Safer crossings of Highfield Lane
Safer crossings of Highfield Lane
1. between the two parts of Highfield park and
2. where the cycle route crosses the Lane.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Angela Dyer // 0 threads
Safer crossings of Highfield Lane
1. between the two parts of Highfield park and
2. where the cycle route crosses the Lane.
Created by Angela Dyer // 0 threads
Footway at junction Old London Road/Approach Road/London Road to be made dual-use with dropped kerbs
Created by Angela Dyer // 0 threads
Convert footpath across The Wick to dual use.
Created by Angela Dyer // 0 threads
Yellow lines to discourage parking on Ridgeway on-road cycle lane
Created by Angela Dyer // 0 threads
Cycleway/footway alongside A4147 St Albans to Hemel Hempstead
Created by Angela Dyer // 0 threads
Reduce vegetation to improve visibility on Alban Way between Camp Rd and London Rd. This is particularly an issue where footpath from Vanda Way crosses Alban Way
Provide a link from the Alban Way to hatfield road via the Hatfield road cemetry.
STACC member request May 2011
Created by mike1727 // 0 threads
Contraflow cycle lane on Marlborough Road from Victoria Street to London Road.
STACC member request May 2011.
Provides a connection to Sustrans route 6 and London Road cycle route at the Beehive juntion avoiding Lattimore Road and the Lattimore Road/London road junction.
Created by mike1727 // 0 threads
Provide a ramp alongside the steps to access the York Road railway bridge.
STACC member request from May 2011.
Enables a low traffic E/W link paralleling Hatfield road linking Fleetville to the north of the city centre.
Created by mike1727 // 0 threads
STACC member survey in May 2011 asked that this junction should be changed to allow cycles to use the "buses only" turning into St Michaels coming down Bluehouse Hill.
It provides a useful link from Bluehouse Hill into the Verulalium cycle routes.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Simon Nuttall // 3 threads
The annual university societies' fair is an opportunity to suggest to the student body the existence of the campaign.
Historically we get few students joining, but it can be a useful networking opportunity.
Created by Paul L // 1 thread
Raising and re-surfacing path that we have been complaing about since forever. Pity it isn't wider, doesn't go all the way to Mortlake Brewery and the White Hart has obstructive seating but still worth celebrating.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Created by Jim Chisholm // 5 threads
Issues regarding sharing of space on commons in central Cambridge
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Richard G // 1 thread
At a recent BUG-WAG* meeting, the Trust reported that the council will be modifying the Long Road/Adrian way junction.
Those of you that know the area will know that the exit from Addenbrooke's is 'no right turn' with a small shaped island to direct traffic westbound onto Long Rd
plans were shown to create a cutout in the small island for bikes to exit eastbound. Presuamably with signs to indicate this too
The trust said that suggestions to the junction would be welcome in the planning of further changes to Long Rd
Richard
*BUG-WAG - the Bicycle User Group, Walking Action Group of interested parties on the Addenbrooke's campus
Created by mike1727 // 0 threads
Reported in the Herts Advertiser w/s 30/09/13 http://www.hertsad.co.uk/news/secret_plan_for_new_school_on_harpenden_green_belt_1_2818938
"On Monday, the Herts county council’s (HCC) cabinet agreed to press ahead with the compulsory acquisition of up to 15 hectares of farm land on the corner of Common Lane, off Lower Luton Road."
"The acquisition would provide a development site for a new school with a capacity of six to eight forms of entry." <...>
"Cllr Chris Hayward, cabinet member for education, said if a decision is made to build on the site, it would go through a full planning application."
The site is on a busy road but close to route 57. Planning should include at least a good link to route 57 as well as more local routes to the north- and possibly off road route next to Lower Luton road.
Created by alpaca // 0 threads
TFL have a consultation open until 18th October 2013.
https://consultations.tfl.gov.uk/streets/tottenham-hale-20mph
Blog posts:
http://cyclelondoncity.blogspot.co.uk/2013/10/something-has-got-to-change-cycling-is.html
http://rachelaldred.org/writing/where-is-the-space-for-cycling-on-broad-lane/
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Heather Coleman // 1 thread
Dropped bike off for service at Grand Arcade and walked to get Uni4 bus from outside Pembroke at around 8.30am today. At least four separate lorries stopped on double yellow lines between Little St Mary's Lane and Fitzwilliam Museum, causing traffic chaos. This is really dangerous for cyclists since even if a cyclist has had the courage to get past the obstruction, or has right of way, drivers just don't seem to see them or think they really are only about six inches wide. This also causes massive traffic hold-ups. Congestion (where there is no mandatory or advisory cycle lane) is generally dangerous for cyclists as it tends to lead to "white lining" or squeezing through gaps. This is a busy cycle route. I'm sure Peterhouse have a back entrance for lorries for example.
Why is loading allowed on double yellow lanes on busy cycle and bus routes during the rush hours? OK, I know there's an alleged loading ban on Hills Road which is rarely, or if ever enforced, but at least there is a ban there. I've highlighted that bit of Trumpington St as road users were having to do a slalom there this morning, but this is a Cambridge-wide problem and I'm sure members can also provide evidence of other examples.
I can't quite believe that certain businesses being allowed to hold up the traffic willy-nilly is good for the Cambridge-wide economy in general.
Do we have a position on this? Should the new Police and Crime Commissioner have a position on this? Should Stagecoach (who probably find it causes them a problem, even though they're not our favourite people) have a position on this? Is there a Chamber of Commerce? What do they think about employees who are late for work or deliveries they are expecting being delayed by these sort of hold-ups?
I have lots of photos which will tell me how long I was standing at the bus stop observing these lorries, which I will unload when I have the means.
There is a short section of the Alban Way where it is significantly narrowed as a result of encroachment from the morissons supermarket dite, leaving a width of no more than 1.5m. To the side the land falls away down to the caravan park road. It could be eaily widened with gabbions on the caravan park road side subject to land ownership and approval.
Created by mike1727 // 1 thread
At the back of Morrisons there is a large tree which obstructs the Alban Way, narrowing an already narrow stretch down to approx 750mm at the tree and causing obstructions.
This tree needs removing asap.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.