Engaging with election candidates
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 31 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by David Earl // 1 thread
'Except cycles' plates missing on No Left/Right turn signs at Mackenzie Road and Stockwell Street, and shared-use signs missing on Perne Road between Natal Road and Brookfields
Created by David Earl // 2 threads
The new franchise for the Kings Cross rail line started recently. We have been sent a letter of introduction.
Created by MJR // 1 thread
Basil Drive, Coriander Road and Bay Walk are residential streets that probably should be a 20mph zone, at least to avoid sat-nav routing cars that way in preference to Rosemary Way.
Created by Hester Wells // 1 thread
"Following a request for a vehicular access outside of 27 Tenison Avenue it is
proposed to revoke a 5 metre length of Residents Parking Bay and replace it with
double yellow lines.
If you wish to object to any of these proposals you should send the grounds for
objection in writing to policyandregulation@cambridgeshire.gov.uk to reach us by no
later than 19th September 2014 quoting reference PR0147."
Created by David Butler // 1 thread
Extensive package of measures which "aims to transform the accessibility and connectivity to and around Stockport town centre.
The plan considers access by all modes of travel and specifically aims to ease congestion for buses and general road traffic, as part of an ambitious vision and development framework for investment in the town centre"
Created by John Chamberlain // 3 threads
Camden are consulting residents, cyclists and others on their plans to extend the Royal College Street cycle facilities to the north, across Camden Road and up to Kentish Town Road. If it is approved, we think this will be a great improvement as it will provide protected two-way cycling all the way. Later there are plans to extend it south to Kings Cross.
We hope you will respond to Camden in support as there may be objections from residents, especially as it results in some loss/relocation of parking.
Details of the proposals can be found on Camden’s website at:
https://consultations.wearecamden.org/culture-environment/royal-college-street-walking-and-cycling-improveme
For cyclists, the main proposals are as follows:
- Two way cycling all the way up and down Royal College Street with no need to use St Pancras Way or Camden Street.
- Protected northbound and southbound cycle lanes with no loading or parking within the cycle lanes.
- A separate green phase for N-S and S-N bound cyclists at Camden Road.
The difficult areas are the Camden Road crossing, which we think Camden have handled in an effective and innovative way, and the southbound split at College Gardens, where motor traffic has to bear left but cyclists go straight. This is not easy to handle without the danger of left hooks, but we think that the suggested solution, which involves road narrowing and a raised junction to slow motor vehicles, is the best option.
Please feed your comments to us via the threads on this issue, or by email to john@camdencyclists.org.uk
Our response needs to be in by 3rd October so we'll take comments on board until the 28th.
Created by Tom B // 2 threads
Previously, there was an Advanced Stop Line on Kew Gardens Road (B353) where it joins Kew Road (A307). The junction was recently resurfaced, which removed the ASL markings, and they have not been replaced. I have attached a Google Streetview photo showing the ASL that was previously present.
The ASL marking was very useful, as the junction can become gridlocked in rush hour, so that only cycles can take advantage of the green signal from Kew Gardens Road without blocking the junction. Cyclists therefore need the space to be able to safely wait at the front of the queue.
It would be great if the ASL markings could be restored as soon as possible. If they have been removed for a reason, then I would like to understand what the justification is.
Created by George Coulouris // 4 threads
Full details of the consultation are at:
https://consultations.tfl.gov.uk/cycling/northsouth
closing date for comments is 19 October 2014.
Camden Cyclists we propose to send a response to this consultation on behalf of our members. This will focus only on the part within Camden (the section between Charterhouse Street and Euston Road - as detailed on the map attached). But note that the alignment of the route north of Greville Street is not agreed between Camden and TfL and is not formally considered a part of the consultation.
So it makes sense to have two discussion threads for the sections in Camden south and north of Greville Street.
Created by James Gilbert // 1 thread
The Astra Zeneca developers (I assume) have installed a chicane made from two plastic roadwork blocks, plus a little "Chicane Ahead" warning sign on the down slope of the guided busway path as it approaches Francis Crick Avenue.
I assume that the idea is to slow down cyclists, but I don't see why this is any more necessary than it was before their building site was created. I think it will make collisions between cyclists, or between cyclists and pedestrians, more likely.
Created by Clive // 1 thread
Herts County Council proposal to make currently two-way Vicarage Road a one-way street between j/w Scammell Way and Hagden Lane and provide a ''kiss and drop'' lay-by in Scammell Way. The one-way section will be for northbound traffic only (ie travelling towards the town centre).
