Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first:

  • Woolton Road Cycle Route

    Created by dunschen // 0 threads

    Woolton Rd cycle route needs fixing. Too much parking on the advisory cycle lane to start with.

    Please sign in to vote.
  • Forest Road Proposals

    Created by Paul Gasson // 2 threads

    Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of £27 million from Transport for London, we’re delivering the Mini-Holland Programme to make our streets fit for everyone to use, whether you walk, cycle, use public transport or drive.

    The Mini-Holland Programme is about making our streets work for everyone and our borough a better place to live, work and travel. By creating designated space for cycling, creating routes that better connect our town centres and redesigning some of our public areas, we want to help cut down unnecessary traffic outside your home, and provide safer and healthier travel options so that people enjoy living and spending time in the borough.

    Between 2010 and 2014 there were 181 collisions on Forest Road and air pollution in Waltham Forest is on the increase. At peak times of the day, we have up to 6,000 extra cars on our borough’s roads due to the school run making our roads more congested than ever before. We need to do something about this so that everyone can get from A to B easily and safely.

    What’s planned for Forest Road?

    The Mini-Holland Programme is made up of a network of walking and cycling routes, one of which is Forest Road. These routes aim to better connect areas within the borough such as our town centres and residential areas, making it easier for people to walk and cycle for local journeys. The routes also help connect Waltham Forest to our neighbouring boroughs, attracting visitors and boosting business for our local economy.

    Forest Road is a busy route used by up to 17,000 vehicles daily, and is home to around 3,600 residents and 340 businesses. It’s a key route in Waltham Forest connecting Woodford New Road to Ferry Lane, and is already an important walking and cycling route that helps people get to key places like the William Morris Gallery, Lloyd Park, Walthamstow Wetlands and other local facilities.

    Over the last few years Forest Road has seen a 56 per cent increase in people cycling to get around. To make this road safer for all road users we’re planning to make the following improvements:

    Upgrade all major junctions
    Improve and create new pedestrian and cycle crossings to make the area safer and more accessible to people who walk and cycle
    Upgrade and relocate bus stops to bring bus facilities up to Transport for London’s standards and make it easier for disabled people and people with push chairs to get on and off buses
    Introduce new blended ‘Copenhagen’ crossings at all side road junctions, giving pedestrians a continuous pavement rather than a traditional kerb that they need to wait at before crossing the side road. These crossings encourage vehicles to slow down when entering and exiting the side road, ensuring that pedestrians or people cycling have right of way, as per the Highway Code
    Create segregated cycle lanes which create separate, designated space for cycling – making it safer and easier for cycles and vehicles to share the road
    Invest in new public spaces, making Forest Road more enjoyable to use, and benefitting residents, businesses and visitors to the area.

    Also, with Walthamstow Wetlands due to open in spring 2017, we will work with Haringey Council to improve the overall environment of Forest Road between Ferry Lane and Blackhorse Road junction.

    Walthamstow Wetlands will offer access to 200 hectare of unique wetland nature reserve land and is predicted to attract 250,000 visitors a year. This investment to Walthamstow Wetlands will significantly benefit residents and visitors to both Waltham Forest and Haringey.

    We’ll also improve the cycle connection between Blackhorse Road junction and Tottenham Hale, making the area more accessible for the 250,000 people predicted to visit Walthamstow Wetlands yearly.

    Please sign in to vote.
  • Markhouse Road Proposals

    Created by Paul Gasson // 1 thread

    Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of £27 million from Transport for London, we’re delivering the Mini-Holland Programme to make our streets fit for everyone to use, whether you walk, cycle, use public transport or drive.

    Over the last three years, there have been 40 collisions on Markhouse Road and air pollution in Waltham Forest is on the increase. At peak times of the day, we have up to 6,000 extra cars on our roads due to the school run making our roads more congested than ever before. We need to do something about this so that everyone can get from A to B easily and safely.

    The Mini-Holland Programme is about making our streets work for everyone and our borough a better place to live, work and travel. By creating designated space for cycling, creating routes that better connect our town centres, and redesigning some of our public areas, we want to cut down unnecessary traffic outside your home, and provide safer and healthier travel options so that people enjoy living and spending time in the borough.

    What’s planned for Markhouse Road?

    The Mini-Holland Programme is made up of a network of walking and cycling routes, one of which is Markhouse Road. These routes aim to better connect areas within the borough such as our town centres and residential areas, making it easier for people to walk and cycle for local journeys. The routes also help connect Waltham Forest to our neighbouring boroughs, attracting visitors to the borough and boosting business for our local economy.

