Downham Basil/Coriander/Bay 20mph
Basil Drive, Coriander Road and Bay Walk are residential streets that probably should be a 20mph zone, at least to avoid sat-nav routing cars that way in preference to Rosemary Way.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by MJR // 1 thread
Basil Drive, Coriander Road and Bay Walk are residential streets that probably should be a 20mph zone, at least to avoid sat-nav routing cars that way in preference to Rosemary Way.
Created by Hester Wells // 1 thread
"Following a request for a vehicular access outside of 27 Tenison Avenue it is
proposed to revoke a 5 metre length of Residents Parking Bay and replace it with
double yellow lines.
If you wish to object to any of these proposals you should send the grounds for
objection in writing to policyandregulation@cambridgeshire.gov.uk to reach us by no
later than 19th September 2014 quoting reference PR0147."
Created by David Butler // 1 thread
Extensive package of measures which "aims to transform the accessibility and connectivity to and around Stockport town centre.
The plan considers access by all modes of travel and specifically aims to ease congestion for buses and general road traffic, as part of an ambitious vision and development framework for investment in the town centre"
Created by John Chamberlain // 3 threads
Camden are consulting residents, cyclists and others on their plans to extend the Royal College Street cycle facilities to the north, across Camden Road and up to Kentish Town Road. If it is approved, we think this will be a great improvement as it will provide protected two-way cycling all the way. Later there are plans to extend it south to Kings Cross.
We hope you will respond to Camden in support as there may be objections from residents, especially as it results in some loss/relocation of parking.
Details of the proposals can be found on Camden’s website at:
https://consultations.wearecamden.org/culture-environment/royal-college-street-walking-and-cycling-improveme
For cyclists, the main proposals are as follows:
- Two way cycling all the way up and down Royal College Street with no need to use St Pancras Way or Camden Street.
- Protected northbound and southbound cycle lanes with no loading or parking within the cycle lanes.
- A separate green phase for N-S and S-N bound cyclists at Camden Road.
The difficult areas are the Camden Road crossing, which we think Camden have handled in an effective and innovative way, and the southbound split at College Gardens, where motor traffic has to bear left but cyclists go straight. This is not easy to handle without the danger of left hooks, but we think that the suggested solution, which involves road narrowing and a raised junction to slow motor vehicles, is the best option.
Please feed your comments to us via the threads on this issue, or by email to john@camdencyclists.org.uk
Our response needs to be in by 3rd October so we'll take comments on board until the 28th.
Created by Tom B // 2 threads
Previously, there was an Advanced Stop Line on Kew Gardens Road (B353) where it joins Kew Road (A307). The junction was recently resurfaced, which removed the ASL markings, and they have not been replaced. I have attached a Google Streetview photo showing the ASL that was previously present.
The ASL marking was very useful, as the junction can become gridlocked in rush hour, so that only cycles can take advantage of the green signal from Kew Gardens Road without blocking the junction. Cyclists therefore need the space to be able to safely wait at the front of the queue.
It would be great if the ASL markings could be restored as soon as possible. If they have been removed for a reason, then I would like to understand what the justification is.
Created by George Coulouris // 4 threads
Full details of the consultation are at:
https://consultations.tfl.gov.uk/cycling/northsouth
closing date for comments is 19 October 2014.
Camden Cyclists we propose to send a response to this consultation on behalf of our members. This will focus only on the part within Camden (the section between Charterhouse Street and Euston Road - as detailed on the map attached). But note that the alignment of the route north of Greville Street is not agreed between Camden and TfL and is not formally considered a part of the consultation.
So it makes sense to have two discussion threads for the sections in Camden south and north of Greville Street.
Created by James Gilbert // 1 thread
The Astra Zeneca developers (I assume) have installed a chicane made from two plastic roadwork blocks, plus a little "Chicane Ahead" warning sign on the down slope of the guided busway path as it approaches Francis Crick Avenue.
I assume that the idea is to slow down cyclists, but I don't see why this is any more necessary than it was before their building site was created. I think it will make collisions between cyclists, or between cyclists and pedestrians, more likely.