For further details see:
http://www.watfordobserver.co.uk/news/11422333.Plans_to_make_part_of_Vicarage_Road_one_way_and_bring_in_parking_scheme_branded__ill_conceived__and_a_safety_risk/
Herts County Council will have a display at Watford Cycle Hub
====date and time to be confirmed====
Place: Watford Cycle Hub
The Pavilion
Chaffinch Lane
Watford
WD18 9QD
Map: http://www.openstreetmap.org/?mlat=51.6428&mlon=-0.4165#map=14/51.6428/-0.4165&layers=C
Created by David Butler // 1 thread
Salford Council/Urban Vision consultation on CCAG scheme. "The proposed cycle improvement between Station Road in Irlam and Astley Road in Cadishead will enable better sharing of the road space by all users and improve conditions for cyclists and pedestrians. Cycle parking facilities will be provided and cycle symbols on the road will be marked to highlight the presence of cyclists. Line markings and the construction of build outs and central reserves are proposed to narrow the road and reduce the overall speed of vehicles"
Created by David Butler // 1 thread
Salford Council/Urban Vision consultation on this CCAG scheme. "A new cycle lane will be implemented along Liverpool Street between Langworthy Road and Cross Lane, linking the neighbouring residential areas to employment and educational opportunities at Salford Quays, MediaCityUK, the University of Salford and Manchester City Centre"
Created by David Butler // 1 thread
Salford Council/Urban Vision consultation on CCAG funded scheme. "This route will provide new cycling facilities on Silk Street and North George Street, linking route one to the University of Salford and improving onward cycling links to Salford Quays and the regional centre, through the existing wider cycle network."
Created by David Butler // 1 thread
Consultation by Salford Council/Urban Vision on CCAG funded scheme. "This will provide a new cycle lane along the length of Great Clowes Street and Blackfriars Road, which will link the residential area of Broughton to Manchester city centre. Where possible the route will be segregated from traffic"
Created by David Butler // 1 thread
Consultation about cycling in Lyme Park, carried out by the National Turst
Created by David Butler // 1 thread
New cinema and car park next to Debenhams in Stockport centre. New open space on Bridgefield Street and Prince's Street. One of the objectives is "to provide enhanced public transport routes,cycle facilities and pedestrian access". Issues: cycle parking, shared space, link to wider cycle network.
Created by David Earl // 1 thread
This bus gate is a continuing problem. We first raised this when it was first installed in 2007. The problem hasn't gone away.
http://www.camcycle.org.uk/newsletters/70/article6.html
Created by George Coulouris // 1 thread
You probably remember that we began a new 'Quick Wins' campaign in November 2013.
http://camdencyclists.org.uk/camden/campaigns/quick-wins
I asked members for their suggestions for (very) minor improvements throughout the borough that will make cyclists feel better catered for. These are examples of the type of changes that Camden felt could be implemented without consultation of local residents/businesses:
⁃ dropped kerbs
⁃ obstructive barriers (i.e. anti-motor cycle barriers)
⁃ stretches of poor road surface
⁃ Feeders into ASLs that are too short or non-mandatory
The response from members was very good and we were able to assemble a list of suggestions and submit it to Camden in November 2013. Camden responded by assigning an officer to work on the entire list and he has worked hard to progress them.
The web page linked above includes a table showing the list of 17 suggestions that were submitted to Camden, updated to show the five suggestions that we know for sure to have been completed (those table entries are in italic with completion date and a photo). There may be one or two other items in the list that have been completed - I haven't been to check all of them recently ;-) I would be very grateful to anyone who can give me up-to-date information on the status of the other items.
Several other minor changes that we have suggested, outside the 'Quick Wins' list have also been completed this year.
As far as I know Camden still intend to progress most of the remaining items. It is worth noting that some of these relatively minor changes received significant 'push-back' from locals, making the process slower and more expensive than it might have been.
We and Camden are still very positive about this campaign. Camden are now asking us for a set of 'Phase 2' suggestions. The criteria for this are likely to include the types of changes suggested in the first phase but also include some new ones.
We are still clarifying with Camden the new categories that can be classified as 'quick wins' (i.e. can be implemented without consultation). They may include:
⁃ widening cycle lanes or converting them to mandatory (i.e. replacing a dashed with a solid white line). In some cases this might be a first step towards installing lightweight segregation.
⁃ widening existing cycle lanes where there is limited traffic impact.
⁃ widening bus lanes to 4.5m to allow safer overtaking of buses by cycles and vice-versa.
⁃ adding cycle lanes that link up sections of bus lane.
⁃ trial lane closures to provide better space for cycling.
⁃ more 2-way cycling on side roads.
I would be grateful for your feedback, commenting on the categories of changes or preliminary suggestions for actual changes.
I plan to construct a new list for submission to Camden in October, but I would be grateful for concrete suggestions by mid-September.
It helps if you can provide a link to the relevant location on Google maps. A photo is even more helpful.
George C.
Between the A10 cycleway and the Hardwick Road cycleway is a complex of sluggish crossings, narrow tracks and dangerous junctions which currently (early 2014) take 7 minutes if you wait for all the crossings. Of course, the red bike lights are only advisory, but then riders and drivers are hindered by the poor visibility at many of the crossings, plus some drivers mistakenly believe that riders should dismount and walk across, to the point of harassing riders who ride across.
Unsurprisingly, some commuters riding through this junction have developed a number of innovative and, eh, "interesting" approaches to it. This shouldn't be necessary. This junction between the Highways Agency's A47 and Norfolk County Council's A10 and A149 should be cycle-proofed as a high priority, before the planned housing at West Winch and North Runcton.
