tram track accidents
There have been a number of accidents here because of the angle that Shrewsbury Road joins Granville Street, and also the way the tram stop platform juts out into the road forcing cyclists to cross the tracks.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here because of the angle that Shrewsbury Road joins Granville Street, and also the way the tram stop platform juts out into the road forcing cyclists to cross the tracks.
Created by Dexter Johnstone // 1 thread
There are a lot of accidents around this tram stop:
https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek&usp=sharing
Because the pavements are narrower here I don't think there is room to provide an off road route around the stop. Therefore an alternative, signed cycle route should be provided to avoid this tram stop.
Created by Dexter Johnstone // 1 thread
Because of the way the tram lines criss-cross the road at Hillsborough corner it is very difficult to cycle through this area safely. There are a lot of accidents here, see map: https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek
Created by Dexter Johnstone // 1 thread
the off road cycle path along Infirmary Road which currently ends at the Junction with Whitehouse Lane could be extended along Langsett Road on the left hand side of the road as you go away from town towards Hillsborough. At the moment there is just a grass verge from Primrose Hill to Bamford Street.
Created by Dexter Johnstone // 1 thread
There are a lot of accidents around this tram stop - see here for evidence: https://www.google.com/maps/d/edit?mid=zUOBSdPNPOfg.k1ohLkAyXvek&usp=sharing
This is because the platform juts into the road - causing cyclists to have to cross the tracks.
However, there is ample room behind the tram stop platforms on either side of the road for an off road cycle path. Currently there is just a grass verge behind the platforms.
Created by Dexter Johnstone // 1 thread
When cycling towards town along Langsett Road it is difficult/hazardous to get to the off road cycle path on the other side of the road which starts on the corner of Infirmary Road/Whitehouse Lane because you need to cross the tram tracks.
The junction at the top of West Street is dangerous because it is difficult for anyone travelling from Glossop Road onto West Street to cross the lines at a right angle. There is no signage warning of this, although I have seen such signs in other UK cities with trams.
One cyclist I know suffered a badly damaged shoulder which needed a metal plate to repair it, and resulted in long term discomfort, loss of mobility and strength.
I revisited the spot yesterday and found that of the 4 lines I could get some kind of angle on 3, but that left me 'between the lines' going down West St with no way to escape. Much to the chagrin of the Ford Transit driver following me!
Created by Roxanne (CEO) // 1 thread
Erection of 23 residential units (use class C3) to be arranged in two blocks comprising a mix of studio and 1 & 2 bed flats including 40% affordable housing, two car parking spaces, cycle parking and associated hard and soft landscaping.
149B Histon Road Cambridge Cambridgeshire CB4 3JD
Application reference : 15/1369/FUL
DETAILS:
23 residential apartment units comprising 22 x 1-bed and studio units and 1 x 2 bed unit
Transport statement:
There will be no onsite car parking
There will be 26 cycle parking spaces (the minimum requirement is 24)
States (in paragraph 6.3) that the cycle parking will meet the requirements from the local plan 2006:
>Cycle racks or stands should conform to the design and dimension requirements.
>For residential, cycle parking should be within a covered lockable enclosure. The cycle parking should be accessible and convenient to use.
>All cycle parking should be designed to minimise conflict between cycles and motor vehicles.
There are no details or drawings of the proposed cycle parking provision in the transport statement.
Floor Plans:
The floor plans for A and B indicate there will be two enclosed cycle store areas, one on the ground floor of each block. There are no details of what type of racks will be used. Although the drawing indicates sheffield stands (8 for block A = 16 cycles) (5 for block B = 10 cycles).
Created by Richard Jennings // 1 thread
Norfolk County Council with Norwich City Council are proposing changes to Westlegate, St Stephens Street, Golden Ball Street, Farmers Avenue, Ber Street and Cattle Market Street that include closing some streets to motor traffic and making Golden Ball Street two way.
