Queens St/Princes St loop Consultation
The formal consultation has now been set to run from Tuesday 25th February to Saturday 1st March.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Shaun McDonald // 3 threads
The formal consultation has now been set to run from Tuesday 25th February to Saturday 1st March.
Created by David Earl // 1 thread
Outline application for up to 69 residential dwellings including houses and apartments, open space, landscaping and new access. | Field At Corner Of Coldhams Lane And Hatherdene Close Cambridge Cambridgeshire
New junction onto Coldhams Lane proposed, which includes a central island, the gap on the westbound side is 3.1m, about the worst possible for cyclists.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Created by Peter Lawrence // 2 threads
Please sign my change.org petition http://chn.ge/1epSzpK
Accident CC-23012014-0561 (Incident logged by the Cambridgeshire Police)
Leaving Zoology Department 18.15 walking east on Downing St, north side on 23 January, 2014. Car stopped in Downing st just west of Corn exchange road junction, obscuring the light. Lying on the road was a road sign warning cars of road works further left in Corn Exchange St, a needless warning. This 1 metre road sign had been placed on the pavement, occluding it seriously and had been, presumably, knocked over and left lying on the pavement with its black and invisible legs raised up about 10cm from the surface and its reflective surface tilted away (see picture). I tripped over the road sign in the dark and fell forwards injuring my face and forehead; the metal cut into my right leg. My glasses are destroyed, the leg of the sign tore my shoes.
I was taken to Addenbrookes and treated there. I left there ca 20.30 with head injuries and abrasions and now have an impressive black eye and surround.
I am seeking redress. I am exploring legal action against the County Council whose idiotic health and safety rules (for drivers, not for the rest of us) say that drivers should be warned in advance of even highly visible roadworks (in a 20mph area) and the company responsible for placing such a flimsy and dangerous sign right in the middle of a narrow pavement. Also am anxious that in general people who leave road traffic signs occluding the pavement or creating dangerous obstacles there, should be held responsible and penalised. I see these road signs often as I walk around Cambridge, they should be on or above the road, not blocking the pavement in my opinion.
The next day the same road sign, with my blood still on it, was back in the middle of pavement waiting to be knocked over again and even now forcing pedestrians to avoid it by diverting on to the roadway. I attach a photo of it taken on Friday the day following my accident with a diverted pedestrian on the right.
It was again fallen on the ground waiting to kill someone on Saturday night, presumably following the afternoon storms.
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Charlie Halliday // 1 thread
Proposed off-road cycle path following the A323, Norris Hill Road, to link Fleet with the existing cycle-path from Norris Bridge towards the centre of Farnborough.
It would enable cyclists to avoid Norris Hill Road, an unlit road with speed limit of 60 mph. Once built it would be possible to cycle from Fleet to Farnborough without cycling on roads.
This is in the Fleet Town Access Plan ref. PC9
Created by Jean Dollimore // 1 thread
The image above is an extract from the map published by TfL on 18th Dec 2013; showing the GRID routes in Camden with some of the names of the roads added. We should reply to the documents at:
http://www.tfl.gov.uk/roadusers/cycling/29172.aspx
Deadline 14th February 2014
Created by TMiles // 0 threads
The route marked between Headingley and Armley is heavily used as an intra-urban connector between north west and south west Leeds. Congestion can be particularly acute because it uses one of the few crossing points over the River Aire and the Leeds and Liverpool canal in the west of the city.
The addition of cycle lanes in both directions along the length of this route has the potential to encourage a modal shift from cars and make a real impact on congestion. These cycle lanes would help to establish a more comprehensive network outside the radial routes, and would be a useful on-road addition to the Leeds Core Cycle Network (forming itinerary Ar - W). The proposed route offers connections to the improved cycle facilities on Kirkstall Road (A65) and the future CityConnect facilities.
The addition of cycle lanes would be of particular benefit to uphill cyclists, minimizing their conflict with motorists.
In addition to the environmental, economic and health benefits, the project would improve car-free mobility between three very different communities in Leeds: Headingley, Hyde Park and Armley.
The width of the pavements along the northern sector would allow for a widened carriageway in order to accommodate the cycle lanes. The loss of pavement width would be outweighed by the benefits of calmed traffic. The carriageway of the southern sector is already generous and would make the implantation of cycle lanes relatively straight forward.
