Landseer Road-more signage or traffic calming needed
cycle lanes very narrow with cars parked on, high traffic speed.
Traffic calming or more signage needed
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Andrea // 0 threads
cycle lanes very narrow with cars parked on, high traffic speed.
Traffic calming or more signage needed
Created by Andrea // 0 threads
high speed of vehicles and car parking make this road section hazardous. Traffic calming and signage needed.
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Created by Shaun McDonald // 0 threads
Issue raised at the 10-2014 Cycle Ipswich meeting:
"not enough showers", need more information, such as whether this is specific to a particular department or building.
Created by Shaun McDonald // 1 thread
It's rather odd that the NCN1 has a route sign that tells you to turn right, plus a cycle sign towards the station, yet there is a no right turn sign on the same post.
Martin Lucas-Smith // 3 threads
The University is planning to redevelop the New Museums site. We need to monitor the proposals for cycle parking and cycle access issues.
http://www.admin.cam.ac.uk/offices/em/estate/site/newmuseums.html
NB The Arup Building redevelopment currently in progress is part of the overall redevelopment.
Let's see what happens!
Council Plans to change the Zebra crossing in this area. RCC responded to try to shape the plans to encourage more cycling and walking.
-------
Sheen Road Zebra Crossing Proposed Upgrade - Response from Richmond Cycling Campaign (RCC)
RCC is in general supportive of improving crossings when the upgrades benefit both pedestrians and cyclists. This proposal unfortunately has not fully thought through the interaction of cyclists, pedestrians and motor vehicles, unfortunately we cannot support it in its current form.
RCC would recommend that the scheme is implemented with the changes outlined below. The recommended changes will ensure that vulnerable road users safety is prioritised and the comfort of the cycling and pedestrian experience is enhanced:
The crossing should be raised to slow approaching vehicles. Vehicle speeds are too high in this area, particularly considering the proximity to a primary school.
Removal of the central refuge to create a single stage crossing is to be applauded. This will remove a cycle pinch point and will correctly prioritise pedestrians over other road users.
The new road space that is created by the removal of the central refuge should be used to extend the existing mandatory cycle lanes on each side of the carriageway. It is our understanding that the 2015 TSRGD (traffic signs regulations and general directions) will permit the extension of the cycle lanes over the crossing. The work should pay heed to this so that this can be incorporated when the new regulations go live.
Keep the zebra crossing. RCC cannot support the removal of the zebra crossing at this location, changing to a traffic light controlled crossing, prioritises vehicular traffic over pedestrians and those on bicycles. It is RCC’s belief that concerns, from users, that vehicles are not stopping in a timely fashion at this location are due to excessive speeds rather than the style of crossing. As mentioned earlier lower speeds should be achieved through a raised crossing to make the zebra crossing more effective. An enhanced zebra crossing keeps priority with the most vulnerable road users.
The proposal suggests widening the pavement to make the crossing shorter. This would only have a marginal impact on the time to cross. The pavements should not be widened since this will not permit a continuous cycle lane. It will force cyclists to pull in front of fast moving motor vehicles, creating a new pinch point and hazard for cyclists.
The railings on either side of the road should be removed. TfL research has shown that these encourage high traffic speeds and do little to protect vulnerable road users.
Created by Shaun McDonald // 0 threads
Comments at Cycle Ipswich meeting on 2014-10:
"no cycle lanes"
"scary" referring to the roundabouts.
Created by Shaun McDonald // 1 thread
Comment from October 2014 Cycle Ipswich meeting:
"Want separate cycle and pedestrian lanes all the way along the river path."
Currently the river path is a useful off road link, however it's far too narrow for both pedestrians and cyclists.
Created by Shaun McDonald // 1 thread
Comment from October 2014 Cycle Ipswich meeting:
"Belle Vue Road is very steep for a recommended cycle route."
It's marked on the Ipswich Cycle Route Map.
Created by Shaun McDonald // 0 threads
Comment from October 2014 Cycle Ipswich meeting:
"New white lines force cyclists into traffic."
Created by Shaun McDonald // 0 threads
Comment from the Cycle Ipswich meeting:
"Traffic enforcement for speeding especially 6:15-7pm weekdays."
Created by Shaun McDonald // 1 thread
Comments from Cycle Ipswich meeting:
"Clearer signage - for all"
"More obvious route to/from town"
"alternative 'football days' routes"
Created by Shaun McDonald // 1 thread
Comments from the Cycle Ipswich meeting:
"Poor infrastructure - shared use footway no good"
"poss pinch point removal bot other traffic calming."
