21/05423/FUL: new dwelling, land rear of 1 Priory Street
21/05423/FUL
Erection of a new dwelling
Land At Rear Of 1 Priory Street, Cambridge, Cambridgeshire, CB4 3QH
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05423/FUL
Erection of a new dwelling
Land At Rear Of 1 Priory Street, Cambridge, Cambridgeshire, CB4 3QH
Created by Finlay KM // 1 thread
The brook conduit has partially collapsed under the road and the shared-use path. It is currently being repaired (after nearly a year) but the contractors have made use of a very interesting "Cyclists dismount and get an escort" sign. A yellow ramp also makes passing on any non-standard cycle a real challenge. Both of these items are really bad practice and actively discriminate against anyone on a non-standard cycle.
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use of agricultural building to dwellinghouse.
Created by Steven Moseley // 1 thread
Change of Use from Offices to HMO Residential Use
Created by Steven Moseley // 1 thread
Demolition of existing Print Workshop and development of site to provide a replacement print workshop and 5No. residential units with associated vehicle parking and landscaping.
Created by Steven Moseley // 1 thread
Change of use from A1 to C3 to create 4 new 1 bedroom apartments. External repair and decoration. Internal Alternations. Additional Windows and relocation of door to rear elevation. ASHP units to roof top.
Created by Steven Moseley // 1 thread
New Mixed Use Development comprising a convenience store (use Class A1), three flexible use units (Class A1-A5 or Class D1), associated yard and servicing area, parking spaces and landscaping.
Created by catch // 1 thread
New development of 100 homes off the A134 in Horkesley.
https://www.colchester.gov.uk/planning-app-details/?id=442d3ed1-7f61-ec11-8f8f-0022489d9171#ValidationSummaryEntityFormView
Created by Stuart Johnson // 1 thread
Demolition of six retail units part of the Priory Walk Shopping precinct and replacing them with a mixed development of 21 apartments and one retail unit situated on the north side of the junction of Long Wyre Street and Priory Walk.
https://www.colchester.gov.uk/planning-app-details/?id=e10f62af-2c5f-ec11-8f8f-0022489cf2d7
Demolition of a 1960's, 2 storey commercial building on the corner of 14-16 Long Wyre Street and 1-8 Priory Walk and, replacement with 4 storey new building, providing 18 new homes and one commercial unit at ground floor.
https://www.colchester.gov.uk/planning-app-details/?id=1a6462d2-bb5d-ec11-8f8f-0022489cfbff
Conversion and remodelling, including partial demolition, of an existing, Class E, building to form a mixed use development of 37 new,Class C3, self-contained homes and a new Gym Space at Ground Floor.
Created by Michael Robinson // 1 thread
Creating discussion on proposals for Cycleway 9 extension between Brentford and Hounslow town centres.
Hounslow to Brentford walking and cycling changes
We’re proposing to make a series of changes to help people to walk and cycle on Brentford High Street and London Road between Hounslow and Brentford town centres.
We’d like to know your thoughts on our proposals and we are holding a six-week consultation. You can reply by completing our survey, which should take no more than 5-10 minutes to complete.
If you prefer, you can email your comments to haveyoursay@tfl.gov.uk or write to us at FREEPOST TFL HAVE YOUR SAY (Walking and cycling changes between Hounslow and Brentford), no stamp needed.
The closing date for comments is 16 February 2022.
Summary of changes
We’ve described the changes in more detail but in summary we are proposing to make the following changes:
Created by Steven Moseley // 1 thread
Change of use from Sui-Generis (current police station) to residentialcare home (use class C2) Also addition of single front entrance porch/extension
Supplement to housing development application entitled 'Provision of a shared cycleway/footway west onto Ness Road, landscape, drainage, and associated infrastructure of previously approved 15/01175/OUM'
East Cambridgeshire Planning application reference : 21/01771/FUL
Burwell is not in Ely Cycling Campaign's remit but will be important to some Camcycle members.
The proposed infrastructure looks very good in these plans. The Council wouldn't dare require barriers on it because it is intended as a route for emergency vehicles. The rising bollards don't look to be too much of a problem, as long as they can be seen in poor visibility conditions -the plans includes lighting for the route but it might be good for the bollards to include reflective and fluorescent markings.
There already is a dropped kerb at the northwest end of the route (junction with Ness Road).
The plans include the 'Cyclists Dismount' sign for those emerging onto Ness Road.
Created by Steven Moseley // 1 thread
Replacement of bridge and associated highways works involving realignment, junction improvements and width increase of the carriageway.
(CBC version)
Created by Billboyheritagesurvey // 1 thread
The new active travel route is due to open very soon. What needs fixing?
sound+fury // 1 thread
It's a hefty application that will need careful study.
Created by Steven Moseley // 1 thread
Construction of a 3 Bed, Two-Storey, Detached dwelling with garage andassociated parking. Movement of the existing pathway
Created by John Chamberlain // 1 thread
In September 2020, Camden Council put in a segregated southbound cycle track on St Pancras Way under Covid-19 Safe Travel regulations. It was done under an Experimental Traffic Order and they are now consulting on making it permanent or removing it. Details in the attached thread.
Created by Steven Moseley // 1 thread
Convert the existing eight bedsits within an HMO into three separate two-bedroom flats.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cross-party group
Active since 18 May 2021
Westminster is consulting on changes to Maida Hill Market (Harrow Road, Walterton Road). The proposed changes to cycling are limited but it looks from the design that cyclist would lose permeability to Fernhead road.
https://harrowroad.org/assets/Uploads/engagement/211127-Stage-3-Public-Engagement-Boards_MHM.pdf
Created by Steven Moseley // 1 thread
Outline application for 1no. new dwelling.
Created by Steven Moseley // 1 thread
Outline planning application for the development of up to 150 dwellings (including 30% affordable housing) with public open space, landscaping, sustainable drainage system (SuDS) and vehicular access points from Halstead Road and Fiddlers Hill. All ma
Created by Steven Moseley // 1 thread
Demolition of Mercury House and Food @ the Mercury Restaurant; fellingof selected trees; construction of 2-3 storey production block; construction of two-storey extension on northeast corner; infill of porte-cochere to provide internal ground floor acc
Created by catch // 1 thread
Objection to development of land west of Lakelands, off Church Lane / Western Bypass
Response here: https://www.ensembling.com/270062
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."