Created by Shaun McDonald // 2 threads
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Norwich Road, Vallet Road, and Chevallier Street. This is a major route for people travelling north in and out of the city.
Created by Shaun McDonald // 1 thread
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Felixstowe Road, Nacton Road and Bishops Hill. It's a cross roads with one significant use arm at a 30 degree angle
Created by Shaun McDonald // 1 thread
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Woodbridge Road and Argyle Street. It is a t-junction of which 2 arms are one way and part of the gyratory.
Created by Richard Moss // 1 thread
An umbrella issue for discussion of general matters relating to reviewing planning applications in the city and south cambs.
Created by Hester Wells // 5 threads
The County Council is planning to redesign Tenison Road.
East Parade forms part of the one-way Leeds city centre loop. On the stretch shown it is three-lanes wide, a layout that encourages cases of excessive speed.
The addition of a wide hybrid or segregated cycle lane would improve cycle journeys from the railway station and the south of the city towards the Universities, hospital and north of the city.
Towards the junction with the Headrow the segregated system will end to allow cycles and vehicles to correctly position themselves to turn left or go straight ahead. In this final section the road surface should read, from left to right: (1) cycle lane, turning left (2) standard vehicle lane, turning left (3) cycle lane, straight ahead (4) standard vehicle lane, straight ahead (5 - if space permits) standard vehicle lane, straight ahead. Nevertheless, the layout should allow cycles continuing straight across to adopt their position without conflict from left-turning vehicles. An example of such markings can be seen in Cambridge (Hills Road railway bridge, inbound) or in Nantes (http://www.flickr.com/photos/cyclable/9526360512/).
Provision for delivery vehicles should also be considered here, as the left hand lane is frequently occupied by vans or lorries under the current system. To avoid conflict with cyclists, it would be most sensible to site such parking to the right of a segregated cycle lane.
The project would bring additional traffic-calming benefits, with the reduction of the road width to two lanes along much of its length.
Created by TMiles // 0 threads
The width of the road after the traffic lights lures south-west bound cycles into a left position that becomes problematic because of the build-out at the later pedestrian crossing. They either have to stop to let traffic pass through this pinch point or take the risk of readjusting their path to the right in order to join the main stream of vehicles.
One solution would be to guide cycles into the correct position with cycle lane markings from the traffic lights to the pedestrian crossing.
The second solution would be to cut a cycle-lane across the build-out, including a mini pedestrian crossing that cyclists would have to respect. This short stretch of lane should be flush with the road surface and must be kept swept regularly in order to be effective.
Created by Shaun McDonald // 1 thread
The cycle lane on NCN1 on Stoke Park Drive are rather narrow, thus you cannot cycle within the cycle lane. Having the cycle lane there means drivers often don't give as much space when overtaking. There are also many traffic island pinch point which make it extremely dangerous, as drivers overtake and cut in just before the island.
Created by MJR // 1 thread
"The adopted Core Strategy designated South East King’s Lynn (this area) as one of the strategic ‘urban expansion’ areas around King’s Lynn. The independent planning inspector who examined the Core Strategy explicitly stated that, compared to the potential alternatives, the expansion areas identified (including South East King’s Lynn) were preferable to the alternatives in meeting the Borough’s need for substantial numbers of additional dwellings over the plan period. It is relatively unconstrained by flood risk and infrastructure problems, etc., and relatively easily accessed and serviced.
5.2.4 Policy CS09 of the Core Strategy, ‘Housing Distribution’, provides for an allocation here of at least 1600 new homes, with supporting infrastructure. It also identifies this as establishing a direction for future growth beyond the plan period (i.e. beyond 2026). From the sites put forward during the consultation, informed by the work of the Prince’s Foundation for the Built Environment in connection with the Neighbourhood Plan (see below) a total of 3,000 to 3,500 additional dwellings could be accommodated in the fullness of time. This is indicated diagrammatically in figure 7 of the Core Strategy.