Generally access for people cycling will be improved in this area and motor traffic reduced. We are considering how well the proposed designs meet the needs of those cycling through the area.
Consultation closed on 27 July 2015.
Created by JonathanF // 1 thread
Proposal from Sainsbury's to build a new petrol filling station at their Fallowfield store, which is accessed from Wilmslow Road at a junction shared with Fallowfield Loop cycle traffic.
MCC planning app: 109301/FO/2015/S1 or PP-04261580
http://pa.manchester.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=NQHVVCBC6K000
Travel - Transport Survey: http://www.publicaccess.manchester.gov.uk/associateddocs/Default1.aspx?109301-tts-0001.pdf
Martin Lucas-Smith // 1 thread
The following planning application has been submitted. This may be an opportunity to raise through the planning system the inappropriateness that vehicles can be driven into the site but not people cannot cycle (I believe). As the planning application includes public access to the new facilities, the ability for people to cycle direct to the buildings is relevant to the public.
---
Demolition of old chorister block and netball court and erection of new sports hall, gym/studio and changing rooms including new pedestrian access and landscaping.
Kings College School West Road Cambridge Cambridgeshire CB3 9DN
Application reference : 15/1309/FUL
Created by Shaun McDonald // 1 thread
Ipswich Borough Council are currently consulting on the Cycling Supplementary Planning Document (SPD), and are in the early Call for Ideas stage.
"
Cycling Strategy Supplementary Planning Document – Call for Ideas
The Council is preparing a Cycling Strategy Supplementary Planning Document (SPD), as set out in its Local Development Scheme (8th Edition, September 2014). The SPD will provide additional guidance to policies contained in the Ipswich Local Plan (currently the
Core Strategy and Policies development plan document 2011 and remaining saved policies of the Ipswich Local Plan 1997). Further information on the Local Plan can be found at www.ipswich.gov.uk/localplan. The SPD will not set new policies but will be a material consideration in taking decisions on planning applications. The Council has already adopted a number of SPDs which can be found at www.ipswich.gov.uk/content/current-and- proposed-supplementary-planning-documents.
The scope of the Cycling Strategy SPD relates to providing guidance on the provision of cycling infrastructure as part of new development and will also provide an opportunity to identify potential wider improvements to cycling infrastructure across the Borough. Cycling infrastructure in this respect not only relates to places where people cycle but also to provision for parking and storing cycles.
At this stage we are asking for ideas on what the SPD should contain. This consultation is being carried out under Regulation 12 of the Town and Country Planning (Local Planning) (England) Regulations 2012. Following this initial Call for Ideas consultation, there will be a public consultation on the draft SPD which is anticipated to take place during Autumn 2015.
We would appreciate any ideas you may have on the content of the SPD – the questions below may act as useful prompts.
What measures should be taken to encourage cycling in and around new developments?
What measures should be taken to encourage cycling throughout the Borough?
Are you aware of any particular issues which would currently act to discourage
cycling in the Borough?
Please send us any comments by 11:45pm on Monday 17th August 2015. A comments form is available on our website at www.ipswich.gov.uk/consultations. If you would like further information, please contact Felicia Blake on 01473 432019.
As part of the production of the SPD the Council is also looking for school / college pupils’ and their parents’ views on cycling to school – a short online survey is available at www.ipswich.gov.uk/consultations.
"
From https://www.ipswich.gov.uk/sites/default/files/cycling_strategy_spd_call_for_ideas_-_june_2015.pdf
Created by Rosie Downes // 0 threads
Created by Roxanne (CEO) // 1 thread
We have been invited by the City Council to join a meeting to discuss lighting for green spaces. Is this something we would like to partake in and if so who is the best representative for the Campaign.
The draft agenda is:
· Introductions
· Where we are now
· What we want to achieve
· Discussion on Lighting for Green Spaces
· AOB
The meeting will be held at the Guildhall in Cambridge, final details to be confirmed once the date and agenda are agreed.
