Vernon Street-Burrell Road-remove left priority filter
Remove left-turn priority filter: if you want to cycle to the station from Stoke Park Drive, you currently get a lot of stress from drivers honking at you from behind
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Andrea // 1 thread
Remove left-turn priority filter: if you want to cycle to the station from Stoke Park Drive, you currently get a lot of stress from drivers honking at you from behind
Created by Andrea // 1 thread
more cycle parking spaces for all times of the day needed
Cargo bike parking needed
Current two-tier parking for cycles are not female-friendly as upper tier too heavy to lift
Created by Jean Dollimore // 1 thread
Leather Lane has a well established market that trades on the street throughout the week
To stop vehicles using Leather Lane when the market is on, Camden proposes to close access to Leather Lane and other roads leading directly to Leather Lane with some consequent changes in parking provision.
Camden Council's proposals can be seen at:
They include the following:
Option A
- close Leather Lane
- close Hatton Wall, between Leather Lane and Hatton Garden
- close St Cross Street, between Leather Lane and Hatton Garden
- close Portpool Lane and Baldwin’s Gardens where they meet Leather Lane
Option B
- same as Option A but keeps St Cross Street open
Comments:
The proposal consistently refers to stopping "vehicles" using Leather Lane. It should refer to "motor vehicles" so that cycles still have access.
Reply due 5 December 2014.
Please add your comments by 1st December
Created by Andrea // 0 threads
a hotspot for delivery vans and cars parking on cycle lanes. We need enforcement to curb this
Created by Andrea // 0 threads
this section of Foxhall Road is hazardous as traffic is very fast. Can we have cycle lanes /traffic calming please?
Created by Andrea // 0 threads
cycle lanes very narrow with cars parked on, high traffic speed.
Traffic calming or more signage needed
Created by Andrea // 0 threads
high speed of vehicles and car parking make this road section hazardous. Traffic calming and signage needed.
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Created by Shaun McDonald // 0 threads
Issue raised at the 10-2014 Cycle Ipswich meeting:
"not enough showers", need more information, such as whether this is specific to a particular department or building.
Created by Shaun McDonald // 1 thread
It's rather odd that the NCN1 has a route sign that tells you to turn right, plus a cycle sign towards the station, yet there is a no right turn sign on the same post.
Martin Lucas-Smith // 3 threads
The University is planning to redevelop the New Museums site. We need to monitor the proposals for cycle parking and cycle access issues.
http://www.admin.cam.ac.uk/offices/em/estate/site/newmuseums.html
NB The Arup Building redevelopment currently in progress is part of the overall redevelopment.
Let's see what happens!
Council Plans to change the Zebra crossing in this area. RCC responded to try to shape the plans to encourage more cycling and walking.
-------
Sheen Road Zebra Crossing Proposed Upgrade - Response from Richmond Cycling Campaign (RCC)
RCC is in general supportive of improving crossings when the upgrades benefit both pedestrians and cyclists. This proposal unfortunately has not fully thought through the interaction of cyclists, pedestrians and motor vehicles, unfortunately we cannot support it in its current form.
RCC would recommend that the scheme is implemented with the changes outlined below. The recommended changes will ensure that vulnerable road users safety is prioritised and the comfort of the cycling and pedestrian experience is enhanced:
The crossing should be raised to slow approaching vehicles. Vehicle speeds are too high in this area, particularly considering the proximity to a primary school.
Removal of the central refuge to create a single stage crossing is to be applauded. This will remove a cycle pinch point and will correctly prioritise pedestrians over other road users.
The new road space that is created by the removal of the central refuge should be used to extend the existing mandatory cycle lanes on each side of the carriageway. It is our understanding that the 2015 TSRGD (traffic signs regulations and general directions) will permit the extension of the cycle lanes over the crossing. The work should pay heed to this so that this can be incorporated when the new regulations go live.
Keep the zebra crossing. RCC cannot support the removal of the zebra crossing at this location, changing to a traffic light controlled crossing, prioritises vehicular traffic over pedestrians and those on bicycles. It is RCC’s belief that concerns, from users, that vehicles are not stopping in a timely fashion at this location are due to excessive speeds rather than the style of crossing. As mentioned earlier lower speeds should be achieved through a raised crossing to make the zebra crossing more effective. An enhanced zebra crossing keeps priority with the most vulnerable road users.
The proposal suggests widening the pavement to make the crossing shorter. This would only have a marginal impact on the time to cross. The pavements should not be widened since this will not permit a continuous cycle lane. It will force cyclists to pull in front of fast moving motor vehicles, creating a new pinch point and hazard for cyclists.
The railings on either side of the road should be removed. TfL research has shown that these encourage high traffic speeds and do little to protect vulnerable road users.
Created by Shaun McDonald // 0 threads
Comments at Cycle Ipswich meeting on 2014-10:
"no cycle lanes"
"scary" referring to the roundabouts.
Created by Shaun McDonald // 1 thread
Comment from October 2014 Cycle Ipswich meeting:
"Want separate cycle and pedestrian lanes all the way along the river path."
Currently the river path is a useful off road link, however it's far too narrow for both pedestrians and cyclists.
Created by Shaun McDonald // 1 thread
Comment from October 2014 Cycle Ipswich meeting:
"Belle Vue Road is very steep for a recommended cycle route."
It's marked on the Ipswich Cycle Route Map.
Created by Shaun McDonald // 0 threads
Comment from October 2014 Cycle Ipswich meeting:
"New white lines force cyclists into traffic."
Created by Shaun McDonald // 0 threads
Comment from the Cycle Ipswich meeting:
"Traffic enforcement for speeding especially 6:15-7pm weekdays."
Created by Shaun McDonald // 1 thread
Comments from Cycle Ipswich meeting:
"Clearer signage - for all"
"More obvious route to/from town"
"alternative 'football days' routes"
Created by Shaun McDonald // 1 thread
Comments from the Cycle Ipswich meeting:
"Poor infrastructure - shared use footway no good"
"poss pinch point removal bot other traffic calming."
Created by Shaun McDonald // 0 threads
Cycle Ipswich Meeting: "Getting south across Star Lane to waterfront very unpleasant".
Where the cyclepath merges onto the road outside the Mercedes garage going to Huddersfield . The white lining disappears and the kerbs rises out of the ground causing a hazard.
I recently came off at speed here causing injury and damage .
Created by Shaun McDonald // 0 threads
Comment at Cycle Ipswich meeting on 2014-10-09:
"not at all nice - cycle "lane" too narrow, not visible in dark, potholed, conflict with turning traffic etc. better to have only 1 lane motors and thus proper [cycle] lane??? (still left turn problem)"
Created by Shaun McDonald // 0 threads
Pedestrians and cyclists are put into conflict when trying to cross at this toucan crossing on Grimwade Street/Rope Walk junction.
Created by Shaun McDonald // 0 threads
The route to Tattingstone from Ipswich requires going along a part of the A137 or over some fields, neither of which is pleasant. An improved alternative is sought.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by Cycling Dumfries // 1 thread
At the moment there are toucan crossings from the Whitesands up to the High Street past the lower entrance to the Loreburne Centre (where the buses stop) but there is no actual cycle path so you end up illegally on the pavement. It would be a useful route otherwise, as long as cyclists can get past the bus stops (and waiting bus passengers).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.