5.2.5 This is likely to be the largest residential development opportunity in the Borough for many years. It provides a once-in-a-generation opportunity to form a thriving and vibrant new community immediately south of King’s Lynn. The intention is to integrate a large number of new homes and associated facilities with an existing village community, generate a range of major improvements in a range of areas, and shape a place that promotes a sense of community among its residents, existing and new." (From the Borough Council KLWN, "Preferred Options for a Detailed Policies and Sites Plan", October 2013)
Created by Kevin Ablitt // 0 threads
The west bound ( out of town ) on-road cycle lane is extremely narrow. As are the motor vehicle lanes to accomodate eastbound bus lane. There is plenty of space on verges etc to improve this facility but may mean moving lampposts etc.
Created by Kevin Ablitt // 1 thread
Very narrow carriageway and very narrow footpath on one side only ( I have seen a woman struck on the shoulder by a bus mirror on this route).
High number of pedestrians and cyclists at peak times, poor visibility and abrupt hill make this a very dangerous route.
Created by Kevin Ablitt // 0 threads
Very narrow and winding. This section of Stone Lodge Lane should be considered for reduced access, one way, filetered permeability or complete closure to motor vehicles.
http://www.ipswichstar.co.uk/news/ipswich_child_injured_after_collision_on_stone_lodge_lane_1_3211524
This isnt the first such incident.
Created by Matthew Phillips // 2 threads
The Mount Oswald development received outline planning permission a while ago. A full application has already gone in for the first phase, at the southern end of the site. It appears connections will be provided for cyclists and pedestrians to the A167 (car access is from South Road). The greater concern is whether an opportunity is being missed to create a new off-road route parallel to South Road.
The picture is taken from the Design and Access Statement of the planning application for the first phase. The big unknown is the middle area, where the large self-build houses will be. No plot divisions are shown on the plan. Will there be public access north-south through this area?
South Road is not shown as a strategic cycle route in the County Durham Plan. The Mill Hill Lane route and the A167 are accorded the status of primary routes, but there is not even a secondary route along the South Road axis, despite it being the obvious route to the University from the south and from all the new housing on Mount Oswald.
Created by Matthew Phillips // 1 thread
The cycle path across the top of the golf course has no barriers at either end but does not seem to suffer from abuse by motorcyclists. However at two or three locations along the path there are staggered half-barriers on paths which lead to the housing estate to the north.
Barriers like this cause problems for longer cycles, such as tandems and recumbent cycles, as well as for families with child trailers or tag-alongs. Such barriers should preferably be removed and we need to seek to ensure that new developments do not introduce further barriers.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Martin Lucas-Smith // 2 threads
This junction has a new cycle lane over a widened pavement. This looks like very substandard infrastructure, encouraging pavement cycling, that should never have been approved by the County Council.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by Peter Lawrence // 2 threads
Please sign my change.org petition http://chn.ge/1epSzpK
Accident CC-23012014-0561 (Incident logged by the Cambridgeshire Police)
Leaving Zoology Department 18.15 walking east on Downing St, north side on 23 January, 2014. Car stopped in Downing st just west of Corn exchange road junction, obscuring the light. Lying on the road was a road sign warning cars of road works further left in Corn Exchange St, a needless warning. This 1 metre road sign had been placed on the pavement, occluding it seriously and had been, presumably, knocked over and left lying on the pavement with its black and invisible legs raised up about 10cm from the surface and its reflective surface tilted away (see picture). I tripped over the road sign in the dark and fell forwards injuring my face and forehead; the metal cut into my right leg. My glasses are destroyed, the leg of the sign tore my shoes.
I was taken to Addenbrookes and treated there. I left there ca 20.30 with head injuries and abrasions and now have an impressive black eye and surround.
I am seeking redress. I am exploring legal action against the County Council whose idiotic health and safety rules (for drivers, not for the rest of us) say that drivers should be warned in advance of even highly visible roadworks (in a 20mph area) and the company responsible for placing such a flimsy and dangerous sign right in the middle of a narrow pavement. Also am anxious that in general people who leave road traffic signs occluding the pavement or creating dangerous obstacles there, should be held responsible and penalised. I see these road signs often as I walk around Cambridge, they should be on or above the road, not blocking the pavement in my opinion.
The next day the same road sign, with my blood still on it, was back in the middle of pavement waiting to be knocked over again and even now forcing pedestrians to avoid it by diverting on to the roadway. I attach a photo of it taken on Friday the day following my accident with a diverted pedestrian on the right.
