S/2347/12/FL Bard Pharma site
Cambridge Science Park though in the northern edge of the city, is administratively in South Cambs.
I propose to attach a thread relating to a new planning application for the Bard Pharma site, northeast corner.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Rohan Wilson // 1 thread
Cambridge Science Park though in the northern edge of the city, is administratively in South Cambs.
I propose to attach a thread relating to a new planning application for the Bard Pharma site, northeast corner.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Shaun McDonald // 1 thread
Further safety improvements at Bow roundabout
Overview
Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions.
Why We Are Consulting
As part of this work, we have developed proposals to further improve safety at Bow roundabout.
What we’re proposing and why
Bow roundabout is a key junction for cyclists travelling between central and east London.
Cycle Early Start
A cycle early-start would operate at the traffic signals on the westbound approach to Bow roundabout.
This would provide a dedicated green light to allow cyclists to wait ahead of other traffic before moving onto the roundabout.
A new mandatory cycle lane on the westbound approach would allow cyclists to get to the roundabout entrance without having to filter through traffic.
The early-start area would be 18 metres deep, so there's a clear space for cyclists in front of any traffic.
This cycle early-start would improve safety, due to the reduced risk of conflict between cyclists travelling straight ahead and vehicles turning left. It would also provide a quick and direct route through the roundabout for cyclists.
The eastbound early-start was completed in June 2012. Our provisional monitoring to date shows that the eastbound early-start has been effective in reducing the left turning conflict risk that it was designed to address. It also shows that the cycle lane on the approach is well-used, with significantly fewer cyclists using the footway than before. We will continue to monitor and analyse the operation of these facilities.
Cycle Bus Stop By-Pass
TfL is proposing to introduce a new cycle lane around the back of the bus stop on the approach to the roundabout to help cyclists get ahead of other traffic and reduce the risk of conflict between cyclists and buses pulling in and out of the bus stop.
To accommodate the new cycle lane, the bus lay by would be filled in so buses would stop on the carriageway instead. .
Please click here to see the map for further information on the proposals.
We continue to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Bow area.
We intend to begin work at the roundabout in January 2013. We’ll write to residents and businesses nearer the time to advise on the timing and impact of construction work.
https://consultations.tfl.gov.uk/betterjunctions/bow_roundabout/consult_view
Created by velocipedus@gmail.com // 12 threads
Resources, opportunities, ideas and opinions about bicycle culture in Cambridge
Created by Rohan Wilson // 2 threads
Next meeting is Thursday 6 Dec at Trumpington Village Hall
(Informal Drop-In 15:30 - 18:30, followed by Forum 19:00 - 20:30)
Though the above page indicates it's about residential developments, Addenbrooke's was covered in a presentation on previous 6 Sep meeting. Bell School was not covered.
The main discussion was around schools and young people.
Created by cobweb // 32 threads
e.g.
https://www.gov.uk/government/news/cash-boost-to-get-england-cycling--2
Govt announces £20 million for cycling infrastructure improvements.
Marshall reveals plan for 1,500 homes
http://www.cambridge-news.co.uk/News/New-plan-for-1500-homes-27112012.htm
Created by George Coulouris // 1 thread
Camden are contemplating a re-design of this junction (the one adjacent to Mornington Cresent Station). We hope to get in early and try to ensure that the junction and its surrounding streets are made as safe and pleasant for cycling as possible.
This CycleScape issue is intended as a forum for discussion of improvements or a total redesign.
Martin Lucas-Smith // 2 threads
There are rumours that the AJC will be scrapped.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jim Chisholm // 5 threads
There is a suggestion of a group looking at issues for those cycling in the A10 corridor between M11 J11 and Royston. This is, in part about cycling along the corridor, but mainly about access between villages and access to rail stations. Of course the A10 north of Cambridge has LSTF money, but there are currently few funds available for improvements in this area.
Created by David Earl // 1 thread
Road closures - but will cycle parking be OK?
Created by velocipedus@gmail.com // 1 thread
Forwarded message:
I noticed that half of the bicycle shelter was fenced off, and I wondered whether we may be getting some new racks. In Connect I read the Trust was considering two tier bike racks so I was half expecting we would get these. Today however I learnt that the area will be transformed into a smoking shelter! Is this true?
I think it is fair to state 30% of the people working in the S-block cycle into work. Losing half of our cycle parking facilities is not very helpful. The area is heavily used and often overflowing with bikes.
If the area will indeed be turned into a smoking shelter, can you please explain why this decision was made and why it was not communicated to the staff concerned?
This is outrageous and a good press story. Robin - are you up for this?
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions. As part of this work, we have developed proposals for further safety improvements at the junction of Battersea Park Road and Havelock Terrace. This follows the introduction of a new signalised pedestrian crossing and cyclist Advanced Stop Line at the junction in June 2012.
Why We Are Consulting
About the proposed changes:
Our review of the current junction layout showed that the two narrow general traffic lanes on Battersea Park Road southbound mean that cyclists are sometimes squeezed towards the kerb by motorists. It also identified conflict between cyclists and motorists merging across lanes when approaching the junction southbound from Battersea Park Road.
