LCDS draft
A section by section discussion list for recording comments on the current 2014 consultation draft of the London Cycle Design Standards - LCDS
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by charlie_lcc // 10 threads
A section by section discussion list for recording comments on the current 2014 consultation draft of the London Cycle Design Standards - LCDS
Created by charlie_lcc // 5 threads
The London Cycle Safety Action Plan 2 (CSAP2) draft is out for consultation. Deadline 25th July 2014
https://consultations.tfl.gov.uk/cycling/draft-safety-action-plan
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Richard Moss // 1 thread
The Over to Longstanton road is to be closed from 30 June 2014 for 9 weeks for reconstruction of Gravel Bridge.
Created by Paul L // 3 threads
Richmond Council say
"a signalised PUFFIN crossing with pedestrian countdown outside number 182 Kew Road (previously outside 180) Footway widening both sides of Kew Road. We have attempted to minimise the impact on the cycle lanes by introducing long tapers and following existing extended footways where possible. The kerb widening is essential to ensure sightlines to the signal heads past the many street trees."
We suggested cranked supports for the signals to avoid the loss of cycle lanes but they claim TFL disapproval.
Created by timlennon // 1 thread
Text of message from TfL:
All,
We are proposing to convert the current dual PUFFIN crossing at the above location to a dual TOUCAN crossing, formalising the facility for cyclists.
The initial design is attached, which includes localised resurfacing of footways and some carriageway works. A lighting assessment has also been undertaken which recommends a full lantern replacement of the columns retaining all lighting columns once structural testing has been completed and passed.
We also propose to extend the shared use footway further north on Marksbury Avenue and further south on Manor Grove to enable safer entry/exits for cyclists to the TOUCAN crossing.
The impact (if any) is currently being determined by Traffic Signals.
If you have any comments or suggestions, please let me have these by cop Friday 27th June.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by David Earl // 1 thread
The DfT have written to us with a proposed TRO to replace the sliproad from westbound A14 at Girton to southbound M11. This is also part of the widening scheme between Histon and Girton, but this aspect requires an order to give the lane motorway status. The main effect seems to be to lengthen the A14 part of the slip road to reduce queues on the main A14.
I don't think anything particular needs doing with this, so I don't plan to scan the correspondence, but if anyone wants if, please ask.
Preferred route to be signed as an alternative to Chilwell High Road agreed between City, Broxtowe and County Councils.
Created by MJR // 2 threads
Some of (the last of?) the s106 money from two out-of-town big box supermarkets is being used to remodel the connections between the bus and rail stations. National Route 1 runs through this area and the bus station may also be Lynn's biggest cycle park, so there's quite a lot of potential for this to do good - or to do harm.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Area Committees are a joint meeting attended by both city and county councillors. They decide on planning issues in the area, but also have a role in the allocation of community development money from S106 contributions. They offer an opportunity to engage with multiple councillors at once, through the Open Forum section and speaking on specific Agenda items. The East Area's website is here: https://www.cambridge.gov.uk/west-central-area-committee
Speaking at these meetings is a good way of making your feelings on matters the councils control public
As discussed between local cycling organisations there is a desperate need for a signed route which avoids Chilwell High Road where there have been a number of accidents now tram tracks are laid in places. This route also avoids Beeston High St which is a lengthy dismount section from 9-5. This route supersedes the previous northerly route. A southern avoiding route has also been plotted on cyclescape
Created by Jean Dollimore // 1 thread
The proposals seek to improve road safety on the streets surrounding Regents High school in Somers Town which is being rebuilt. This school is labelled "South Camden Community School" on the map.
The consultation is on Camden's website at:
Currently the school is accessed from Charrington Street but the new building is going to face the other way and will be accessed via Chalton Street. Therefore most of the proposal are related to making a new school entrance and building out the footways in Chalton Street while taking them away in Charrington Street. All of this is clearly necessary, but doesn't appear to add to road safety.
The council also proposes a new speed table at the junction of Chalton Street and Aldenham Street. This would help with road safety.
Cyclists are already concerned with the rat-running on Ossulston Street; this quite likely accesses Eversholt Street via Chalton Street. Surely we should ask for this rat running to be prevented both for the safety of the cycle route and for children going to Regents High School?
