Potters Bar to South Mimms research institutes
A possible route from Potters Bar via Dame Alice Owen School, NCN12 at South Mimms, Cancer Research at South Mimms and then on via Blanche Lane to join the existing cycle path alongside the A1.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Adam Edwards // 1 thread
A possible route from Potters Bar via Dame Alice Owen School, NCN12 at South Mimms, Cancer Research at South Mimms and then on via Blanche Lane to join the existing cycle path alongside the A1.
Created by Adam Edwards // 1 thread
Porposed but never built links between the Royal Veterinary College and Potters Bar and Brookmans Park stations. The route parallel to the railway exists as a footpath which would need upgrading to a bridleway with good surface and ideally lit to allow all year use. (Vets work well beyond 9-5)
The Alban Way is unlit and isolated from main roads. Thus it does not provide a safe commuter route in the winter months.
WelHatCycling believes there should be an all year route alongside the A1057 along the route shown, linking Hatfield to the St Albans Green Ring at Fleetville and then continuing in to the city centre.
This will be a challanging route where streets are narrow and car use is high. The priority therefore might be University of Hertfordshire - Oaklands College - Fleetville to encourage cycling to these two key educational institutions.
Created by Adam Edwards // 1 thread
WelwHatCycling believes there should be shared use pavements along Digswell Road to link the north of the town to the town centre. This would connect to our proposed North - South and East- West routes described in other entries.
Created by Adam Edwards // 1 thread
The cycle route from WGC to Hertford is an unlit isolated former railway. Whilst an excellet ride on a sunny Sunday, it is of little use in the dark winter months for cycle commuting.
The route shown would comprise:
A new shared use pavement along Cole Green Lane / Birchall Lane from the end of the current cycle path to the A414.
A light controlled crossing of the A414 or bridge.
Signed us of the Old Coach Road to the outskirts of Hertford.
Shared use pavement plus signed routes into the centre of the town.
Created by Adam Edwards // 1 thread
The east side of WGC is currently served only by the NCN61 route. In 2014 work was done on Heronswood road to add safety markings due to high incidences of accidents involving bikes. There are local concerns about cyclists using pavements to avoid busy local roads.
There should as a minimum be a route from WGC station to the new QE2 hospital, ideally directly via Woodhall shops. The other routes show other useful possible links to create a cohesive network to serve this section of town.
Created by Adam Edwards // 1 thread
A long standing missing link in WHBC area cycle routes. The current Bessemer Way cycle path ends where the road becomes a busy dual carriage way. There is no off road cycling link to Welwyn village which prevents the children of the town cycling to Monks Walk School (yet it is possible for Hatfield children to get there virtually the whole way on cycle path!)
Created by Adam Edwards // 1 thread
This route would use a combination of 20 mph road (Fretherne Road, Stonehills) plus upgraded crossings to create a north south route through the centre of Welwyn Garden City. It would share a common section around the Welwyn Hatfield Borough Council Offices and the Campus with the east west route described in another section.
The route would link NCN57 south of the town with the existing link from Campus East to Shirepark, thus enabling commuters from this business park to access the station. Going further north the link over the White Bridge would then open up the quiet residential streets of north WGC for cycling to and from the town centre. Via the east west route their would be a better connection to NCN12 avoiding the busy Parkway.
Created by Adam Edwards // 1 thread
Welwyn Garden City has no off road town centre cycle routes. This east west route would link the network of cycle paths to the east of the town centre to NCN12 to the west and enable cyclists to avoid The Campus, a deceptively green gyratory which is difficult for cyclists to navigate.
It would connect with a north south route at the Welwyn Hatfield Borough Council offices, encouraging staff to cycle to work. It would encourage commuters to cycle from west WGC to the station and to work places off Broadwater Road and at the Mundells.
Created by Adam Edwards // 1 thread
The Sustrans map erroneously shows part of this route as an on road cycle path. No such path exists.
The Common is one way south west bound. In order to spare cyclist having to use the on road cycle lane on Queensway which is badly engineered, especially at the Woods Ave roundabout, WelHatCycling believe there should be a contraflow cycle lane or shared use pavement along this route, extending accross Lemsford Road and connecting with the existing cycle path on St Albans Road West. This would create a route through the town centre to connect north and south Hatfield.
The photo shows the north end of the Common as currently arranged for cycling.
Created by Adam Edwards // 1 thread
Just two (2!) metres of tarmac would legally connect Dellfield Road to the Woods Ave cycle path. With no other work than this it would allow cyclists heading west to avoid the nasty on road cycle path along Queensway parallel to this route.
Ideally works would also be done to allow cyclists heading east to use this route and then continue along the planned Queensway cycle path (see other entry) to avoid Queensway entirely.
Created by Adam Edwards // 1 thread
Hertfordshire County Council announced plans in 2014 to improve the walking route from Hatfield town centre to the railway station. We lobbied successfully for the section from the Market Place toucan to the French Horn Lane pelican crossing to be reubuilt as dual use, completing a vital link from the station to the University.
This would be even better if officially extended round the skateboard park and accross Link Drive to join up with the Woods Ave off road cycle path, thus enabling cyclists to avoid the dangerous roundabout at the junction of Woods Ave and Queensway. This is shown in the map to the west (left) end of the route shown.
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by Roxanne (CEO) // 3 threads
Thread for County Council Economy and Environment Committee meetings
http://www2.cambridgeshire.gov.uk/CommitteeMinutes/Committees/Committee.aspx?committeeID=74
Created by Chris Peck // 1 thread
Woodside Park is a commercial area which the developers wish to turn into an 87 dwelling residential area, comprised of 61 flats and 26 houses, with up to 235 residents. An additional office space area could also be turned into a further 20 2-bed flats, resulting in a total of 107 dwellings.