    Markhouse Road forms part of the Leyton to Blackhorse Road walking and cycling route, which connects Forest Road and Leyton High Road. Running from St James Street to Lea Bridge Road, this part of the route is heavily used with over 19,000 vehicles and around 600 cyclists using it every day. We’re now looking to modernise this part of the route to make travelling in the borough by bike and on foot easier and safer.

    We know that Markhouse Road is popular for people cycling from Leyton to Walthamstow, so we want to improve it by creating segregated areas where possible, making it safer and easier for all road users to share the road.

    We’re also planning to put blended ‘Copenhagen’ crossings in on a number of side streets, which extend the pavement across the road, helping to enforce the Highway Code by encouraging vehicles to give way to pedestrians and people on cycles. We recognise that there is a place for cars in our borough, but want to make our roads safer by creating junctions that encourage drivers to slow down and take extra care at key points. We’ll also be investing in junctions, pedestrians crossings and bus stops, and will create attractive public spaces with more trees, making the area a more enjoyable place that people will want to use.

    What has happened so far?

    In October 2015, we looked at traffic and collision numbers on Markhouse Road to understand what changes need to be made to make the route safer. This information - along with the plans proposed in the Mini-Holland bid document which we submitted to TfL to win the funding for the programme - have been used to develop a set of proposals to improve the area.

    We want to involve the local community in shaping the plans and are now seeking feedback on the proposed improvements from residents and businesses, so that we can develop a scheme that meets the needs of the local community as a whole.

    As well as seeking your views, we will be in contact with key stakeholders including the emergency services to make sure the design enables them to do their important work day to day, and we will continue to engage with them as the scheme progresses.

    What happens next?

    All of the feedback received will be grouped, carefully analysed and used to shape the final design.

    Where there are elements of the scheme that are not well supported by residents and businesses, we will look at these again. Where it’s possible to make changes based on your comments and suggestions we will, and where we can’t we will explain why. A summary of the results and feedback will be sent to everyone who took part after the public consultation stage has ended. This will set out the results and how they have been used to help shape the final design. This will also be available on the website for everyone to see.

    Before we get to the design stage, Transport for London (TfL) will also need to approve all of our plans as the funders of the Mini-Holland Programme.

    Please sign in to vote.
  • Bridge over A142 unusable by larger cycles

    Martin Lucas-Smith // 1 thread

    I have been in contact with County Council about the bridge over the A142 at Soham.

    There are 4 sets of metal barriers on the cycle/foot bridge. They are too close together. Larger cycles, i.e. cargo bikes, bikes with child trailers, tag alongs and recumbents cannot
    use the bridge. Bridges in Cambridge do not have these barriers.

    Please sign in to vote.
  • Little Ealing Lane Raised Table Cycle Track

    Created by Space Pootler // 2 threads

    1. Relocation of the existing zebra crossing on Little Ealing Lane closer to Weymouth Avenue The crossing will be installed on a raised table which will help to slow down traffic. Existing parking spaces directly outside Little Ealing Primary School will be relocated which will improve visibility for drivers exiting Weymouth Avenue.

    2. Installation of a new shared zebra crossing outside Mount Carmel Primary School. This will help parents and pupils of this school to cross the road safely, and make it easier for cyclists to turn right from Radbourne Avenue into Little Ealing Lane. The new zebra will be also raised which will help to further reduce speeds of vehicles. This will result in removal of existing School Keep Clear markings.

    3. Cycle track adjacent to footway to separate cyclists form motor traffic on the section of the road where they are at the most risk. The track will also provide a safer link between Radbourne Avenue and Weymouth Avenue, which is part of a proposed ‘Quietway’ cycle route linking Brentford and Ealing. This will also result in removal of existing School Keep Clear markings which will be replaced by double yellow lines.

    Please sign in to vote.
  • A13 Commercial Road between New Road and Jubilee Street

    Created by Simon Munk // 1 thread

    TfL Overview:
    We would like your views on proposals to improve safety, journey time reliability and the urban realm on Commercial Road between New Road and Jubilee Street in the London Borough of Tower Hamlets.
    We have identified a higher rate of collisions along this stretch of road compared to similar roads in London, particularly involving pedestrians, cyclists and motorcyclists. Therefore, we are proposing a scheme that is designed to reduce the number of collisions involving these vulnerable road users.
    The area also suffers from vehicle congestion, particularly at peak times. Parked vehicles prevent buses from using the eastbound bus lane at busy times, which causes delays to bus passengers.