Created by Clive // 1 thread
Herts County Council proposal to make currently two-way Vicarage Road a one-way street between j/w Scammell Way and Hagden Lane and provide a ''kiss and drop'' lay-by in Scammell Way. The one-way section will be for northbound traffic only (ie travelling towards the town centre).
For further details see:
http://www.watfordobserver.co.uk/news/11422333.Plans_to_make_part_of_Vicarage_Road_one_way_and_bring_in_parking_scheme_branded__ill_conceived__and_a_safety_risk/
Herts County Council will have a display at Watford Cycle Hub
====date and time to be confirmed====
Place: Watford Cycle Hub
The Pavilion
Chaffinch Lane
Watford
WD18 9QD
Map: http://www.openstreetmap.org/?mlat=51.6428&mlon=-0.4165#map=14/51.6428/-0.4165&layers=C
Created by David Butler // 1 thread
Salford Council/Urban Vision consultation on CCAG scheme. "The proposed cycle improvement between Station Road in Irlam and Astley Road in Cadishead will enable better sharing of the road space by all users and improve conditions for cyclists and pedestrians. Cycle parking facilities will be provided and cycle symbols on the road will be marked to highlight the presence of cyclists. Line markings and the construction of build outs and central reserves are proposed to narrow the road and reduce the overall speed of vehicles"
Created by David Butler // 1 thread
Salford Council/Urban Vision consultation on this CCAG scheme. "A new cycle lane will be implemented along Liverpool Street between Langworthy Road and Cross Lane, linking the neighbouring residential areas to employment and educational opportunities at Salford Quays, MediaCityUK, the University of Salford and Manchester City Centre"
Created by David Butler // 1 thread
Salford Council/Urban Vision consultation on CCAG funded scheme. "This route will provide new cycling facilities on Silk Street and North George Street, linking route one to the University of Salford and improving onward cycling links to Salford Quays and the regional centre, through the existing wider cycle network."
Created by David Butler // 1 thread
Consultation by Salford Council/Urban Vision on CCAG funded scheme. "This will provide a new cycle lane along the length of Great Clowes Street and Blackfriars Road, which will link the residential area of Broughton to Manchester city centre. Where possible the route will be segregated from traffic"
Created by David Butler // 1 thread
Consultation about cycling in Lyme Park, carried out by the National Turst
Created by David Butler // 1 thread
New cinema and car park next to Debenhams in Stockport centre. New open space on Bridgefield Street and Prince's Street. One of the objectives is "to provide enhanced public transport routes,cycle facilities and pedestrian access". Issues: cycle parking, shared space, link to wider cycle network.
Created by David Earl // 1 thread
This bus gate is a continuing problem. We first raised this when it was first installed in 2007. The problem hasn't gone away.
http://www.camcycle.org.uk/newsletters/70/article6.html
Created by George Coulouris // 1 thread
You probably remember that we began a new 'Quick Wins' campaign in November 2013.
http://camdencyclists.org.uk/camden/campaigns/quick-wins
I asked members for their suggestions for (very) minor improvements throughout the borough that will make cyclists feel better catered for. These are examples of the type of changes that Camden felt could be implemented without consultation of local residents/businesses:
⁃ dropped kerbs
⁃ obstructive barriers (i.e. anti-motor cycle barriers)
⁃ stretches of poor road surface
⁃ Feeders into ASLs that are too short or non-mandatory
The response from members was very good and we were able to assemble a list of suggestions and submit it to Camden in November 2013. Camden responded by assigning an officer to work on the entire list and he has worked hard to progress them.
The web page linked above includes a table showing the list of 17 suggestions that were submitted to Camden, updated to show the five suggestions that we know for sure to have been completed (those table entries are in italic with completion date and a photo). There may be one or two other items in the list that have been completed - I haven't been to check all of them recently ;-) I would be very grateful to anyone who can give me up-to-date information on the status of the other items.
Several other minor changes that we have suggested, outside the 'Quick Wins' list have also been completed this year.
As far as I know Camden still intend to progress most of the remaining items. It is worth noting that some of these relatively minor changes received significant 'push-back' from locals, making the process slower and more expensive than it might have been.
We and Camden are still very positive about this campaign. Camden are now asking us for a set of 'Phase 2' suggestions. The criteria for this are likely to include the types of changes suggested in the first phase but also include some new ones.
