Racks too close to wall
These racks are too close to the wall so you can't actually lean a bicycle against them in a stable way.
Also why only so few in such a central and busy location?
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Stephan Matthiesen // 0 threads
These racks are too close to the wall so you can't actually lean a bicycle against them in a stable way.
Also why only so few in such a central and busy location?
Created by Stephan Matthiesen // 0 threads
Need much more bicycle parking here, also to access Nicolson Street.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Stephan Matthiesen // 0 threads
Cobbles, tarmac patches etc almost impossible to cycle on.
These streets are key connections between centre and the Innocent Path.
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
This road has been left with a hopelessly outmoded junction geometry, with huge radii and a simply breathtaking width. It's so bad that it's not unknown for oncoming vehicles to pass "continental style", because a perfectly reasonable path turning right into the close will take you way over to the right of anyone making a right turn out of the close (note there are no white lines to provide road positioning guidance). This would in fact make a great cycling link from Cob Lane into the park. There is ample room to create a cycle path and a crossing with a central refuge, and make the junction safer and less bizarre for motorists. Instead the city council has elected to take cyclists on an unlit shared path the same width as a bike, across an informal crossing upon which cyclists are instructed to dismount, and along a footpath.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
This path has been built recently as part of the Merritts Brook Greenway walking and cycling route. It would be quite useful were it not narrow, twisty, and covered in loose chippings. As it is, it is all but useless for cycling, so it needs to be rebuilt properly.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Jean Dollimore // 2 threads
N-S Cycle Superhighway consultation
------------------------------------------------------
TfL proposed that the N-S Cycle Superhighway should stop at Greville Street but LCC's response to the consultation stated that the route should continue on Farringdon Road to at least the junction with Calthorpe and Margery Street (under discussion here).
After the consultation TfL replied that they would explore options north of Stonecutter Street(which is actually south of Greville Street!). The N-S Cycle Superhighway may be completed by Spring 2016 but we have no date for it being extended any further north.
Link to our discussion on CycleScape
http://camdencyclists.cyclescape.org/issues/1407-the-tfl-north-south-cycle-superhighway-consultation
=========
Junction Kings Cross Road/Farringdon Road/Calthorpe Street/Margery Street
---------
See consultation on TfL's website at:
https://consultations.tfl.gov.uk/cycling/kings-cross-road
which has a link to their junction plan
Plan to build September 2015
-----------
TfL's proposals include the following:
On Farringdon Road - Grays Inn Road
- right turn pocket for northbound cyclists turning into Margery Street
-1.5 m advisory cycle lane on Kings Cross Road for cyclists travelling southbound with one instead of two motor lanes and on northbound carriageway north of the junction
- footway build outs
Calthorpe Street
- longer ASL and low-level early release signals
- footway build out
Margery Street
- widen contraflow
- longer ASL box and low-level early release signals
Immediate issues:
- no space for cycling on Farringdon Road south of the junction
- northbound approach on Farringdon Road left hook issue
- no attempt to provide protection for cyclists crossing the junction; Farringdon Road is wide enough to put in the infrastructure needed for a separate signal stage for northbound cyclists or for "hold the left turn".
- the early release signals are only as effective as a longer ASl box, not protecting cycles that arrive during the green stage.
Dates: consultation 20 February 2015; reply due 6 April 2015.
Created by Dawes Jaguar // 0 threads
The layout here makes crossing from Victoria Common to St Joseph's Avenue awkward on this proposed cycle route: http://www.pushbikes.org.uk/location/northfield-3. It would benefit from some minor attention.
Created by Dawes Jaguar // 0 threads
This footpath needs to be improved and made shared use for this proposed cycle route segment: http://www.pushbikes.org.uk/location/northfield-3
Created by Dawes Jaguar // 0 threads
This short section of scruffy footpath completes this proposed cycle route segment http://www.pushbikes.org.uk/location/bournville-1 and links it with the Merritts Brook Greenway. Since the path is in such a poor state I would suggest updating it to create a cycle path and footpath, the two being made flush with the existing carriageway.
Created by Dawes Jaguar // 0 threads
This puffin crossing is a barrier to creating a cycle route: http://www.pushbikes.org.uk/location/bournville-1. I've attached a photo, because despite it being a random Google Street View shot it shows there is a demand for cycling.
Created by Dawes Jaguar // 0 threads
The footpaths on the Davids Estate provide permeability for pedestrians, but not cyclists, yet one of them would allow the creation of a quiet route for cyclists: http://www.pushbikes.org.uk/location/bournville-1 (the other just links that route with The Davids). Making the paths shared use to lift a barrier to cycling.
Created by Donald Noble // 0 threads
It would be good to have a dropped kerb near here to allow southeast-bound cyclists who have used the road/bus lane to rejoin the cycle path without having to go onto the A90 slip road to rejoin at Crammond Brig
Created by Dawes Jaguar // 0 threads
Cycling is banned on Victoria Common, but it represents the sort of environment in which people love to cycle. In the short term the paths should be made shared use, but longer term it would be sensible to create cycle paths through the park.
Created by Dawes Jaguar // 0 threads
If this path was made shared use, cyclists could use it to connect the official cycle route on Heath Road South with Northfield town centre via Chatham Road and Rochester Road (there is a toucan crossing that takes cyclists across Church Road).
Created by Dawes Jaguar // 0 threads
Maas Road used to be two way, and was a quiet road upon which cyclists could bypass the motorised traffic that has been allowed to totally dominate Northfield High Street. Then it was turned into a two-lane, one-way rat run, and became a barrier to cycling. It should be restored to two-way for cycling.
Created by Stephan Matthiesen // 1 thread
The entrance is very decorative but has a really narrow corner, so it is difficult to negotiate by bicycle when you've been shopping, and impossible for trailers. There is a desire line (mudpath) next to it, this could be converted to a proper path.
Created by Stephan Matthiesen // 0 threads
The footpath has a very bad surface, and should also be a little bit wider.
Created by Stephan Matthiesen // 1 thread
A walking/cycling connection between Summertrees court and Gilmerton Rd would make the route to the bus stops, to St John Vianney and generally between the two halves of the Inch much shorter, encouraging walking.
Created by Stephan Matthiesen // 0 threads
This path is often quite muddy. It is gravel and resurfaced every year or so.
But it's a very busy walking and cycling connection between Inch and Craigmillar, and the gravel just doesn't last very long.
Not sure what to do. It would be a shame to convert it to tarmac, but perhaps there is some surfacing option that lasts a bit longer.
Created by Stephan Matthiesen // 0 threads
Make dropped kerb where the footpath from Ravenswood Avenue meets the Old Dalkeith Rd. This would make it possible for cyclists on Old Dalkeith Rd to dismount here and walk over to Ravenswood Av.
Created by Dawes Jaguar // 0 threads
A bi-directional cycle path here would link Langleys Road (a quiet road that leads down into Bournville Village and beyond) with Katie Road (another quiet road that links with the BCR route on the Worcester and Birmingham canal). Cyclists would cross Oak Tree Lane using what is currently a puffin crossing (suitably modified to promote sustainable transport). There is a huge amount of space here, currently largely used for pavement car parking.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Jack Thurston // 0 threads
Cycle route 42 along Castle Street requires cyclists to make an absurd off-road detour around the castle grounds and through an industrial estate to rejoin the routes east of the town centre at Holywell Road.
This could be avoided if cycling were allowed in a south-west to north-east direction on Lower Castle Street. Ideally this narrow street should be a walking/cycling only street, or a cycling contraflow could be introduced, though the narrowness of the street makes this a second-best solution.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Starting a thread about this application here so we can continue on from the previous planning list discussion.