    What are we proposing?
    We are proposing to implement a number of changes to improve conditions for bus passengers and vulnerable road users. These include:

    Pedestrians
    - Raised carriageway with coloured surfacing on Commercial Road between Turner Street and Sidney Street to help lower traffic speeds and reduce collisions. There would still be a detectable kerb height between the road and the footway
    - Converting the pedestrian crossing outside Watney Market to a wider straight crossing and relocating it closer to the market. This would mean pedestrians crossing in one stage rather than waiting on a central island. Pedestrian “Countdown” at the crossing would also be provided.
    - Providing a wider crossing point for schoolchildren outside Mulberry School for Girls and installing electronic signs to make drivers more aware of schoolchildren crossing
    - Raising the level of all side road entrances and providing kerb build outs to reduce traffic speeds, making it easier for pedestrians to cross
    - Providing a continuous footway across the following side roads to give priority to pedestrians and a smoother crossing surface: Richard Street; Jane Street; Anthony Street; Fenton Street; Buross Street; Hungerford Street; Bromehead Street
    - Reducing kerb heights, particularly around Watney Market, to help pedestrians
    - Installing low level central islands to help pedestrians cross the road informally
    - Upgrading pavements where damaged or uneven

    Other Road Users
    - Re-surfacing sections of the road to provide a smoother surface for cyclists and motorcyclists and to reduce noise
    - Making Turner Street “no entry” to motor traffic (except cycles) from Commercial Road in order to improve safety outside Mulberry School for Girls and to prevent vehicles queuing back onto Commercial Road at busy times. Access would still be possible using other routes, and motorists would be able to exit Turner Street onto Commercial Road as they do now
    - Widening bus lanes to 4.5 metres to allow cyclists and motorcyclists to pass buses more safely. We would create space for this by changing the hours of operation of the parking bays on the North side of Commercial Road
    - Converting some existing parking bays into two new loading bays.
    - Changing parking controls where necessary on the north side of Commercial Road by converting existing ‘all day’ parking (Mon-Sat 7am-7pm) to off-peak times (Mon-Sat 10am-4pm). This would allow the bus lane to operate at peak times (Mon-Sat 7-10am and 4-7pm)
    - Providing Advanced Stop Lines for cyclists at junctions to let them wait ahead of other traffic

    Urban Realm Improvements
    - New tree planting where conditions allow.
    - Improving the urban realm – reducing clutter, better paving and a more pleasant environment particularly around Watney Market

    Please sign in to vote.
  • Nottm City Council Review of barriers on rights of way

    Created by Hugh McClintock // 1 thread

    Comments welcome please on this consultation about barriers on rights of way.

    Pedals believes that any kind of barriers should be avoided as far as possible, especially those of the A-frame design. If access controls really are needed they should take the form of bollards (or staggered bollards) rather than barrier.

    Message of 22 Feb 2016 from John Lee, Nottm City Council

    Morning all

    Some of you will recall taking part in its preparation.

    We are in the process of reviewing the attached Policy. The policy was in response to complaints about the design of barriers the council have used on rights of way to deal with motorcycles and users safety. Although barriers help deter illegal use some designs were causing problems for disabled citizens, mobility scooters, double buggies and cyclists. When deciding whether a barrier is the best solution for a particular problem/location, the policy has helped provide a consistent approach.

    As part of the review do you have any comments on the policy, for example is there anything else the policy should include so the rights of way network is kept free from unnecessary obstructions and is accessible by all? Please forward onto any contacts who may have an interest.

    Please could I have your comments by Monday 21st March.

    Regards

    John Lee
    Public Rights of Way
    Traffic and Safety
    Development and Growth
    Nottingham City Council
    Loxley House
    Station Street
    Nottingham
    NG2 3NG

    Tele: 0115 8765246
    Mobile: 07976 794880
    www.nottinghamcity.gov.uk/rightsofway

    Please sign in to vote.
  • Highcliffe Rd & Bluebell Wood

    Created by WildNorthlands // 0 threads

    Highcliffe Rd is used as a rat-run between Fulwood and Bents Green/Ecclesall. It's a difficult road for cyclists as it starts off very steeply and is quite narrow, with cars parked on the uphill side. There is an alternative route through the woods - a bridleway that if brought up to standard would provide a very pleasant alternative for cyclists heading to/from Bents Green, with a direct link to NCN6.