We are still clarifying with Camden the new categories that can be classified as 'quick wins' (i.e. can be implemented without consultation). They may include:
⁃ widening cycle lanes or converting them to mandatory (i.e. replacing a dashed with a solid white line). In some cases this might be a first step towards installing lightweight segregation.
⁃ widening existing cycle lanes where there is limited traffic impact.
⁃ widening bus lanes to 4.5m to allow safer overtaking of buses by cycles and vice-versa.
⁃ adding cycle lanes that link up sections of bus lane.
⁃ trial lane closures to provide better space for cycling.
⁃ more 2-way cycling on side roads.
I would be grateful for your feedback, commenting on the categories of changes or preliminary suggestions for actual changes.
I plan to construct a new list for submission to Camden in October, but I would be grateful for concrete suggestions by mid-September.
It helps if you can provide a link to the relevant location on Google maps. A photo is even more helpful.
George C.
Between the A10 cycleway and the Hardwick Road cycleway is a complex of sluggish crossings, narrow tracks and dangerous junctions which currently (early 2014) take 7 minutes if you wait for all the crossings. Of course, the red bike lights are only advisory, but then riders and drivers are hindered by the poor visibility at many of the crossings, plus some drivers mistakenly believe that riders should dismount and walk across, to the point of harassing riders who ride across.
Unsurprisingly, some commuters riding through this junction have developed a number of innovative and, eh, "interesting" approaches to it. This shouldn't be necessary. This junction between the Highways Agency's A47 and Norfolk County Council's A10 and A149 should be cycle-proofed as a high priority, before the planned housing at West Winch and North Runcton.
Created by MJR // 2 threads
The Parish Council have prepared the plan with the help of local residents, businesses and interest groups. A draft was prepared in February 2014 for consultation locally and with statutory bodies. When fully approved, it will take the place of many North Somerset Council planning policies which cover Long Ashton Parish. It will contain policies to:-
· protect areas of Local Green Space from development
· protect the open countryside between Long Ashton and Bristol
· protect and improve recreation and community facilities
· support the shops, services and businesses within the village
· reduce traffic speeds through the village and make it a more pedestrian friendly environment.
North Somerset Council http://www.n-somerset.gov.uk is currently preparing an Employment-Led Delivery at Weston-super-Mare Supplementary Planning Document(SPD). The SPD provides guidance on how the Council applies Core Strategy policy CS20 Supporting a Successful Economy.
Created by Rohan Wilson // 1 thread
Bike Bus Explorer tows a 30-bike(?) trailer. Picks/drops bikes at Cambridge Station, Brooklands Avenue, Barton Rd then a linear route to Wimpole, and a ring from Arrington via Hatley, Gamlingay, Gransdens, Longstowe.
It leaves the station Sunday and Bank Holidays at 09:00, 11:30, 14:30, 17:00. Last return to Cambridge arrives 19:12.
A leaflet gives info about the rural destinations including Wildlife Trust sites, and a map showing the bus route, stops and suggested rural cycle rides. Operations exclude Christmas Day, Boxing Day, New Year's Day, suggesting it operates all year.
Created by Stefan Kaye // 1 thread
For several weeks now, ever since part of the surface of the path was repaired, the cycle detector loops at the crossing of Maids Causeway from Midusummer Common to Fair Street have not been working. This means that cyclists using the crossing have stop and press the button unless the road is already completely clear. Does anyone know any more about this problem, and to whom should a complaint be addressed?
Created by Hester Wells // 3 threads
The Papworth Hospital is moving to Addenbrooke's.
There is a public consultation until 26th August 2014, ahead of a planning application in September.
http://www.papworthhospital.nhs.uk/content.php?/about/new_papworth_hospital/public_consultation
Created by Rohan Wilson // 0 threads
3-floors block 15 flats hidden rear of industrial building behind Aldi.
Nominally car-free (ie provides no on-site car parking beyond one space for disabled) but the flimsy Transport Assessment (Conclusions 5.5) says "....surveys on existing on-street parking on local routes have identified some capacity for additional parking demand generated by the development, should residents at the development choose to own a vehicle." This acts against the (so far undelivered) scheme to eliminate car parking on Histon Road and instal cycle lanes. There is space in front of the industrial shed, and "parking" appears there on the site plan.
