Crossing Cove Road
At certain times of day it is difficult to cross the road and connect the cycle and pedestrian routes between Southwood and the Cove Brook Greenway
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Sarah Wood // 0 threads
At certain times of day it is difficult to cross the road and connect the cycle and pedestrian routes between Southwood and the Cove Brook Greenway
The Greater Anglia franchise is due for renewal in October 2016 and the process has already started. It is quite unsusal to have a station serving such a large number of passengers with access on only one side o the tracks. This situation leads to many more and longer car journeys along Mill Road, Cherry Hinton Road and Hills Road.
There is an existing access via (non-residential) Clifton Road to the east side of the station and there is vacant land. We need to argue the case for an eastern entrance to the station, along with cycle parking and pedestrian access. There is a mainly empty car park on the other side of the tracks. We should also try to include a link from the Carter bridge to the new cycle park.
Interested parties
3 shortlisted franchises
local MPs
Minister responsible (Clare Perry MP)
Created by Jon G // 1 thread
The road outside the Barmy Arms pub, Twickenham Embankment, used to be closed to motor traffic by a single line of posts with cycle logos painted on the road between two of these, clearly showing there is a cycle route there.
Recently this has been replaced with two lines of posts about 3m apart and there are no cycle route markers. This is leading pedestrians to reasonably assume that the area between the posts is for pedestrians only and to stand there in groups with drinks from the pub, creating conflicts with cyclists trying to ride through the area. The existence of the cycle route should once again be indicated by signs or painted cycle symbols.
Created by Jon G // 1 thread
The Embankment, Twickenham is a two-way street. Many driver sseem to think it is one-way Westbound. Even the Cyclescape map wrongly marks it as one-way! It needs signage clarifying it is two-way, to avoid motorists being obstructive or abusive to cyclists lawfully riding Eastward along it.
Created by Jon G // 1 thread
Bell Lane is two-way. Most drivers using it go Northward and many seem to think it is one-way that way. It needs signage clarifying it is two-way, to avoid motorists being obstructive or abusive to cyclists lawfully riding South along it.
Created by Jon G // 1 thread
Cricket Lane is a dead end and therefore two-way. Since an exit from a car park was built leading into it, many drivers seem to think it is a one-way street from the car park. In fact it is used by cyclists going in both directions between High St and Bushy Park.
It needs signs clarifying that it is two-way, as drivers are being obstructive or abusive to cyclists legitimately using it.
Created by David K // 1 thread
At present this is a footpath but it could be widened onto the land owned by Network Rail in order to allow a shared use path.
Created by Richard Taylor // 1 thread
Proposal for three new pedestrian and cycle access points to Cambridge Business Park. The proposals are being made in light of the plans for an new station nearby.
Representations from companies with premises on the business park - Redgate and Autonomy - have expressed concerns about security and the potential for people to try and park on the business park and then get on a train.
The proposals are for the new accesses to be gated to restrict general public access.
The proposals include a connection to the potential cycleway along the line of the disused railway.
Cambridge Business Park Cowley Road Cambridge Cambridgeshire CB4 0WZ
Cambridge
Application reference: 15/0919/FUL
Created by Violinist John // 1 thread
Noticed this a couple of weeks ago. As you will see the sign is incomplete and misleading given that the place to see all the details is the end of Ferry Lane waiting to join High Street. High Street at this point is both Route 51 and Route 11.
Major points:
Left turn to go to Impington on Route 51 - I think not.
Abbey and Fen Ditton to the left when you could just go back across Green Dragon bridge.
No directions to Histon, Milton, Waterbeach probably others.
Also the lack of any idea where route 11 goes to the right.
This appears to be one of a number of new signs that have recently appeared. If anyone has seen any more let's get the info out there and try to get them fixed.
Created by Iain Lane // 1 thread
Some new lamp posts have been installed on the pedestrian side of this split ped/cycle path. This reduces the effective width of the path and creates conflict.
Created by Katja Leyendecker // 0 threads
Council is planning changes on parts of Heaton Road
http://www.newcastle.gov.uk/parking-roads-and-transport/cycling/strategic-cycle-routes/improvements-heaton-road
Discuss your thoughts and ideas here!
Created by Roxanne (CEO) // 3 threads
Relocation of the existing liquid nitrogen (LN2) tank, Denios unit and cycle parking facilities.