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Anon // 0 threads
There is currently no secure locks provided at Port Rodie bus stop, the main departure stop for buses eastwards towards Dumfries and Carlisle.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Peter Loader // 0 threads
Transport Initiatives LLP is an independent transport planning consultancy. They have carried out an audit for Three Rivers District Council classifying roads, paths and crossings in terms of the UK National Cycle Training Standard (Bikeability) Level needed to be able to ride in comparative safety. The results can be seen on Three Rivers District Council's web site.
Transport Initiatives have classified the roundabout at M25 Junction 17, the adjacent Maple Cross Roundabout, and the dual carriageway between them as Level 3.5, i.e. "Roads & crossings with a very high level of risk, unsuitable for even highly experienced cyclists".
For detailed documentation, please see
http://www.threerivers.gov.uk/Default.aspx/Web/CyclingInformation
and download
Maps by area|Maple Cross
plus
Cycling safety audit|CSNA Leaflet
Following closely the route of an old railway line between Colchester and Brightlingsea this proposed route would link Colchester to Walton-on-the-Naze. It provides a much needed commuter route out of Brightlingsea linking it safely to Wivenhoe, the University of Essex and Colchester and creates a new leisure route in a holiday district. It builds on the existing four mile NCN51 route from Colchester to Wivenhoe by adding 5 miles off-road to Brightlingsea via a new river crossing at Alresford Creek. From there it utilises an existing pleasant frequent summer ferry crossing to Point Clear and creates a 25 mile coastal route much of it off-road.
Created by Gary // 0 threads
To improve safety after numerous fatal car accidents the Highways Agency are currently implementing speed restrictions but are also designing a new roundabout for the A120 near Pellens Corner/Horsley Cross. NCN51 passes nearby. Cyclists don't generally want to cycle the A120 but we do have to cross it to get across Tendring District. Roundabouts are particular hard for cyclists to use on A roads. So will the Highways Agency proposal include the needs of cyclists? http://www.highways.gov.uk/roads/road-projects/A120-Pellens-Corner-Average-Speed-CamerasSafety-Improvements
Created by Gary // 0 threads
Why would you put a gate across an official cycle route through the "Hangings" in Harwich, on the North Sea Cycle Route from Harwich International to Harwich Town? I've seen visitors from Europe try and cycle through this obstruction with trailers.
Created by Anna Langley // 0 threads
In advance of whatever fair it is appearing on Midsummer common, the "cyclists dismount" signs have appeared on the entrances to the common.
Created by David Earl // 1 thread
Leaflet through my door today about "new homes on land off Teversham Road, Fulbourn". Unspecific at this stage, will be revealed, no doubt, at consultation event on 28 June. But it must be big for the scale of the consultation. It also has a website: http://www.castlefieldconsultation.co.uk but that also says nothing very specific as yet.
Created by Jean Dollimore // 6 threads
This scheme proposes to restore two way working in Tottenham Court Road (TCR) and in the Gower Street alignment which includes Bloomsbury Street and Shaftesbury Avenue. All the bus routes will be on TCR.
The consultation is on Camden's website at:
http://www.wearecamden.org/westendproject/
In TCR, Camden proposes a "bus and cycle street" from 8 am to 7pm (Monday to Saturday) with local access for cars, taxis and loading on short sections of Tottenham Court Road via side roads.
TCR will have a pair of 4.5m wide carriageways to be shared by cycles and buses (90 buses per hour in each direction) and by the additional local traffic.
In the Gower Street alignment, Camden proposes two-way access for private motor vehicles (no buses) and that these roads will have a pair of 4.5m wide carriageways, each including a lightly segregated 1.5m wide cycle track.
Other measures proposed:
- in both TCR and the Gower Street alignment Camden proposes raised sections of road to reduce motor speeds
- two-way cycling in all the side streets (except for Maple Street, University Street and Howland Street)
- new public spaces including a new park on Alfred Place and a ladder of calm side streets.