Created by MJR // 2 threads
The Parish Council have prepared the plan with the help of local residents, businesses and interest groups. A draft was prepared in February 2014 for consultation locally and with statutory bodies. When fully approved, it will take the place of many North Somerset Council planning policies which cover Long Ashton Parish. It will contain policies to:-
· protect areas of Local Green Space from development
· protect the open countryside between Long Ashton and Bristol
· protect and improve recreation and community facilities
· support the shops, services and businesses within the village
· reduce traffic speeds through the village and make it a more pedestrian friendly environment.
North Somerset Council http://www.n-somerset.gov.uk is currently preparing an Employment-Led Delivery at Weston-super-Mare Supplementary Planning Document(SPD). The SPD provides guidance on how the Council applies Core Strategy policy CS20 Supporting a Successful Economy.
Created by Rohan Wilson // 1 thread
Bike Bus Explorer tows a 30-bike(?) trailer. Picks/drops bikes at Cambridge Station, Brooklands Avenue, Barton Rd then a linear route to Wimpole, and a ring from Arrington via Hatley, Gamlingay, Gransdens, Longstowe.
It leaves the station Sunday and Bank Holidays at 09:00, 11:30, 14:30, 17:00. Last return to Cambridge arrives 19:12.
A leaflet gives info about the rural destinations including Wildlife Trust sites, and a map showing the bus route, stops and suggested rural cycle rides. Operations exclude Christmas Day, Boxing Day, New Year's Day, suggesting it operates all year.
Created by Stefan Kaye // 1 thread
For several weeks now, ever since part of the surface of the path was repaired, the cycle detector loops at the crossing of Maids Causeway from Midusummer Common to Fair Street have not been working. This means that cyclists using the crossing have stop and press the button unless the road is already completely clear. Does anyone know any more about this problem, and to whom should a complaint be addressed?
Created by Hester Wells // 3 threads
The Papworth Hospital is moving to Addenbrooke's.
There is a public consultation until 26th August 2014, ahead of a planning application in September.
http://www.papworthhospital.nhs.uk/content.php?/about/new_papworth_hospital/public_consultation
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by North Devon Cycling Forum // 0 threads
Two-way traffic for cyclists on Barbican Terrace-Litchdon Street, allowing to cycle from the Strand to Summerland Street
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by David Butler // 1 thread
Consultation of cycle lanes and junction changes by Manchester City Council
Created by Charlie Halliday // 1 thread
Proposed off-road cycle path following the A323, Norris Hill Road, to link Fleet with the existing cycle-path from Norris Bridge towards the centre of Farnborough.
It would enable cyclists to avoid Norris Hill Road, an unlit road with speed limit of 60 mph. Once built it would be possible to cycle from Fleet to Farnborough without cycling on roads.
This is in the Fleet Town Access Plan ref. PC9
Created by Marcus Howarth // 1 thread
see https://consultations.tfl.gov.uk/trams/sutton-link/?cid=sutton-link
Here's the overview from TFL:
Overview
We are consulting on proposals for a new, direct and quicker transport link between Sutton and Merton. We have called this the Sutton Link.
The Sutton Link would create a high-capacity route for people travelling between Sutton town centre and Merton using zero-emission vehicles. It would connect with other major transport services into central London and across south London, including National Rail, London Underground, existing tram and bus services. It would make journeys by public transport quicker and more attractive, and reduce the need for trips by private car.
Many of the neighbourhoods along the proposed routes have limited public transport options. The Sutton Link would support new homes being built and would improve access to jobs, services, major transport hubs and leisure opportunities across both boroughs and beyond.
Our work is at a stage where we would like to know your views about three potential routes. We are considering a tram or ‘bus rapid transit’ (BRT) for the Sutton Link and would also like to know your views on this.
BRT is similar to a tram but runs on road segregated from traffic where possible, not on rails, and carries fewer people in each vehicle. A full explanation is included below in the section titled ‘About trams and bus rapid transit’.
From LCC -
general principles would be ensure this doesn’t negatively impact cycle routes, that there are good routes to the stations/stops, that any places where cyclists will be crossing tracks are designed carefully with latest materials to avoid tramlining incidents, that the space comes from private car lanes.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Dominic Fee // 1 thread
East-West Cycle Superhighway Phase 2 from Paddington to Acton
Created by Sam Saunders // 0 threads
A twenty metre stretch of advisory cycle lane at the end of Whiteladies Road, from a zebra crossing to its junction with Queens Road, encourages cyclists to take a position near to the curb as they enter the and leave the junction. This puts them exposed to frequent buses turning immediately left into Queens Avenue and in a vulnerable position from which to continue a journey south west towards Park Street or Park Row.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Jean Dollimore // 1 thread
Fleet Road is a one-way street with heavy motor traffic and no protected cycle infrastructure. This means that people cycling through the area face unpleasant interactions with motor vehicles as well as needing to make diversions to reach destinations in the area,