Our proposed improvements have been designed to address the above issues. They include:
A new central cycle lane to help cyclists turning right from Battersea Park Road into Prince of Wales Drive. This would mean two lanes of traffic on the southbound approach from Battersea Park Road instead of three. These proposals may mean a slight increase in journey times at busy periods.
One wider southbound general traffic lane on the Battersea Park Road exit instead of two narrow ones. This would reduce the likelihood of cyclists being squeezed against the kerb by motorists
A new traffic island at the junction of Prince of Wales Drive to segregate westbound cyclists and motorists
New sections of eastbound and westbound mandatory cycle lane on Prince of Wales Drive to provide more space for cyclists. The eastbound cycle lane would replace one of the general traffic lanes on the approach to the junction
Widening the existing mandatory cycle lane on Battersea Park Road (northbound) to provide more space for cyclists
Removing the existing yellow box marking from the junction, as the proposed new lane layout would mean it was no longer needed.
Please click here to see the attached map for further information on our proposals. We plan to start work in late December 2012.
How to comment on the proposals:
Please let us know your views completing the online consultation form below by 30 November 2012.
About the Better Junctions programme:
TfL is making it easier and safer for people to cycle in London. As part of this work, we’re meeting with a number of different organisations to review and improve junctions on the Barclays Cycle Superhighways and the Transport for London Road Network (TLRN). We’re planning a variety of improvements, ranging from initial upgrades at some locations, to more substantial and innovative redevelopment at others. Please see www.tfl.gov.uk/betterjunctions for more information.
https://consultations.tfl.gov.uk/betterjunctions/battersea-park
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions. As part of this work, we have developed proposals to improve conditions for pedestrians and cyclists at the junction of Mile End Road and Burdett Road.
Why We Are Consulting
About the proposed changes:
Our review of the current junction layout showed that there is an above average level of collisions involving pedestrians and cyclists coming into conflict with turning vehicles.
The proposed improvements are shown on the attached plan and include:
Removal of the slip roads to reduce the potential for conflict between vehicles and cyclists.
Reducing crossing distances and number of crossings for pedestrians
New mandatory cycle lanes on Mile End Road and Grove Road to allow cyclists easier access to the advanced stop line.
Increased cycle parking around the junction.
Wider traffic islands, new trees and levelled footways.
New street lighting system to be combined with traffic signals to create more space on the footways.
To incorporate the above benefits, we will also need to change the traffic lights operation to allow vehicles to exit Grove Road and Burdett Road at the same time.
Please click here to view the map for further information on our proposals. We plan to begin works in early 2013.
How to comment on the proposals:
Please give us your views by completing the online consultation form below. You can also contact TfL’s Consultation Team at: STengagement@tfl.gov.uk. Please let us know your views by 10 December 2012
About the Better Junctions programme:
TfL is making it easier and safer for people to cycle in London. As part of this work, we’re meeting with a number of different organisations to review and improve junctions on the Barclays Cycle Superhighways and the Transport for London Road Network (TLRN). We’re planning a variety of improvements, ranging from initial upgrades at some locations, to more substantial and innovative redevelopment at others. Please see www.tfl.gov.uk/betterjunctions for more information.
https://consultations.tfl.gov.uk/betterjunctions/mileendburdett
Created by cobweb // 1 thread
An application to extend the cycleways within the West Cambridge site including some shared use paths.
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Peter Loader // 1 thread
Petition to Three Rivers District Council:
“Please would you deliver a programme of safe cycle routes to our schools, using a substantial increase in the cycling budget of the Community Infrastructure Levy.
(This Levy will become payable by developers).”
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Dawes Jaguar // 1 thread
The distance between the cycleway and Vincent Drive is a couple of metres. It is illegal for people to cycle this distance because the connection is via a zebra crossing. This is backed up with a CYCLISTS DISMOUNT sign. This is absurd and needs to be corrected.
There is also an obstructive pavement-mounted tree at this location. There is plenty of space for trees just a couple of metres to the right, so the tree should be removed and a new one planted in the grassy area.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by Simon Redding // 0 threads
The barrier in the photo blocks the route where NCN67 joins Storforth Road at the end of the Rother Washlands in Chesterfield.
Perhaps the council was trying to be safe here, but since it's not a well lit area, a cyclist travelling this way at night might well have a nasty accident flying over this barrier.
Created by acsimpson // 1 thread
The traffic island on Maybury Road at the Maybury Junction is too small to accommodate cyclists (especially those pulling child trailers, etc) other than at it's extreme southern end. As this is a two stage crossing it can lead to either the need to cross when red or wait partly blocking the carriageway.
The light timings need changed to allow a full crossing at once or the island needs to be extended.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Simon Redding // 1 thread
There's no clear desire line or route west of Linacre/Holymoorside to join up to Chatsworth/Baslow/Rowsley/Beeley. This is a clear link to join Chesterfield mainline rail station to the Peak District.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.