Department Of Chemistry Lensfield Road Cambridge Cambridgeshire CB2 1EW
Cambridge
Application reference: 15/0988/FUL
NOTE:
Introduction of two tiered cycle parking to maintain the same number of parking spaces.
Richard G // 1 thread
A new research institute is planned for the Addenbrookes campus, plans are due to be submitted within a few weeks
There has been a exhibition of the overall plan & I have concerns about the cycle parking provision
Just wanted to report a collision on 1/6/15 at about 1700 between myself and a car in Cambridge.
Travelling South on Trumpington Road, turning into Fens Causeway I was hit by a car travelling North at the roundabout. There are three lanes of traffic heading north, the outmost car gave way correctly but the car in the second lane for whatever reason chose to accelerate onto the roundabout and hit me square on. I heard the noise of a revving engine, turned and watched the car drive straight into me. I felt the bonnet of the car as it hit and heard the sound of the impact, have a vague recollection about spinning through the air then hitting the tarmac. Although I was wearing a helmet it didn't help as I landed on my right buttock, back and leg.
Fortunately there were several witnesses including medically trained people who left their cars to help; the driver of the car involved remained in his car.
The police took about 25 minutes to arrive and the ambulance about 10 minutes after that.
I have nothing but praise for everyone who stopped and helped, the police, the paramedics and the A&E staff at Addenbrookes. The driver of the car knows what I think of him as I was quite vocal when he tried to get involved. He apparently told the police that I had 'cut the corner' of the roundabout. I'm not sure what he meant by this, nor was the police officer.
I count myself very lucky. Although I've been off work since the collision, I have no broken bones - just serious bruising, a lot of pain in my back and hip which I'm assuming will go away eventually. The ironic thing is that I'd been cycling from Melbourn to Hills Road since the previous week up and down the A10, and had decided to try a different route over Chapel Hill as I thought it might be safer.
I'm curious though, does this junction not have a history of collisions? I can recall seeing at least one there myself in the past. What is the recommended route for cyclists travelling this route?
I took the advice of the Campaign website and contacted Cycleaid for legal advice. I'll report back the outcome as things progress if anyone is interested.
BTW not sure how to draw a route on the map AND mark the collision point, so I've just done the latter.
By-election for the Romsey Division in June 2015
Martin Lucas-Smith // 1 thread
The University has published initial plans for a Masterplan for the West Cambridge site, which will see further extension towards the M11.
https://www.admin.cam.ac.uk/reporter/2014-15/weekly/6387/section6.shtml#heading2-11
Created by Robin Heydon // 1 thread
Extension to foodstore
ALDI Unit 1 157 Histon Road Cambridge Cambridgeshire CB4 3JD
Cambridge
Application reference: 15/0914/FUL
Created by Shaun McDonald // 1 thread
There is a footpath linking London Road to Columbine Gardens and Lupin Road, which has a series of barriers. Removing the barriers, ensuring there are dropped kerbs are on Columbine Gardens and Cowslip Close. Signs need to be added to sign post the route to the town centre, London Road, and appropriate other places.
This would mean that there would be direct link from Chantry on to London Road and into town along a potentially safer route than Gippeswk Avenue/Birkfield Drive.
Created by Rosie Downes // 1 thread
First consultation on the main scheme: 26 May to 31 July 2015
Second consultation on amendments to the scheme: 22 February to 20 March 2016
Created by Shaun McDonald // 1 thread
The A92 here has some very fast traffic. Considering this is the flagship National Cycle Route 1, and there is already a cycle path of part of the way between these 2 junctions. It would be much better if this cycle path was continued to the next junction, with some crossing aid in the form of traffic lights, bridge or tunnel. This would open this part of the route to a wider range of participants, as it would be significantly safer.
Created by Al Storer // 2 threads
The County Council have launched an initial consultation on improvements to Queen Edith's Way and Cherry Hinton Road (Hills Road to Mowbray Road). Very positively, what they're asking about is separated cycling facilities and bus stop bypasses. The devil will be in the detail as always, but the principle is good
http://www.cambridgeshire.gov.uk/site/custom_scripts/cons_details.aspx?ref=367
Created by Ross // 1 thread
Richmond Hiil and Ormond Road provide direct routes into Richmond town centre. However they are one way and force cyclists to take detours to get into town. Making these roads 2 way for cycling with contraflow cycle lanes would improve movement for cycles and remove some conflict which exists where cyclists ride on the pavement.
