Grey Street
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Created by Jack Thurston // 0 threads
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
See: https://consultations.tfl.gov.uk/streets/kingscross
Deadline: 24 March 2014
Note: the most significant place in this proposal is the Gray's Inn Road/York Way route, where Deep Lee was killed in 2011.
Drop-in sessions: 4 and 11 March 2014
Time: 16:30 – 19:00
Venue: King’s Cross Neighbourhood Centre, 51 Argyle Street
CCC were consulted in advance and do not like the proposals. Our main objections are that these proposals:
1. fail to meet TfL’s own 2005 Cycle Design Standards, on many points,
2. put cyclists on the pavement at an extremely pedestrian-busy junction,
3. fail to narrow the traffic heading into York Way down to one lane early enough. It narrows, already, to one lane once it reaches the bus stops in York Way, so it is perverse not to narrow it before the junction, thus freeing up space for a cycle lane to take cyclists safely through the junction.
We have other more detailed objections which we will post later.
Created by litwardle // 0 threads
The most frustrating part of the journey is when I get to the square. To get to Castle Street you either have to cycle under the bridge. This underpass is far to narrow and has blind entry..It makes a heart racing cycle when someone comes in the opposite direction narrowly avoiding collision! The surface is also very slippery in the wet. The only way to avoid this is by continuing to the T junction at the square and turning left... Ooops No left turn!! Of course, even if you could there is no way to get to castle street without going over the bridge and doubling back! Any improvement here would make a huge difference!
The most frustrating part of the journey is when I get to the square. To get to Castle Street you either have to cycle under the bridge. This underpass is far to narrow and has blind entry..It makes a heart racing cycle when someone comes in the opposite direction narrowly avoiding collision! The surface is also very slippery in the wet. The only way to avoid this is by continuing to the T junction at the square and turning left... Ooops No left turn!! Of course, even if you could there is no way to get to castle street without going over the bridge and doubling back! Any improvement here would make a huge difference!
Created by User 609 (deleted) // 1 thread
It is likely a cycle route will run south from Packington St. I was just thinking how it could be continued north/west crossing Essex Rd, down Gaskin St, crossing Upper St and into Theberton St. At the moment, the main roads get quite busy and present a barrier to cycling.
Assuming Gaskin St can be made two way, I was wandering what the best design would be to make the links on Essex Rd and Upper St safest for cyclists (bearing in mind this would ideally be a quiet route).
Are there best practice examples of similar situations elsewhere?
Thanks
Tom
Created by Shaun McDonald // 2 threads
From 17 February to Wednesday 5 March 2014, Suffolk County Council is seeking your views on proposals for the Nacton Road and Ransomes Way corridor in Ipswich.
A number of major developments have recently been completed in this area, with further development expected in the period leading up to 2026.
Residents and business owners living or working alongside roads that may be affected have been written to individually.
The county council appointed AECOM to carry out a study to identify and assess potential improvement schemes to meet the projected increase in traffic associated with development in this corridor.
The primary objective of the study was to maintain traffic capacity on these key routes whilst also providing enhanced facilities for pedestrians and cyclists and taking the needs of public transport services into account.
An exhibition of proposals will be held at Gainsborough Library in Clapgate Lane (IP3 ORL). Comment cards will be available at the venue to fill out. Alternatively comments can be emailed to Suffolk.LTP@suffolk.gov.uk.
View the study display board information here (PDF, 2.7Mb)
There is also an opportunity to request a comment card and hard copy version of the proposals by calling 01473 265923.
The county council would like to know what you think about the proposals.
Responses must be received no later than Wednesday 5 March 2014.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Remove council's paid car parking (not well used anyhow) whilst retaining residents car parking on the east side, turn car parking space into two-way cycleway. The road might be turned into a one-way, or better still 'residents only' street
Created by Katja Leyendecker // 0 threads
Space for cycling, two-way cycleway, kerb protected
Set aside space for cycling, and protect it by using a kerb. The road is busy as fast, and cycling requires dedicated space.
Necking-down for slower turning speeds and better pedestrian desire lines, clear marking of cycle ways, zebra crossing giving pedestrians priority over turning traffic
New junction into new housing development has cycle path combined with wide pavement, however the nearest drop kerb is 10m up the street into the development for vehicle access and after the pavement has been narrowed. This means the cycle lane is inconvenient for cycles to use and will push them onto the road. It is also inconvenient for other users such as wheelchair and prams especially as is inclined after junction.
Created by Rona471 // 1 thread
HertsCC proposal to create a junction speed table and zebra crossing at the junction of Avenue Road and Lemsford Road. The proposed zebra crossing will be north of the junction. The proposal is part of the Maple School Safer Routes to School project.
This junction is on the route of the Green Ring, where it crosses the railway using the bridge from Jennings Road.
The Avenue Road - Jennings Road link is used by many pedestrians and cyclists going to and from: St Peters Street / Carlisle Avenue (ie NCN6); Morrisons & the Alban Way (ie Green Ring); Verulam School (secondary); High School for Girls (secondary) and Maple School (primary). For cycling the route is great for avoiding Sandpit Lane.
The desire for cycling is that the raised table will provide easier access to the link and make the junction safer for cycling.
