Route across Peckforton Hill (NCN45) at risk
NCN45 across Peckforton Hill at risk of being closed
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
NCN45 across Peckforton Hill at risk of being closed
Created by tomguha // 1 thread
Cycle lane on Tooting High Street often blocked by cars
Created by Jim Chisholm // 1 thread
The traffic lights in Gt Shelford (Freestones Corner) are being replaced.
They've already done the DDA compliant paving and the cabling for the new lights is I believe done.
There may be an opportunity for ASBs and approach lanes on at least one of the A1301 approaches. Often motor vehicles turn left across those on cycles with only some 50% of left turning traffic correctly indicating
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Tim P // 1 thread
The current A3 route through Purbrook is very dangerous both northbound and Southbound.
From both directions, there are shared Bus/Cycle lanes, which approaching from the south stop at the roundabout, and from the north stop at the traffic lights before it.
When traveling Northbound, the uphill section past the shops results in a slower moving cyclist, generally holding up Traffic, which causes lots of aggressive, close overtakes, which in a narrow road when "sharing" with HGV's and buses, is not a pleasant experience. Many cyclists therefore jump onto the pavement if feeling unsafe, or do not cycle this section.
When travelling southbound, most of the time the traffic is slow due to queuing for the roundabout, but the narrow, on route cycle route squeezes cyclists between parked cars and slowly moving traffic, directly in the door zone.
Given the remainder of the A3 Portsmouth/London Road corridor is of signficicant benefit to those that commute from Denmead/Waterlooville/Clanfield area towards Portsmouth, this is a real bug bear.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Demolition of an existing sports pavilion, erection of a new sports pavilion, alterations to an existing car park and a vehicular access, a cycle shelter, new flood-lit artificial surfaced sports pitches and associated soft and hard landscaping.
St Marys School Playing Field Long Road Cambridge CB2 8PX
From the Design & Access Statement:
9.4 Cycle Parking
The Cambridge City County Local Plan 2006 Appendix D obligates schools to provide 50% of cycle spaces for children aged 5 to 12 and 75% for children over 12 years old. Under the same Local Plan, the college is obligated to provide cycle spaces for all students plus 1 for every 2 members of the staff.
The proposed pavilion will provide a changing space for maximum 4 teams of 20 players plus 2 staff each, therefore we declare to provide cycle stands for a minimum of 84 bikes.
Current site layout allows for 62 cycle spaces under roof canopy and 64 uncovered stands, therefore exceeds the minimum requirement defined in the Local Plan.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Erection of dwelling following demolition of existing triple garage block. New vehicular access from highway to serve existing dwelling.
4 Cavendish Avenue Cambridge Cambridgeshire CB1 7US
House includes a combined bin and cycle store for three cycles. The space indicated on the drawing does not appear big enough for both bins and cycles. I question whether providing for three cycles is enough considering there is room for at least two cars.
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Redevelopment of St John's Innovation Centre.
Not sure how this application was missed. But we should be aware of what is going on here. There are a few conditions pending consideration which may provide an opening to make comment if we determine the need.
There is a lot of sheltered cycle parking of both two-tier and Sheffield stand variety in several locations around the site.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Erection of 25 dwellings including 40% affordable along with access, car and cycle parking and associated landscaping
Land at Belsar Farm, Willingham
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3145/16/FL
South Cambridgeshire
Application reference : S/3145/16/FL
Created by Monica Frisch // 8 threads
Cycle routes and cycle paths need maintenance. This issue is somewhere to raise matters relating to standards of path maintenance, problems of poor maintenance, and examples of good maintenance.
Created by Ian Dent // 0 threads
There is developer interest in building houses on the existing arable land. Lime Lane (west end) is currently completely unsuitable for cycling. East End with off road cycle route is good. The developer should be encouraged to extend the existing cycle route parallel to Lime Lane to the junction with A608 and then, using a suitable crossing, to NCN.
Created by Cycling Dumfries // 1 thread
It's possible to get to the new shared-use path near the High School from the Caledonian Cycleway/ St Mary's Industrial Estate / Edinburgh Road using cut throughs and back streets but it's not at all clear. A couple of signs on the corner of the Moffat Road / Carnegie St, Greystone Crescent, and the Edinburgh Road and St Mary's Road path entrances, plus a fingerpost at the junction of the three paths at the foot of the Caledonian Cycleway would be really helpful to make the most of this developing off-road network
Created by Cycling Dumfries // 1 thread
Torthorwald is only a couple of miles from Dumfries but very few people are willing to cycle on the Lockerbie Road/ A709. An off-road path running parallel to the road down to Heathhall forest would connect up with the Caledonian Cycleway and provide an accessible route into town.
Created by Colin Wing // 1 thread
Proposal for the introduction of two-way traffic operations on Brook street (between Bond Street and Grosvenor Square) and Davies Street (between Brook Street and Berkeley Square)).
Created by goodlegs // 1 thread
More than once I have been waiting at Warburton Road as it meets Mare Street for a break in traffic so that I can cross to Tudor Road (which is filtered for motor traffic so a nice way to reach Victoria Park) when a car behind me has been very agressive. On one occasion I was "nudged" by the driver literally driving into my back wheel.
I think the aggression stems from:
a) drivers using this route precisely because they are in a hurry / rat running to avoid the traffic lights on Mare Street, so not being willing to be held up
b) drivers not understanding "why doesn't he go?" when it would have been possible for me to turn left (as the driver wants to). I need enough clear space on both sides of the road to go straight across.
