Barrières de l'hôpital
Une nouvelle barrière a été installée sur près du garde barrière. On ne peut pas passer à vélo sans mettre le pied à terre et passer sur le trottoir.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Une nouvelle barrière a été installée sur près du garde barrière. On ne peut pas passer à vélo sans mettre le pied à terre et passer sur le trottoir.
Created by MB // 0 threads
Being able to cycle down this road (westwards) to cross Roehamton Lane into Danebury Avenue would be a much safer option than the current one where cyclists have to spend some scary minutes converting from an 'on the pavement' cycle path that is invisible to pedestrians, onto a shared Toucan crossing & then immediately into 4 lanes of fast, heavy & impatient traffic before turning left into the comparative sanctuary of Danebury Avenue.
Alternativley, after the Toucan crossing, an on-the-pavement cycle path could be continued, along the wide pavement (on the south side of Roehampton Lane), & allow a safe left turn into Danebury Avenue.
Created by AdrienFr25 // 0 threads
Les travaux du tramway ont entraîné l'interruption de la continuité cyclable, autrefois excellente, entre l'avenue Mitterrand et le chemin de la Malcombe. Il n'y a aucune raison pour qu'il en soit ainsi et cela doit donc être corrigé.
Martin Lucas-Smith // 2 threads
Proposed demolition of two existing dwelling houses and construction of 12no.flats including land for parking of vehicles in association with the adjacent commercial use at 184 Histon Road | 186-188 Histon Road Cambridge Cambridgeshire CB4 3JP
[Previously reported by Michael Cahn]
Created by Paul L // 0 threads
longer than Kew Rd and any traffic can be obstructive in narrow roads.
Toucan crossings of A316, Kew Road and Mortlake Rd.
Is rat running a problem ?
Created by Paul L // 0 threads
Riverside path - scenic.
Richmond bridge is NOT quiet.
The path is narrow in places and surface sometimes poor. On a Sunday it can be congested with pedestrians. How to signpost - recommended except when fine ?
Created by Paul L // 0 threads
A highly enjoyable if hilly route.
Teddington High St is busy and a 20mph limit would send a good message.
The two level crossings in Vine Rd cause delays
Barnes centre also needs 20 mph .
Created by Paul L // 0 threads
Links the Twickenham - Hampton Wick route with Hampton (Schools)
Toucan crossing of Waldegrave Rd and cycle-able (but marked cyclists dismount) bridge over the railway. A toucan across Wellington Rd was intended but only a pelican installed.
Burtons Rd is a notorious rat-run - needs permiable closure.
New crossing of Uxbridge Rd barely adaquate.
No Cycling on bridge over Longford River.
Created by Paul L // 0 threads
For most of this we have an ideal greenway. There is a busy section of Hampton Hill high street. Possibly use the crossings at Uxbridge Rd for bi-directional track on East side. A section of Park Rd is one way. No facilities in Hampton Wick.
Created by Paul L // 0 threads
This route is a greenway in its western half and does avoid most traffic. There are Toucan crossings of major roads.
Some Twickenham backroads are narrow and through traffic needs discouraging.
Two underpasses in Crane Park are low and narrow.
Created by Paul L // 1 thread
Between Twickenham and Teddington lock the only sensible route involves the main road A310. The cycle lane southbound is narrow and parking is allowed by Radnor Gdns. at weekends. Northbound a bus lane is peak hours only.
Teddington to Hampton Wick uses Broom Road which is busier than ideal. Road closure in middle would help.
Hampton Wick Highstreet lacks cycle protection. Possible diversion to riverside path.
There is an opportunity to have a cycle path, between Tibbets Corner & Wimbledon Village, off the road, parallel to Parkside. A pedestrian path already exists. Parkside is a dangerous road to cycle down at the best of times.
Interestingly, a few intrepid cyclists do use Parkside, and I expect there is a hidden cycling population (including me) that would leave their cars behind & use bikes for their commute along this road if it were a safer journey.
A real opportunity here I think to increase cycling, decrease traffic congestion and move towards the 'Go Dutch' vision that the Mayor of London outlined earlier this year.
Created by Andrew Woodward // 0 threads
The northern section of Wiggins Lane is a one-way street, however this is an important desire-line for cyclists from the centre of Ham heading for Ham House and the river-side paths. Many cyclists already treat this as a contraflow - without the appropriate signage to warn oncoming motorists, this is a dangerous situation - see http://goo.gl/maps/8Bs2d
Created by Andrew Woodward // 1 thread
This street provides the main access way to both Queen’s CE Primary School and Kew College (private school). Because it is currently one-way; anyone wishing to cycle to these schools from the south is forced to cycle north up Leyborne Park, onto the A205 (or the narrow pavement-based cycle path) and then down Cumberland Road. This puts some significant extra distance onto the journey, plus the unpleasantness of cycling alongside the A205. Similarly, for those leaving these schools to travel north, they are forced to travel south for the length of Cumberland Road and then turn back up Leyborne Park – again adding unnecessary distance and effectively making cycling a very inconvenient way of getting to these schools. Streetview: http://goo.gl/maps/33e1R
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by MB // 1 thread
There is a useful but unmarked path from Queen's Road to Richmond Park and through to Sheen. It is used by pedestrians and cyclists & I have never seen it on any map! From Lower Grove Road, it takes you to the park via Bog Gate, or Sheen via Sheen Common.
If it were better marked on maps, better maintained & wider in places, it could form a useful section of Richmond's (paved, segregated, Dutch style?) cycling network.
Created by Sam Saunders // 1 thread
The unusual arrangement at the beginning of this cycle lane in Dighton Street Bristol might lead some road users to take it lightly. It could be that experience of moving or replacing trees with less destructive varieties in suitable containers should be sought from other places. Dighton Street is part of a well-used natural route from east to west near the city centre and efforts to establish serious, continuous and high quality cycle routes on roads like this one could represent very good value for money. Mandatory cycle lanes, once installed, need to be policed.
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Sam Saunders // 1 thread
Vauxhall Bridge between Coronation Road and Cumberland Road has a channel provided for wheeling bicycles on one side of its stepped sections. The channel is so narrow and so close to the railings that a bike can only be wheeled along it at a severe tilt. In addition only one side has a channel so wheeling the bike in the opposite direction has to be done from the wrong side of the bike, making it even more awkward.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by MB // 1 thread
TFL are thinkingof closing this 'rat run' to motor vehicles & have put out a consultation here:
https://consultations.tfl.gov.uk/streets/coleparkroad
They are keeping it open to cyclists - but are proposing (I think) an awkward right- angled turn for cyclists to get in & out of the cul-de-sac. Can we suggest a better layout?
Consultation closes on May 10th 2013
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Paul L // 1 thread
This path is included in the Richmond Cycle Map and leads to a toucan and is a useful link from Hampton to the quietish Lower Hampton Rd towards Sunbury but is marked "No Cycling".
There is little pedestrian traffic but ideally it could be made wider.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Jack Thurston // 0 threads
Cycle route 42 along Castle Street requires cyclists to make an absurd off-road detour around the castle grounds and through an industrial estate to rejoin the routes east of the town centre at Holywell Road.
This could be avoided if cycling were allowed in a south-west to north-east direction on Lower Castle Street. Ideally this narrow street should be a walking/cycling only street, or a cycling contraflow could be introduced, though the narrowness of the street makes this a second-best solution.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Starting a thread about this application here so we can continue on from the previous planning list discussion.