Created by Shaun McDonald // 0 threads
Cycle Ipswich Meeting: "Getting south across Star Lane to waterfront very unpleasant".
Where the cyclepath merges onto the road outside the Mercedes garage going to Huddersfield . The white lining disappears and the kerbs rises out of the ground causing a hazard.
I recently came off at speed here causing injury and damage .
Created by Shaun McDonald // 0 threads
Comment at Cycle Ipswich meeting on 2014-10-09:
"not at all nice - cycle "lane" too narrow, not visible in dark, potholed, conflict with turning traffic etc. better to have only 1 lane motors and thus proper [cycle] lane??? (still left turn problem)"
Created by Shaun McDonald // 0 threads
Pedestrians and cyclists are put into conflict when trying to cross at this toucan crossing on Grimwade Street/Rope Walk junction.
Created by Shaun McDonald // 0 threads
The route to Tattingstone from Ipswich requires going along a part of the A137 or over some fields, neither of which is pleasant. An improved alternative is sought.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Andrea // 0 threads
blind bends and high hedges make this junction dangerous as you cannot see traffic
Created by Andrea // 0 threads
This junction needs to improved for cyclists. It is currently dangerous. Please discuss this and give ideas on how to improve it best
Created by Andrea // 0 threads
Woodbridge Road needs a dedicated cycleway, with contraflow when going down towards town. Currently you haven't got the opportunity to use Woodbridge Road as a quick route into town from e.g. Ipswich Hospital as you cannot go all the way.
Created by Andrea // 0 threads
a viable connection for NCN 1 through the Common is needed. Currently we have to go a very awkward route, mixing with traffic
Created by Andrea // 0 threads
We need a cycle route connection alongside this part of Woodbridge Road by Rushmere Common.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David K // 1 thread
At present this is a footpath but it could be widened onto the land owned by Network Rail in order to allow a shared use path.
Kate Ravilious // 0 threads
Like Fossgate, High Petergate needs to be made two-way for cyclists. Otherwise cyclists travelling north are forced to either get off and walk (not an option for disabled cyclists) or join the busy St Leonard's place via a difficult junction.
Created by Simon Munk // 1 thread
Havering council said:
"We wrote to you on 21st October setting out a series of safety proposals for Romford town
centre comprising of a 20mph zone for all streets within the Romford Ring Road (including
some traffic calming measures) and some changes to road markings on various
roundabouts on the Ring Road itself.
We sent out over 2,500 letters to people in the area, but only received 8 responses with 4
of these being from residents. This was reported to the Council’s Highways Advisory
Committee on 6th December where the decision on the scheme was deferred in order for
further discussions to take place with ward councillors.
As a result of these discussions, it has been decided to provide a further period of
consultation and any other comments received shall be reported to the Highways Advisory
Committee on 7th February 2017.
We would therefore like to extend the opportunity for you to provide any comments you
may have to the postal address above, via our email address highways@havering.gov.uk
or through an online form which we have provided at www.havering.gov.uk/consultations."
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Influencing positive changes in road user behaviour is key in providing a safe road environment for the community and although changes in road layout can’t fully resolve this, redesign of our streets can help. Therefore, Chrisp Street and the surrounding areas are currently being invested in with aims to improve road safety for the local community.
Please give us your feedback by filling in the survey (below the map). You may also like to add a comment to our interactive map of the wider area.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by Kevin Ablitt // 1 thread
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Rhian // 1 thread
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Created by Cycling Dumfries // 1 thread
At the moment there are toucan crossings from the Whitesands up to the High Street past the lower entrance to the Loreburne Centre (where the buses stop) but there is no actual cycle path so you end up illegally on the pavement. It would be a useful route otherwise, as long as cyclists can get past the bus stops (and waiting bus passengers).
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Henry Lancashire // 1 thread
Info from survey:
"The London Borough of Brent and Sustrans are working together to explore ways in which the Kilburn High Road and surrounding area shown could be improved. Together we want to better meet the needs of the community to make it a more desireable place to walk, cycle and enjoy being in.
...
London Borough of Brent and London Borough of Camden will submit a joint application to Transport for London's Liveable Neighbourhood programme in November 2018, which will incorporate suggestions made by the community."
Brent Cyclists are forming our own response, to be sent by end of October 2018.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.