21/04396: 3bed dwelling, 24 Elfleda Road
21/04396/FUL | Erection of one three-bedroom dwelling with associated access, parking and landscaping. | 24 Elfleda Road Cambridge Cambridgeshire CB5 8LZ
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/04396/FUL | Erection of one three-bedroom dwelling with associated access, parking and landscaping. | 24 Elfleda Road Cambridge Cambridgeshire CB5 8LZ
Created by Steven Moseley // 1 thread
Land Adjacent Hospytts, The Causeway, Great Horkesley CO6 4AD
Created by Steven Moseley // 1 thread
Proposal for 9 dwellings consisting of 4 x 3 bed houses and 4 x 2 bed apartments and 1 x 1 bed apartment.
Created by Steven Moseley // 1 thread
Demolition of existing Rugby clubhouse and erection of a new two storey community centre with associated parking and landscaping.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A new thread for discussions related to the Cambridgeshire and Peterborough Combined Authority, the strategic transport authority for our region.
Change of use from agricultural land for the construction of an A10 bridge structure with associated earthworks embankment bridge landing, construction of a shared use route for non-motorised users between the Waterbeach Barracks site and Green End including a 3m shared footway cycleway and 2m grassed verge for equestrians and 1m grassed verge, hard and soft landscaping, lighting, construction compound and temporary haul roads
Land Between Green End And The Waterbeach Barracks Site Waterbeach Cambridge Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 21/04625/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Transport in the March area (March North and Waldersley, March South and Rural, Whittlesey South) has been under review.
sound+fury // 1 thread
Part demolition of the existing Romsey Labour Club building with retention of the BLI historic frontage and erection of 44no. serviced apartments (sui generis use class) along with a cafe, gymnasium, community space, and associated infrastructure and landscaping.
Romsey Labour Club Mill Road Cambridge CB1 3NL
Cambridge
Application reference : 21/04559/FUL
Created by Steven Moseley // 1 thread
Outline planning application for 30 dwellings and 1ha of public open space and access from Newbarn Road. Some matters reserved.
Created by Steven Moseley // 1 thread
Demolition of existing dwelling and its replacement with a new dwelling
The existing mini-roundabouts are relatively easy to navigate for confident cyclists only. Any future segregated route along Berechurch Hall Road will require improvements.
Created by Steven Moseley // 1 thread
This junction is fast, dangerous, and over-complicated. It should be improved to better handle the current and future traffic, and cycle and pedestrian movements.
CBC cycling SPD route no. 9 (bidirectional segregated) along Berechurch Hall Road between Layer Rd. and Garrison path at junction with Berechurch Rd. should be provided.
Created by Steven Moseley // 1 thread
Created by Steven Moseley // 1 thread
The barrier should be removed (8.3)
The white line (6.5.2-3) segregated ~1.5m wide bidirectional cycleway (Table 5-2 & 5-3) along Baronswood Way (CW) doesn't comply with LTN 1/20.
The width should be increased to the recommended unconstrained minimum of 3m, and demarcation should be improved from the obsolete white line.
The white line (6.5.2-3) segregated ~1.5m wide bidirectional cycleway (Table 5-2 & 5-3) along Camulodunum Way (CW) is obstructed by lamp columns. As such it doesn't comply with LTN 1/20.
The width should be increased to the recommended unconstrained minimum of 3m, proper allowance should be made for the lamp columns (or they should be moved), and demarcation should be improved from the obsolete white line.
Created by Steven Moseley // 1 thread
Berechurch Hall Road is a busy road that is becoming increasingly residential West of the junction with Berechurch Road (J1). The speed limit has been reduced from 40mph to 30mph, except for a section of 40mph East of J1.
To improve safety for pedestrians, cyclists, and motorists, the current speed limits should be reduced by 10mph (Fig 4.1) and traffic lanes correspondingly narrowed (7.2.5-7).
Created by Steven Moseley // 1 thread
The sub-LTN 1/20 white line (6.5.2-3) segregated bidirectional cycleway (Table 5-2 & 5-3) along Camulodunum Way (CW) and Baronswood Way (BW) are not connected, leaving unconfident cyclists travelling North/South along CW via the toucan crossing from the new development 202025 unable to continue North to the Town Centre, as advertised in planning documents.
The gap could be easily filled to the existing standard on CW/BW via footway conversion.
Created by Jean Dollimore // 1 thread
Camden is consulting on making permanent the trial scheme put in during summer 2020:
They also propose the following new measures
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from a small HMO (use class C4) to a 9 bed large house in multiple occupation (use class sui generis).
49 College Fields Cambridge Cambridgeshire CB4 1YZ
Cambridge
Application reference : 21/04425/FUL
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A new thread to highlight issues in and around Huntingdon which we may wish to engage with / support our partners with.
Created by Steven Moseley // 1 thread
Outline application for erection of 3 bedroom two storey house on garden of 22 Valentines Drive.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
The cycle lane on Billacombe Road is unusable due to car parking in it.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Rhian // 1 thread
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Natalie G // 1 thread
The proposals for this route along Whiston Road include:
Removing some of the existing speed cushions and replacing them with raised carriageway
tables. These speed tables will be raised to footway level to provide a traffic calming feature
to assist in reducing the speed of traffic along Whiston Road, making it a safer environment for
pedestrians, cyclists and drivers.
Please let us have your comments before 17 October 2016 so that we can draft a group response.
thanks
Natalie
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by Paul L // 0 threads
longer than Kew Rd and any traffic can be obstructive in narrow roads.
Toucan crossings of A316, Kew Road and Mortlake Rd.
Is rat running a problem ?
Created by Cllr Ian Manning // 2 threads
I've long thought the Green End Road area, specifically the section closest to Milton Road, is prime territory for a big reallocation of space, with segregated cycleways, pavements and a narrowed road.
There is a *small possibility* of including an ambitious plan for this in the station project.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Created by Kevin Ablitt // 1 thread
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.