    Please sign in to vote.
  • Quiet way on Essex place, Chiswick

    Created by T Harris // 1 thread

    Hounslow Cycling has been asking for a Quietway on Essex Place as a way of getting to Belmont Primary School.

    Lendlease currently have a planning application to redevelop the area

    Please sign in to vote.
  • Poor lane marking eastbound at Park and Ride on Madingley Road

    Created by Ben Brierton // 1 thread

    The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.

    The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.

    There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.

    Please sign in to vote.
  • Lack of westbound cycle lane before M11 on Madingley Road

    Created by Ben Brierton // 1 thread

    The new road layout on the westbound approach to M11 turning on Madingley Road has poor provision for cyclists.

    Cyclists going westbound now have to take the second lane for a few hundred metres with traffic passing at speed on both sides. Traffic passing in the left lane will be taking the slip road onto the M11 and traffic in the second lane will be going straight on.

    Please sign in to vote.
  • Transport Strategy for East Cambridgeshire

    What is the Draft Transport Strategy for East Cambridgeshire?

    We have drafted a transport strategy to tackle the current and future transport pressures in and around the district, and to help support growth in East Cambridgeshire. The purpose of this strategy is to:

    Provide a detailed policy framework and Action Plan of potential transport improvements for the area, addressing current problems and consistent with the policies of the third Cambridgeshire Local Transport Plan 2011-2031 (LTP3).
    Support the East Cambridgeshire Local Plan, and take account of the committed and predicted levels of growth, detailing the transport infrastructure and services necessary to deliver this growth.

    The strategy contains details of the schemes proposed in the short and medium term as well as the longer term schemes as proposed in the Long Term Transport Strategy.

    We want the views of anyone who lives, works, visits or travels through East Cambridgeshire in order to improve this draft transport strategy. Let us know your views on the strategy objectives, policies and the action plan of proposed transport improvements for the area by answering the questionnaire before the 8th April 2016.

    View the TSEC consultation leaflet (pdf, 1MB) for a summary of the information we are consulting on and answer the questionnaire. Alternatively, hard copies of the consultation leaflet and questionnaire are available at libraries and doctors surgeries around East Cambridgeshire or by request via the contact details below.

    Come to talk to us and fill in a questionnaire at one of the public exhibitions below:

    Please sign in to vote.
  • Chapeltown Rd Leeds

    Created by dpattinson // 1 thread

    Although cycle lanes are marked in parts along Chapeltown Rd going out of town, it is quite dangerous, especially where there is parking for the shops along the west side of Chapeltown Rd. A particular concern is just after the pedestrian crossing lights past Mexborough St, opposite Costcutters. The vehicle lane narrows for the pedestrian island in the middle of the road, but straight after it are car parking spaces which protrude out into the road, creating a bottleneck so cyclists have to go into the middle of the vehicle lane to get around cars parked there. I've had a few close calls there as impatient vehicles try to push past where there is no room.

    It is almost normal during peak hour to have to negotiate cars parked on double yellow lines across the cycle lane.

    Please sign in to vote.
  • Historic Core Conservation Area Appraisal

    Martin Lucas-Smith // 1 thread

    Cambridge City Council is consulting on an update to its Historic Core Conservation Area Appraisal.

    The Historic Core Conservation Area Appraisal covers 70+ streets in the city centre which are defined according to their significance. This significance can be their historical, architectural or social impact on the character and appearance of Cambridge.

    The original appraisal, which was published in 2006, has been reviewed to ensure that it is up to date with any new developments within the city centre, and that any new pressures on the historic heart of Cambridge are recognised. This revised document is now out to public consultation.

    Please sign in to vote.
  • Concrete obstruction at Calverley Bridge

    Created by M Stanley // 1 thread

    Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.

    Reported to Leeds City Council via online reporting system 26/02/2016

    Please sign in to vote.
  • Gunnersbury Avenue & Chiswick Roundabout TfL consultation

    Created by T Harris // 2 threads

    ‘Segregated cycleway’ planned for western side of Gunnersbury Avenue (next to park and cemetery)
    Transport for London are proposing widening the cycleway on the western side of Gunnersbury Avenue, next to the cemetery and park.

    ‘Shared pavement’ planned for eastern side of Gunnersbury Avenue
    TfL are proposing to make a 5m wide ‘shared use area for pedestrians and cyclists’ on the eastern side.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top