These changes to roads and to cycle permeability are shown in the diagram at:
http://www.wearecamden.org/westendproject/assets/images/cycling-plan-resized
Details of the road layout for TCR are at:
http://www.wearecamden.org/westendproject/assets/images/tcr-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/tcr-south-resized
Details of the road layout for the Gower Street alignment are at:
http://www.wearecamden.org/westendproject/assets/images/gower-street-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/gower-street-south-resized
Exhibitions are to be held at the Building Centre, Store Street on 19th June (10 am to 5pm) and 7th July (5pm to 8pm),
Camden Cyclists are holding a public meeting for cyclists to discuss this project.
On 30th June 7pm - 9pm
at the YMCA Indian Student Hostel, 41 Fitzroy Square, London, W1T 6AQ.
We will finalise our response to the consultation early in July.
The public consultation will run until Friday 18 July 2014.
Created by Charlie Halliday // 1 thread
Proposal by HCC to add advisory cycle lanes on both sides of Kingsmead between the SUP near the junction with Victoria Road to the entrance of Pinehurst car park.
The cycle lanes would have a contrasting red surface at the entrances to Sainsburys and the Kingsmead and Sainsburys car parks.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by Elizabeth E. // 1 thread
TfL are making changes to junction because of safety issues.
For Cyclists:
Two-stage right turns at the junction in the west to south and east to north directions
An early release at the traffic lights on all four arms of the junction
Deeper Advanced Stop Lines (ASLs)
Mandatory cycle lane on Camberwell Church Street westbound approach to operate at all times
St Giles bus stop moved further west from the Vicarage Grove junction to improve safety of left turning cyclists on the LCN 23 cycle route
Resurfacing throughout the junction.
Retention of the 20mph speed limit at the junction and on all the approaches.
Created by Andrea // 1 thread
Remove left-turn priority filter: if you want to cycle to the station from Stoke Park Drive, you currently get a lot of stress from drivers honking at you from behind
Created by Jean Dollimore // 1 thread
Camden is consulting on improving safety for pedestrians in the vicinity of Hampstead School in Westbere Road.
See StreetView from Lichfield Road (Barnet) towards Westbere Road Camden showing Hampstead School on the left and the 20 mph sign
Created by jpennycook // 1 thread
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Kate Ravilious // 2 threads
The Fishergate Gyratory is a complete nightmare for all cyclists and very dangerous. Crossing the lanes of the busy dual carriage-way is dangerous and drivers show little awareness or patience with cyclists. The entire junction needs rethinking.
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Created by North Devon Cycling Forum // 0 threads
Change of Road lay out on Long Bridge; NO new centre road line when road is due resurfacing and long term research into "shared space" alternative road surface
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by jpennycook // 1 thread
Erection of Class A1 and Class A3/A5 units. Provision of highway works and alterations to access; parking; landscaping; service infrastructure; and associated works and improvements.
St Michaels Retail Park The Harrow Way Basingstoke Hampshire
Basingstoke
Application reference : 16/04208/FUL
NCN45 across Peckforton Hill at risk of being closed
Created by Simon B // 1 thread
Adjacent to existing apartments on Sealand Road near the Cop is a new development currently under construction by Watkins Homes Ltd. Curently there is a barriered-off ramped access to Sealand Road to cross the Canal entrance to the river that leads around the exisiting apartments. This was originally envisaged as part of a continuous shared use riverside route.
The development of the site offers the opportunity to ensure that shared use access can be maintained, developed and improved along the riverside route that skirts the perimiter of the Racecourse and continues to the River Dee path that leads to Garden City and Queensferry. This could be before residents purchase properties who could well be resistant to a pathway near their new homes.
Whilst the access to the River Dee from the Shropshire Union Canal presents a barrier to a straightforward continuation of the riverside route to join the River Dee shared use path into Wales, the creation of a small extension around the permiter of the new development under construction would mean that an attractive continuous offroad route could be created with minimal additional works (widening of the existing footway for approximately 100mtrs).
It would be helpful to gather thoughts and ideas before the developers and Planning and Highways Department of the Local Authority are approached about this opportunity
Created by Roxanne (CEO) // 0 threads
Plans are emerging for development on the Coldham's Lane site with implications for the surrounding area including links with Cherry Hinton.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Simon Nuttall // 3 threads
London Cycling Campaign's Space for Cycling campaign
Has a clear message - what can we learn from them?
Barriers, so many barriers, most of which should be removed.