiday weekend), there were people on Riverside between the new Riverside Bridge and the path up to Tesco, doing a traffic survey. I can't think of a less appropriate day to do one (maybe Christmas Eve which is also not a Bank Holiday but might as well be), unless the aim was "to show no-one really commutes along Riverside, and no school children travel along there". As far as I can tell, every state school was having a teacher training day even though their holidays were supposed to start on the Friday, all the private schools were off, there are no students around, and no rowers, and even lots of normal workers were presumably taking a day's holiday judging from how full my place of employment and the general traffic levels everywhere during "rush" hour. The location of this survey is irrelevant, as the data generated, wherever it was, will be irrelevant unless the question was "how little traffic is there on a day when all the schools are closed and lots of people have taken the day off work?".
Is there any logic to when traffic surveys are done? Since they generate data that the Council use to decide on road maintenance, gritting etc, it's important that these data are meaningful.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Created by velocipedus@gmail.com // 6 threads
Travel for Work Partnership http://www.tfw.org.uk/ brings together Chambers of Commerce, Cambridge City Council, Huntingdonshire District Council, East Cambridgeshire County Council, NHS Cambridgeshire, University of Cambridge, Council for the Protection of Rural England, South Cambridgeshire District Council, Cambridge University Hospitals NHS Trust, Cambridgeshire County Council, Cambridge Cycling Campaign.
Within this issue there is place for threads relating to single (major) employers, particular benefits or services, issues, the governance of TfW, the role of public health, parking allocation, best practice elsewhere etc
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by KristianGregory // 1 thread
This is the Mitcham Road cycling blackspot. Part of the LCN, but features a cycle lane in the door zone of parked cars, high speed traffic, many pinch points and a history of incidents including the death of a cyclist.
Martin Lucas-Smith // 1 thread
The entrance to Parker's Piece has been blocked at various points over the last year by thoughtless location of a street-trading van.
Trading in this location should be permitted only further along the path so that conflict between cycles and pedestrians in an already-confined space is reduced.
Created by Simon Nuttall // 1 thread
I've had a report that one of the council's quad bikes has mistakenly sprayed diesel fuel on the section of cycleway between the Jane Coston Bridge along the side of Cowley Road down as far as junction near Milton Road.
These needs checking, but if true will be a news story tomorrow and quite an environmental problem.
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Henry Lancashire // 1 thread
Info from survey:
"The London Borough of Brent and Sustrans are working together to explore ways in which the Kilburn High Road and surrounding area shown could be improved. Together we want to better meet the needs of the community to make it a more desireable place to walk, cycle and enjoy being in.
...
London Borough of Brent and London Borough of Camden will submit a joint application to Transport for London's Liveable Neighbourhood programme in November 2018, which will incorporate suggestions made by the community."
Brent Cyclists are forming our own response, to be sent by end of October 2018.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Created by Roxanne (CEO) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Thomas Lancaster // 0 threads
Coming off the Scholars Greenway out of Farnham Park, cyclists currently have to detour along Park Row and the heavily trafficked Castle Street and The Borough to get to The Woolmead, East Street development and South Street to the Station. Bear Lane is wide enough to accept a contraflow to The Woolmead. The Woolmead is currently one way but designated for 2-way traffic as part of the East Street (Brightwells) development.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.