This seems to be a re-application, developer suggests the only issue left to be resolved is (personal) security on the remote access route. However the police ALO doesn't like it.
Car-free: interesting, but this instance looks very dodgy.
The TA instances other Cambridge "car-free" flat developments - do they really work?
Created by Rohan Wilson // 1 thread
Quote: para 2.77 "The Government supports the motorist and wants to see adequate parking provision for them...."
Question 2.16: Do you agree that parking policy should be strengthened to tackle on-street parking problems by restricting powers to set maximum parking standards?
Not a simple issue, but probably worth CCyC's commenting.
Created by MJR // 1 thread
This junction is very important for desire lines to/from the College of West Anglia, but is largely bypassed by through cycle traffic (by some mix of NCN1, the cycle gate into King George V Avenue and routes through North End). It is very busy with motor traffic.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by Elizabeth E. // 1 thread
TfL are making changes to junction because of safety issues.
For Cyclists:
Two-stage right turns at the junction in the west to south and east to north directions
An early release at the traffic lights on all four arms of the junction
Deeper Advanced Stop Lines (ASLs)
Mandatory cycle lane on Camberwell Church Street westbound approach to operate at all times
St Giles bus stop moved further west from the Vicarage Grove junction to improve safety of left turning cyclists on the LCN 23 cycle route
Resurfacing throughout the junction.
Retention of the 20mph speed limit at the junction and on all the approaches.
Created by Andrea // 1 thread
Remove left-turn priority filter: if you want to cycle to the station from Stoke Park Drive, you currently get a lot of stress from drivers honking at you from behind
Created by Jean Dollimore // 1 thread
Camden is consulting on improving safety for pedestrians in the vicinity of Hampstead School in Westbere Road.
See StreetView from Lichfield Road (Barnet) towards Westbere Road Camden showing Hampstead School on the left and the 20 mph sign
Created by jpennycook // 1 thread
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Kate Ravilious // 2 threads
The Fishergate Gyratory is a complete nightmare for all cyclists and very dangerous. Crossing the lanes of the busy dual carriage-way is dangerous and drivers show little awareness or patience with cyclists. The entire junction needs rethinking.
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Created by North Devon Cycling Forum // 0 threads
Change of Road lay out on Long Bridge; NO new centre road line when road is due resurfacing and long term research into "shared space" alternative road surface
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by jpennycook // 1 thread
Erection of Class A1 and Class A3/A5 units. Provision of highway works and alterations to access; parking; landscaping; service infrastructure; and associated works and improvements.
St Michaels Retail Park The Harrow Way Basingstoke Hampshire
Basingstoke
Application reference : 16/04208/FUL
NCN45 across Peckforton Hill at risk of being closed
Created by Simon B // 1 thread
Adjacent to existing apartments on Sealand Road near the Cop is a new development currently under construction by Watkins Homes Ltd. Curently there is a barriered-off ramped access to Sealand Road to cross the Canal entrance to the river that leads around the exisiting apartments. This was originally envisaged as part of a continuous shared use riverside route.
The development of the site offers the opportunity to ensure that shared use access can be maintained, developed and improved along the riverside route that skirts the perimiter of the Racecourse and continues to the River Dee path that leads to Garden City and Queensferry. This could be before residents purchase properties who could well be resistant to a pathway near their new homes.
Whilst the access to the River Dee from the Shropshire Union Canal presents a barrier to a straightforward continuation of the riverside route to join the River Dee shared use path into Wales, the creation of a small extension around the permiter of the new development under construction would mean that an attractive continuous offroad route could be created with minimal additional works (widening of the existing footway for approximately 100mtrs).
It would be helpful to gather thoughts and ideas before the developers and Planning and Highways Department of the Local Authority are approached about this opportunity
Created by Roxanne (CEO) // 0 threads
Plans are emerging for development on the Coldham's Lane site with implications for the surrounding area including links with Cherry Hinton.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Simon Nuttall // 3 threads
London Cycling Campaign's Space for Cycling campaign
Has a clear message - what can we learn from them?