The developers' transport assessment suggest this:
"Whilst there are no formal facilities for cyclists, the local roads are suitable for use
by cyclists, and Catteshall Lane is identified as a recommended cycle route by SCC
and Sustrans. This cycle route links with Godalming town centre and Godalming
railway station, which is approximately five minutes from the site by bicycle."
This is patently not true, as the route to Godalming station via the town centre is one-way!
Car parking
135 car parking spaces are planned, however, the assessment suggests that, comparing equivalent car ownership in the local area, only 86 spaces are actually required (because there are only 0.8 cars per flat in central Godalming, and 1.42 cars per house).
While it is accepted that a few extra spaces are required for visitors, is 56% extra parking really needed?
Cycle parking
No numbers are provided, but houses are expected to accommodate cycles in sheds or garages, while there will be covered cycle storage for the flats.
More detail is required on how secure this storage will be.
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
Created by Chris Peck // 1 thread
With the welcome completion of the cycle path linking Marshall Road to Bridge Road, the weaknesses of links on either side of the route become more apparent.
Bridge Road is a busy, narrow main road. Traffic mostly has to wait behind cyclists, creating uncomfortable conditions for all but the brave. Both roundabouts (at the Chalk Road/Meadrow and the Bridge Street/Wharf Street junctions) are difficult for cyclists (and pedestrians).
An alternative route, either running parallel to the road (a widened shared use footway?) or a raised boardwalk across the Lammas Lands, are alternatives, but both are expensive, challenging options, which require new or wider bridges over Hell Ditch and the River Wey.
Created by Bracken VanRyssen // 1 thread
The path between Smith's Wood and Water Orton could be a key cycling and walking link and a way to avoid the only other crossing of the A452 and M6, which is the busy and fast Water Orton Road. However the route is blocked off with concrete blocks and is in an extremely poor state of repair with overgrown bushes and an exceedingly unpleasant subway.
Martin Lucas-Smith // 3 threads
The City Council has been working on a City Centre Access Strategy to deal with the problem of obstructions, including inconsiderately-parked bikes. This is to be considered formally by a City Council Committee.
Created by Jon_B // 0 threads
There are currently (29/06/15) temporary 3 way traffic lights in place at the junction where Rope Walk meets St Helen's Street.
This is normally a really painful junction for people cycling from Rope Walks onto St Helens Street at busy times with long waits for a gap in traffic and bad sight lines, particularly where west-bound traffic backs up leaving a gap at the yellow box junction so that people cycling have to venture out halfway across the road to see if there is any traffic coming east-bound.
The lights make this considerably easier and would be worth considering as a permanent signal.
Created by Iain Lane // 2 threads
Dear Consultee,
Nottingham City Council (Radford Road Area, Nottingham) (Prohibitions of Waiting and Parking Places (Specified Classes of Vehicles)) Traffic Regulation Order 2015 (TMP 7115)
Please find attached a consultation letter and associated drawings, SN/TMP7115/01/A, SN/TMP7115/01/B and SN/TMP7115/01/C which relates to the above Radford Road Area, Nottingham – Traffic Regulation Order (TMP 7115).
Created by Dawes Jaguar // 0 threads
The pointless pedestrian gate here is really awkward for pedestrians and cyclists alike, as it's hung on the wrong post and the area of bitmac that has been laid for it is ludicrously small. This area normally ends up a muddy mess in the winter. People simply don't move in sub one metre angular movements, shunting back and forth to avoid the grass. Note the track in the grass that shows what one cyclist did shortly before the Google car got there.
Remove all three gates and replace them with a removable bollard.
Created by Dawes Jaguar // 0 threads
There are regular collisions at this junction because motorists speed on Bournville Lane and the site-lines are very, very poor. The simple solution is to change the priority. This would solve the problem for motorists, and make it easier for cyclists to use Hay Green Lane as part of a cycle route.
I have suggested the change of priority to BCC but was given a list of excuses why this cannot possibly be done. One of these was that Bournville Lane is a blue route. I see no benefit in an emergency journey ending here because someone pulling out of Hay Green Lane couldn't see the approaching police car.
Created by Dawes Jaguar // 0 threads
Cotteridge town centre has been allowed to degenerate into a hostile place for cyclists and pedestrians. Motorists have multiple lanes for driving and parking, whilst pedestrians are blocked from crossing the road by steel railings. Cyclists are given nothing. Watford Road and Rowheath Road are both OK for cycling, but their junction with Watford Road is horrendous. Midland Road has no contra-flow, so it is obstructive to cyclists trying to avoid the multi-lane horror of the Pershore Road. The two lane double-roundabout is difficult to negotiate even in a car.
This whole area needs to be redesigned, putting cyclists and pedestrians first. I'm sure I'm not the only person who doesn't shop in Cotteridge because the environment is /vile/.
Created by Dawes Jaguar // 0 threads
Birdcage Walk is fitted with Cycling Prohibited signs and barriers, yet it is as wide as some roads. Talking to a PCSO on a bike I saw cycling there, he told me Cadbury's were happy for people to cycle on Birdcage Walk if they did so responsibly. So how about replacing the signs with "Share with Care" signs, and the barriers with bollards spaced wide enough to allow cyclists through but not motor vehicles?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by Cycling Dumfries // 1 thread
At the moment there are toucan crossings from the Whitesands up to the High Street past the lower entrance to the Loreburne Centre (where the buses stop) but there is no actual cycle path so you end up illegally on the pavement. It would be a useful route otherwise, as long as cyclists can get past the bus stops (and waiting bus passengers).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.