It was again fallen on the ground waiting to kill someone on Saturday night, presumably following the afternoon storms.
Created by North Devon Cycling Forum // 0 threads
Removal of difficult barrier on cycle path NCN3 ending on Rose Lane; hardly possible to pass by bike, let alone trikes/tandems/mobility vehicles;
note this is NCN!!!
Created by jpennycook // 1 thread
Outline planning application for the erection of up to 95 dwellings with public open space, landscaping and sustainable drainage system (SuDS). Demolition of garages to form a vehicular access point from Bow Drive and replacement garaging. All matters reserved except for means of access
Land At Goddards Farm Goddards Lane Sherfield-on-Loddon Hampshire
"Whilst there are no cycle routes currently in the vicinity of the site, the topography of the
surrounding roads make them generally conducive to encourage cycling. These provide
connections for cyclist from the development site to the wider area."
Basingstoke
Application reference : 17/02190/OUT
Martin Lucas-Smith // 2 threads
This junction has a new cycle lane over a widened pavement. This looks like very substandard infrastructure, encouraging pavement cycling, that should never have been approved by the County Council.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Hugh McClintock // 1 thread
Comments welcome please on this consultation about barriers on rights of way.
Pedals believes that any kind of barriers should be avoided as far as possible, especially those of the A-frame design. If access controls really are needed they should take the form of bollards (or staggered bollards) rather than barrier.
Message of 22 Feb 2016 from John Lee, Nottm City Council
Morning all
Some of you will recall taking part in its preparation.
We are in the process of reviewing the attached Policy. The policy was in response to complaints about the design of barriers the council have used on rights of way to deal with motorcycles and users safety. Although barriers help deter illegal use some designs were causing problems for disabled citizens, mobility scooters, double buggies and cyclists. When deciding whether a barrier is the best solution for a particular problem/location, the policy has helped provide a consistent approach.
As part of the review do you have any comments on the policy, for example is there anything else the policy should include so the rights of way network is kept free from unnecessary obstructions and is accessible by all? Please forward onto any contacts who may have an interest.
Please could I have your comments by Monday 21st March.
Regards
John Lee
Public Rights of Way
Traffic and Safety
Development and Growth
Nottingham City Council
Loxley House
Station Street
Nottingham
NG2 3NG
Tele: 0115 8765246
Mobile: 07976 794880
www.nottinghamcity.gov.uk/rightsofway
Created by Paul L // 1 thread
This path is included in the Richmond Cycle Map and leads to a toucan and is a useful link from Hampton to the quietish Lower Hampton Rd towards Sunbury but is marked "No Cycling".
There is little pedestrian traffic but ideally it could be made wider.
Created by ken thomas // 2 threads
Installation of 17.5m single stack pole base station and associated works
Telcommunications Site Off Caldy Valley Road Great Boughton Chester Cheshire CH3 5PR
Application reference : 17/00266/TEL
No drawings or details are shown on the planning website.
A recent drawing seen for the project shows the cabinets blocking half the available width of the cycle/footpath. Such siting is not acceptable on a recently developed cycleway designed to specific standards.
Created by Lewisham Cyclists // 1 thread
Overview
The Mayor of London’s aim for 2041 is for 80% of all trips in London to be made on foot, by cycle or using public transport.
LB Lewisham is working on initiatives to help reach this target by gearing towards a “Healthy Streets” approach as set out in the Mayor’s Transport Strategy (2017) which encourage people to use their car less. This will help reduce the amount of dirty air in London, encourage active travel and tackle congestion on our already clogged up roads.
(for more information on the Mayor’s Transport Strategy and the Healthy streets approach follow the link below)
Mayor of London's Transport Strategy
As part of the Healthy Streets approach the borough is working on building a comprehensive “Quietway Network” so residents can choose cycling and walking as a convenient transport choice.
This consultation is seeking comment on proposals to upgrade the existing cycle route that runs through Blackheath Common as part of the TfL funded Quietway programme to encourage more people to walk and cycle. The proposals include three new crossings over:
All feedback from the consultation will be used to inform the final proposals ahead of construction works in Spring 2019. These improvements will form part of an extension of Quietway Route 1 which currently connects Waterloo and Greenwich
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
Martin Lucas-Smith // 1 thread
Fulbourn/Cherry Hinton Eastern Access is one of the five City Deal 'cross-city improvements' schemes.
