21/01609/FUL: 7 1bed flats & restaurant, 60 Mill Road
21/01609/FUL | Demolition of existing HMO and construction of 7 no. replacement 1 bedroom apartments and 1 no. restaurant | 60 Mill Road Cambridge CB1 2AS
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01609/FUL | Demolition of existing HMO and construction of 7 no. replacement 1 bedroom apartments and 1 no. restaurant | 60 Mill Road Cambridge CB1 2AS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01764/FUL | Conversion of 3bed dwelling to 2no. 1bed flats and 1no. 2bed flat, following a part two storey side and rear and part single storey rear extensions. | 45 Kings Hedges Road Cambridge CB4 2QE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01697/FUL | Retrospective change of use (Use Class C3 or C4) to a large house of multiple occupation (Use Class Sui Generis). | 40 Hanson Court Cambridge CB4 2SE
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/02148/PRI03O | Prior approval for a change of Use from Offices (Class B1(a)) to 1 No. Dwellinghouse (Class C3). | Anglia Accommodation Services 190 Green End Road Cambridge Cambridgeshire CB4 1RN
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01791/FUL | Construction of a 1 bed bungalow | Land Rear Of 190 Green End Road Cambridge Cambridgeshire
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 201309: Demolition of existing structures & redevelopment to construct 4 No. three bed residential dwellings (Class C3) with associated garages, car parking & access. All matters r
Created by Steven Moseley // 1 thread
Erection of new dwelling (previously approved under 172115)
Created by Steven Moseley // 1 thread
he Essex County Council (St Nicholas Street, Colchester) (One Way) Order 202*Statement of ReasonsSummary of the LocationSt Nicholas Street, Colchester, illustrated on drawingref. 169_HAT_GA_110 Rev. B.Reasons for the Proposed ChangesThis one-way restriction is part of a wider public realm improvement project proposed by Colchester Borough Council for the area around St Nicholas Square. For details of the proposed development, visit their webpage https://www.colchester.gov.uk/info/cbc-article/?id=KA-035711Benefits of the Proposed ChangesTo enhance the public realm in St Nicholas Square, and minimise carriageway to create enhanced footways and space availablefor outdoor seating. The key aims of the St Nicholas Square project are to:• Create a more pedestrian friendly environment, less dominated by car anddelivery traffic• Create more outdoor seating space for cafés and restaurants to spill out• Createspace for market stalls and events to happen• Ensure the space is accessible to all usersA number of local Councillors have been supportive of the scheme and the overall ambition to create a more pedestrian friendly and open square, which supports local businesses through the creation of more external seating areas, more space for markets and events, and increased footfall in the long term.CBC have secured central government funding enabling the project to move forward.
sound+fury // 1 thread
It's unclear if there is any cycle parking related to this attraction.
Created by Rosamund Humphrey (Admin Officer) // 2 threads
21/01625/FUL | Refurbishment, reconfiguration and extension of the existing chapel building to create an improved day nursery facility with external play area and 13 residential apartments (following part demolition), together with associated landscaping and infrastructure | Church Hall 6A Chapel Street Cambridge Cambridgeshire CB4 1DY
Created by Steven Moseley // 1 thread
Proposed Change of Use From Stables to Medical Clinic (class E) & Refurbishment of Structure. Clinic to be used as a private GP clinic and for other allied medical professionals like Physiotherapy. Existing vehicular access to be upgraded.
Created by Steven Moseley // 1 thread
Change of use of stable/outbuildings/annexe to form a single dwelling
Created by Steven Moseley // 1 thread
Erection of four bedroom detached house
Created by Steven Moseley // 1 thread
Erection of 2 No detached single storey dwellings with attached garages, existing dwelling and garage to be demolished and alterationsto existing vehicular access
Created by Steven Moseley // 1 thread
Redevelopment of site to residential comprising of 9 flats.
Created by Roxanne (CEO) // 1 thread
This site has been redeveloped from industrial to commercial use (office and leisure/food).
Reports on Twitter suggest insufficient cycle parking.
Planning application:
Site website:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01330/FUL | Conversion and extensions to provide 9 No. flats (Use Class C3) along with access, cycle parking and associated infrastructure | 4 Highworth Avenue Cambridge Cambridgeshire CB4 2BG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01393/FUL | Construction of a drop-off/pick-up bay located along Gilbert Road to assist taxi movements associated with the aparthotel | Gilbert Road Adjacent To Aparthotel 33A Milton Road Cambridge Cambridgeshire CB4 1UZ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01402/FUL | Conversion of the existing warden's office to a bedroom with en-suite, adaption of the existing car park to increase capacity with 4 additional spaces, and installation of a new Bike Shelter. | Ely Place Monkswell Cambridge CB2 9SS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01279/FUL | Demolition of existing garage and creation of a one bedroom dwelling including outdoor amenity space and primary pedestrian access from Cromwell Road | Land At 64 Cromwell Road Cambridge CB1 3EG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01297/FUL | Change of use and conversion of the existing Regent Hotel from an hotel use to serviced accommodation (sui generis use). | Regent Hotel 41 Regent Street Cambridge Cambridgeshire CB2 1AB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/01315/FUL | Erection of a 3bed detached dwelling. | 24 Elfleda Road Cambridge CB5 8LZ
Created by Steven Moseley // 1 thread
Demolition of former Cinema buildings and the re-construction of the Foyer Building and the erection of a new apartment block in place of the auditorium to provide 55no. apartments, 2no. Retail Units (A1) and32no. basement car parking spaces (UPDATED NOI
Proposed construction of a new 2-storey community centre with associated parking and landscaping. Resubmission of 201365.
(Mockup image credit Jim Rayner)
sound+fury // 1 thread
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.