Created by Ross // 1 thread
Cycling around Richmond town centre is tortuous on a bicycle due to the one way system. To encourage even greater cycling journeys to Richmond town centre business the one way system should be redesigned to allow 2 way cycling for bicycles on Eton Street, Paradise Road and George Street. Ideally this should be achieved with segregated cycle contraflows
Created by Ross // 1 thread
Make Priests Bridge in Barnes - 2 way for cycling. Facilitate easier and shorter cycle journeys and link more effectively into LCN 37 and 4. Encourage cycle traffic of the busy A205.
Created by Rohan Wilson // 1 thread
Sustrans invites comments by 30 June on its draft chapters of a "Cycle-friendly Design Manual".
This document, once published, could influence local authorities to provide better, safer cycle routes, and so persuade people who are not yet cycling their every day journeys to do so.
Your comments please to designandconstruction@sustrans.org.uk by 30 June.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by North Devon Cycling Forum // 0 threads
Two-way traffic for cyclists on Barbican Terrace-Litchdon Street, allowing to cycle from the Strand to Summerland Street
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by David Butler // 1 thread
Consultation of cycle lanes and junction changes by Manchester City Council
Created by Charlie Halliday // 1 thread
Proposed off-road cycle path following the A323, Norris Hill Road, to link Fleet with the existing cycle-path from Norris Bridge towards the centre of Farnborough.
It would enable cyclists to avoid Norris Hill Road, an unlit road with speed limit of 60 mph. Once built it would be possible to cycle from Fleet to Farnborough without cycling on roads.
This is in the Fleet Town Access Plan ref. PC9
Created by Marcus Howarth // 1 thread
see https://consultations.tfl.gov.uk/trams/sutton-link/?cid=sutton-link
Here's the overview from TFL:
Overview
We are consulting on proposals for a new, direct and quicker transport link between Sutton and Merton. We have called this the Sutton Link.
The Sutton Link would create a high-capacity route for people travelling between Sutton town centre and Merton using zero-emission vehicles. It would connect with other major transport services into central London and across south London, including National Rail, London Underground, existing tram and bus services. It would make journeys by public transport quicker and more attractive, and reduce the need for trips by private car.
Many of the neighbourhoods along the proposed routes have limited public transport options. The Sutton Link would support new homes being built and would improve access to jobs, services, major transport hubs and leisure opportunities across both boroughs and beyond.
Our work is at a stage where we would like to know your views about three potential routes. We are considering a tram or ‘bus rapid transit’ (BRT) for the Sutton Link and would also like to know your views on this.
BRT is similar to a tram but runs on road segregated from traffic where possible, not on rails, and carries fewer people in each vehicle. A full explanation is included below in the section titled ‘About trams and bus rapid transit’.
From LCC -
general principles would be ensure this doesn’t negatively impact cycle routes, that there are good routes to the stations/stops, that any places where cyclists will be crossing tracks are designed carefully with latest materials to avoid tramlining incidents, that the space comes from private car lanes.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Sam Saunders // 0 threads
A twenty metre stretch of advisory cycle lane at the end of Whiteladies Road, from a zebra crossing to its junction with Queens Road, encourages cyclists to take a position near to the curb as they enter the and leave the junction. This puts them exposed to frequent buses turning immediately left into Queens Avenue and in a vulnerable position from which to continue a journey south west towards Park Street or Park Row.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Jean Dollimore // 1 thread
Fleet Road is a one-way street with heavy motor traffic and no protected cycle infrastructure. This means that people cycling through the area face unpleasant interactions with motor vehicles as well as needing to make diversions to reach destinations in the area,
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Residents of Beaumont Square and the surrounding area raised concerns about rat-running and the problems it causes in local streets. You may remember that the Council previously consulted residents on traffic management proposals to reduce traffic speed in the area; many of which were strongly supported and have now been implemented. A number of additional ideas were also put forward by residents which have now been considered and we would appreciate your opinion on whether they should be introduced.
One of the problems is the level of traffic trying to avoid the traffic lights at the A11 Mile End Road/White Horse Lane junction. Drivers cut through either Beaumont Square or Eastbury Terrace through to Beaumont Grove to join A11 Mile End Road junction causing safety concerns, particularly for the nursery and nuisance to local properties. In addition, Beaumont Grove suffers problems relating to parking for surrounding shops and takeaways.