"The growth of housing and employment sites in the Cherry Hinton and Fulbourn Road area, such as the expansion of the ARM headquarters will put further pressure on local roads. Improving the cycleways on Fulbourn Road would enhance cycle access to the city centre and contribute to the completion of the cycleway network in this part of south-east Cambridge."
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by North Devon Cycling Forum // 1 thread
Surface of Tarka Trail Braunton-Barnstaple needs replacing long-term; wobbly sections developing
Created by MB // 1 thread
TFL are thinkingof closing this 'rat run' to motor vehicles & have put out a consultation here:
https://consultations.tfl.gov.uk/streets/coleparkroad
They are keeping it open to cyclists - but are proposing (I think) an awkward right- angled turn for cyclists to get in & out of the cul-de-sac. Can we suggest a better layout?
Consultation closes on May 10th 2013
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Created by Dawes Jaguar // 0 threads
Cycling is banned on Victoria Common, but it represents the sort of environment in which people love to cycle. In the short term the paths should be made shared use, but longer term it would be sensible to create cycle paths through the park.
Created by Rob Earl // 0 threads
Better access to NEPN than through St Mark's Park which involves an uphill, narrowing road approaching a blind bridge. Requires stopping in traffic to negotiate parked cars and kerb.
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we are developing proposals to improve safety at the junction of Tower Bridge Road and Abbey Street.
What we’re proposing and why
We are proposing to ban the left turn from Tower Bridge Road into Abbey Street to reduce the potential for conflict between cyclists and left-turning vehicles. Traffic counts show that fewer than 4 vehicles per hour make this turn at peak time.
We intend to ban the left turn towards the end of December 2012 and will advertise the changes to the Traffic Order in November.
Other planned changes at the Tower Bridge Road/Abbey Street junction
We are also developing proposals for more substantial improvements for cyclists and pedestrians at this junction, including improved pedestrian crossing facilities. More information will be available early next year, once these proposals have been developed further.
Earlier this year we marked-out Advanced Stop Lines (ASLs) in green and put blind spot safety mirrors on the signals at the junction so cyclists are more visible to vehicles turning.
Please click here to view map for further information on the proposals.
Have your say
Please give us your views by completing the online consultation form below by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/tower-bridge-abbeyst
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by Stefano B // 1 thread
New TFL survey on the proposed Wembley to Willesden Junction CS.
Have your say - Healthy Streets improvements between Wembley and Willesden Junction
Transport for London (TfL) and the London Borough of Brent are working together to develop Healthy Streets improvements between Wembley and Willesden Junction. These changes would make it easier and safer to walk, cycle, and use public transport in the area. Making the area safer, greener and reducing car travel. In this area, every year, people are seriously injured, some fatally. This cannot go on, and the Mayor has set a target to reduce the number of deaths and serious injuries on London’s roads to zero by 2041. Toxic air quality and high levels of physical inactivity are also contributing to premature deaths and poor health, especially in children. Together we want to improve this, particularly around schools. We know to achieve this some compromises will have to be made especially how much we use cars to travel. We want to create a better environment for everyone who wants to travel to and around the borough. So we are inviting local people to tell us how they currently travel around the area and what changes they would like us to make that would help and encourage more people to choose active travel options in the community.
Have your say - Your feedback at this early stage of planning will be used to help design future proposals which would be consulted on in late 2020/early 2021.
Please complete the following survey by 22 March 2020 to help us better understand how you travel and any travel issues or priorities in the areas of Wembley Central, Tokyngton, Stonebridge, Harlesden, and Kensal Green. Please email wembleywillesdenjct@tfl.gov.uk if you have any questions, comments or suggestions.
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by Stephan Matthiesen // 1 thread
A large number of brick strips have been installed across the path in Magdalene Glen in early 2017.
While these do nothing at all to deter fast cyclists, they are a real pain for slow cyclists, people with arthritic hands (due to the vibrations and need to grip the handlebar very strongly).
It is not clear if there has been any consultation about these measures. Neither Spokes nor anybody on the CEC forum seems to have been aware of the plans.