Created by MJR // 1 thread
This area is proposed for development. It is of strategic interest because access will almost certainly cross National Route 1 and it would be good to have very good cycling connectivity to avoid adding unnecessary cars to the roads in this area.
Created by jpennycook // 2 threads
Outline application for up to 150 new homes and to include access
Land At Redlands Reading Road Sherfield-on-Loddon Hampshire RG27 9EA
Basingstoke
Application reference : 16/02457/OUT
Created by George Reeves // 0 threads
This is pointless and dangerous ASL it encourages cyclists to squeeze between large vehicles(anything transit van and above) There is the added danger of the railing a relic from when a secondary school stood on this corner.
Created by M Stanley // 1 thread
Message from Cycling UK:
It has been brought to Cycling UK’s attention that an exciting new bicycle project is under consultation in your local area of Leeds, which would benefit from supportive comments from local cyclists.
You can submit your comments up until the 16th December.
The project is the conversion of a Local Authority owned golf course (Middleton Park Golf Course ) into Leeds Urban Bike Park. The vision is that the Bike Park will eventually comprise a number of progressive trails for all levels of cyclist, plus BMX and play tracks, together with a community building providing a café, bike hire and maintenance facilities and other community use spaces.
It is proposed that the facility will be operated and managed by Cycle Pathways, a Community Interest Company Limited by guarantee.
Cycling UK would like to thank you in advance for taking time to submit your comments on this wonderful project proposal in Leeds.
Respond to the planning application:
Full details and documents:
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Erection of extensions to Norfolk Building for common room, 16 student rooms, college offices and research space, cafe and kitchens; erection of 6 family accommodation units; landscaping and cycle parking following demolition of maisonettes.
St Edmunds College Mount Pleasant Cambridge CB3 0BN
"The College currently has 304 cycle parking spaces that includes 146 Sheffield hoops providing 292 spaces and 12 single V stands. The current proposal is to add a further 22 Sheffield hoops under a cycle shelter providing a total of 348 cycle spaces."
Created by Roxanne (Cycling Campaign Officer) // 1 thread
The proposal comprises the conversion of the existing end terrace known as No.48 New Square and will comprise of 3No. self-contained flats, the demolition of the existing garage and the erection of 1No. self-contained studio-flat and the removal of 4No. Parking bays accessed via Willow Walk and the erection of 1No. self-contained flat. All with associated landscaping and access arrangements.
48 New Square Cambridge Cambridgeshire CB1 1EZ
" Cycle Parking
Cycle parking has been designed in accordance with the Council’s current standards - Cycle Parking in Residential Developments (2010). The new flats are to be provided with a communal covered and secure cycle store within the building fronting Willow Walk. Access will be solely via New Square through the communal garden.
The store will be fitted with steel Sheffield cycle stands spaced in accordance with Diagram 3 of the above guide. Access gates are to be a minimum of 1m in width where required, and fitted with mortise locks."
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Change of use of HMO and takeaway to a three storey rear extension, and roof extension to form 3no new flats. New rear annexe to create a further 2no flats.
61 Norfolk Street Cambridge Cambridgeshire CB1 2LD
Application reference : 16/1916/FUL
Very little description of cycle parking. The drawings look like "wheel-benders". Only 9 spaces.
"The area will consist of a grass area and the planting of a central tree. Footpaths provide access the rear building and to the proposed cycle stand."
"Access to the ground floor flat to 61 Norfolk Street is via an existing entrance door. Access to the rear courtyard, bin store and cycle stand is via a newly formed security gate and passage at ground floor level."
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Erection of 3.No four bed houses, internal access road, car and cycle parking, hard and soft landscaping.
Land Rear Of 268 Queen Ediths Way Cambridge CB1 8NL
Application reference : 16/1919/FUL
"CYCLE PARKING
Cycle parking has been designed in accordance with the Council’s current standards - Cycle Parking Guide for New Residential Developments (2010). The new dwellings are to be provided with cycle storage within the integral carport. This is of sufficient size to accommodate a total of at least 4 cycles."
Created by Sam Wakeling // 0 threads
Through traffic drives along South Road and goes down Parsonage Crescent as a short-cut to access Walkley Bank Road rather than going down to the turn opposite The Florist.
On an evening peak this is done by about 1/3 of all the outbound traffic on South Road (220 out of 670 motor vehicles per hour). In the evening peak cycle traffic is almost exclusively outbound, with 87% using this route from South Road and down Parsonage Crescent.
Stopping motor access to the top of Parsonage Crescent would remove traffic from this narrow residential street and also create a safe and convenient way for people cycling to access South Road up from the Rivelin direction without needing to cycle up Walkley Road, crossing the difficult turn at The Florist, which has heavy traffic and no protected space.
As with all routing of motor traffic away from a route of maximum convenience it should show some level of traffic evaporation from the area. The current pedestrian crossing on this arm could be removed as no motor traffic would have to be crossed.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Matthew // 2 threads
On 1 January 2026, historic routes in England that aren’t properly recorded will be lost to the public forever. We are looking for people to volunteer their time to help us identify and register these routes before it is too late.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Stephan Matthiesen // 1 thread
The chicane at the west end of the Magdalene Glen path interrupts the flow when going uphills, particularly unpleasant for people with weak knees. It also forces cyclists uphills often to stop and start when there are other people going through, as it's not wide enough to pass.
It doesn't serve any useful purpose at it is on the top of the slope where cyclists are very slow anyway. As it's uphills, there is little danger that e.g. kids run out onto the wide pavement of Duddingston Pk South. Cyclists from the West are slow at this point anyway as they turn into the path.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.