Created by Sam Webster // 1 thread
Surprised to see that somebody has put up barriers restricting the width of the bus/cycle path so that there's not enough room for a bus to pass a bike. Dangerous enough to call Police?
Created by Rohan Wilson // 1 thread
15/1227/FUL | Erection of a new 18,000sqm research laboratory building (Use Class B1 (b)) and associated works. | Puddicombe Way Cambridge
Site Plan shows "Cycle Storage" adjacent to the hotel? site to the east.
Red line extending to Robinson Way (north of Francis Crick roundabout), Puddicombe Way and including half the Forum area suggests intention to secure good transport links.
Essential to remedy poor walking/cycling layout at foot of busway/cycleway bridge, and secure easy access to (across?) the bus/cycleway's extension to The Forum, where the intention may be to continue cycleway on southern side only of busway.
Standard Consultation Expiry Date Thu 06 Aug 2015
Created by Chris Peck // 2 threads
Proposals from the developers, the Rutland Group, for 1,800 homes and more businesses on Dunsfold aerodrome.
The proposal says the developers wish "To encourage walking, cycling and use of bus services, and make internal car use unnecessary"
http://www.dunsfoldpark.com/files/dunsfold-park-1-july-exhibition-boards.pdf
Created by Lizzie // 1 thread
Protected space for cycling Eastbound along Clyde Gateway, it's marked along the footway, too narrow but not bad. Then reach the junction with Dunn St and the cycle path joins the carriageway and immediately in conflict with a huge sweeping left turn filter lane. This is terrible, dangerous design.
Created by Lizzie // 1 thread
Glasgow City Council have confirmed that Polmadie Bridge is to be demolished as it cannot be repaired. This imperfect but important link from southside has been severed; makes a mockery of Commonwealth games legacy routes.
Created by Lizzie // 0 threads
More cycle parking needed: the racks at the entrance - as limited as it is - overflowing with bikes.
Richard G // 1 thread
the junction of Consort Avenue and the old service road alongside Hauxton Road seems to have been designed specially to hold up cyclists
It has two button controlled crossings, over a lightly used road, and I would expect it to be ignored by every single cyclist.
A simple, "Give Way" should be perfectly sufficient I would have thought
Was any comment made when this was designed/proposed?
Martin Lucas-Smith // 1 thread
The County Council is proposing to power off street lights overnight for most residential streets in Cambridge.
http://democracy.cambridge.gov.uk/ieIssueDetails.aspx?IId=15022&PlanId=0&Opt=3#AI14389
Created by Adam Edwards // 1 thread
A possible route from Welham Green to the University of Hertfordshire and then to the Hatfield business park via the University park and ride and possible sports ground at Angerland Common, Hatfield.
The route would use Dellsome Lane, if vegetation cleared, a short new route accross Angerland Common, the traffic lights at the park and ride to cross South Way and then shared use of the Roehyde Way pavement to join up with the existing cycle path between Colney Heath and the University.
Created by Adam Edwards // 1 thread
In 1884 the 18 year old Beatrix Potter stayed at Bush Hall, fished in the Lea and painted a Hertfordshire Farm which looks remarkably like Mill Green, home of the WHBC museum.
WelHatCycling therefore proposes a leisure cycling route from Stanborough Park alongside the river Lea past Bush Hall to Mill Green.
Information on Beatrix Potter's visit to Hatfield can be found here:
http://www.ourhatfield.org.uk/page_id__209.aspx
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Jack Thurston // 0 threads
Cycle route 42 along Castle Street requires cyclists to make an absurd off-road detour around the castle grounds and through an industrial estate to rejoin the routes east of the town centre at Holywell Road.
This could be avoided if cycling were allowed in a south-west to north-east direction on Lower Castle Street. Ideally this narrow street should be a walking/cycling only street, or a cycling contraflow could be introduced, though the narrowness of the street makes this a second-best solution.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Starting a thread about this application here so we can continue on from the previous planning list discussion.