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Repaint cycle logos on St Peter's street as they are becoming worn.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Created by Kate // 1 thread
In order to avoid the muddy and sometimes flooded route along the riverside path it is possible to use a tarmac path across Petersham Field. However, at both ends of the field there are kissing gates which mean that larger bikes, bikes with child seats, cargo bikes, double buggies or larger prams as well as wheelchairs are either unable or struggle to get through the gate. The gates create an unappealing obstruction for "normal" bikes too.
I have been told by councillors and council officials that the gates are to keep in the cows which graze for half the year in the field. In Cambridge all the cows grazing on common land are kept in using cattle grids. Why can't this solution be used here?
Created by Andrew Woodward // 1 thread
RCC have requested up to 28 additional cycle parking stands in the vicinity of Kew Gardens station.
Created by HankChief // 0 threads
No dropped kerb to give easy access to/from the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to give easy access to/from the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to give easy access to/from the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to give easy access to/from the East Craigs Path Network.
Created by HankChief // 0 threads
No dropped kerb to give easy access to/from the East Craigs Path Network.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by jpennycook // 1 thread
Owners of Brighton Hill Retail park are preparing a planning application for improvements including a coffee shop in the carpark. this is our opportunity to ask for secure cycle parking for the public and employees.
Created by mikewg // 1 thread
Numerous people responding to the survey experience safety issues with this location. Some comments here:
Town centre around the monument, the cobbles are a night mare and shake you badly, I have had my bike lights shaken off before, and had to save them from being run over. You cannot cycle quickly over the cobbles.
Taunton Town Centre - cobbles & volume of traffic
I go through the centre of town. I have had a couple of accidents on the cobbled surface outside the market house over the years of cycling this route. Both resulted in injuries including concussion, facial injuries requiring stitching, a shoulder and hip injury which required physio and steroid injections to resolve. The second of these happened on a wet day, when I was forced to brake because a bus driver, having seen me coming, decided to pull out in front of me. He was relatively remorseful, but it was an accident that would not have happened if 1, he hadn't taken the decision that a cyclist didn't matter, and 2, the road surface was smoother as the braking action unsteadied me on a rough surface - the fall was inevitable as soon as I touched the brakes really. As a consequence, I now cycle along the back of the market house as I cannot bring myself to cycle across the cobbled road surface.
Cobblestones around parade
High Street; ridiculous cobbled roundabout making town centre very dangerous
Cobbles in front of Market Hall
Cobble stones on roundabout in centre of town feels unsafe and dangerous for cyclists.
COBBLES on the main parade
cobbles in town centre
'cobbles ' Market house - dangerous surface - traffic in a hurry .
Cobbles at Market House roundabout,
Cobbles around Burma Memorial make it impossible to take hand off handlebars to signal and are treacherous at best of times
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by Al Storer // 2 threads
Proposed building will have 3000 employees, 250 car parkign spaces and 900 bike parking spaces
Created by Andrea Bredel // 1 thread
this is one of many cycle lanes here in Ipswich that go on and off the road several times. This is very awkward for cyclists as they need to be very careful when getting back onto the road and most probably confuses drivers as well.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Created by Kevin Ablitt // 1 thread
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A radical idea maybe, but why not close the narrow, one-way, Lower Castle Street to cars and make it two-way for bikes and pedestrians? It would
1) solve the problem of the confusing junction at the bottom end.
2) remove the very complex routing of routes 42&46
3) avoid cyclists cutting though the pedestrian zone and one-way part of cross street when travelling east across town.
Bus/cycle lane lights not sensing cyclists.
Created by John Ackers // 1 thread
Islington Council wants to 'transform Clerkenwell Green into a high-quality public space. To do this we plan to provide more space for people to meet and gather by reducing road space and removing parking'.
Created by Chris Lord // 1 thread
Currently there is no safe cycle route between South Loughton / West Debden and Chigwell School. This safer off-road route could be popular with school children and their parents. At Highwood Lane end the route could connect with Debden via Oakwood Hill and Loughton (Traps Hill) via Alderton Hall Lane north.
* Approx. 1 mile length part on-road and part off-road scheme from London Square (Chigwell) via Grange Farm Lane.
* Section 1: Approx. 1 mile length part on- road (via provision of signage and road markings) and part off-road scheme (a new unlit 3m wide shared cycle route facility) from London Square (Chigwell) via Grange Farm Lane, crossing the River Roding via an existing bridge and on to Highwood Lane.
* Section 2: Provision of an on-road cycling route in both directions along Oakwood Hill, made possible through parking restrictions and removal of the central hatching/wide centrelines.
* Section 3: Provision of an on-road cycling route in both directions along Alderton Hall Lane and Traps Hill, via signage and road markings, and parking restrictions/formalisation where required.
Medium Term
£500,000 (Assumes route is not a PROW and excludes stats diversions)
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by Peter Loader // 0 threads
This proposed Maple Cross to Shepherd Primary School cycle route follows the existing Maple Cross to Rickmansworth route as far as the Long Lane/Eastwick Crescent junction in Mill End.
The new part of the route consists of:
* Part of the new Long Lane residential service road.
* Part of Kenwood Drive.
* Part of the old Long Lane road.
* Rickmansworth Footpath 012 (upgraded to a bridleway).
* Beresford Road.
* Part of Penn Road.
* Part of the south east path through King George V Playing Fields, Mill End.
* The pathway leading to the new pedestrian entrance to Shepherd Primary School, near its cycle parking area.
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by North Devon Cycling Forum // 1 thread
Removal of difficult barrier on cycle path ending on Eastern Avenue; not possible to pass for trikes/tandems/mobility vehicles
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.