Potters Bar to South Mimms research institutes
A possible route from Potters Bar via Dame Alice Owen School, NCN12 at South Mimms, Cancer Research at South Mimms and then on via Blanche Lane to join the existing cycle path alongside the A1.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Adam Edwards // 1 thread
A possible route from Potters Bar via Dame Alice Owen School, NCN12 at South Mimms, Cancer Research at South Mimms and then on via Blanche Lane to join the existing cycle path alongside the A1.
Created by Adam Edwards // 1 thread
Porposed but never built links between the Royal Veterinary College and Potters Bar and Brookmans Park stations. The route parallel to the railway exists as a footpath which would need upgrading to a bridleway with good surface and ideally lit to allow all year use. (Vets work well beyond 9-5)
The Alban Way is unlit and isolated from main roads. Thus it does not provide a safe commuter route in the winter months.
WelHatCycling believes there should be an all year route alongside the A1057 along the route shown, linking Hatfield to the St Albans Green Ring at Fleetville and then continuing in to the city centre.
This will be a challanging route where streets are narrow and car use is high. The priority therefore might be University of Hertfordshire - Oaklands College - Fleetville to encourage cycling to these two key educational institutions.
Created by Adam Edwards // 1 thread
WelwHatCycling believes there should be shared use pavements along Digswell Road to link the north of the town to the town centre. This would connect to our proposed North - South and East- West routes described in other entries.
Created by Adam Edwards // 1 thread
The cycle route from WGC to Hertford is an unlit isolated former railway. Whilst an excellet ride on a sunny Sunday, it is of little use in the dark winter months for cycle commuting.
The route shown would comprise:
A new shared use pavement along Cole Green Lane / Birchall Lane from the end of the current cycle path to the A414.
A light controlled crossing of the A414 or bridge.
Signed us of the Old Coach Road to the outskirts of Hertford.
Shared use pavement plus signed routes into the centre of the town.
Created by Adam Edwards // 1 thread
The east side of WGC is currently served only by the NCN61 route. In 2014 work was done on Heronswood road to add safety markings due to high incidences of accidents involving bikes. There are local concerns about cyclists using pavements to avoid busy local roads.
There should as a minimum be a route from WGC station to the new QE2 hospital, ideally directly via Woodhall shops. The other routes show other useful possible links to create a cohesive network to serve this section of town.
Created by Adam Edwards // 1 thread
A long standing missing link in WHBC area cycle routes. The current Bessemer Way cycle path ends where the road becomes a busy dual carriage way. There is no off road cycling link to Welwyn village which prevents the children of the town cycling to Monks Walk School (yet it is possible for Hatfield children to get there virtually the whole way on cycle path!)
Created by Adam Edwards // 1 thread
This route would use a combination of 20 mph road (Fretherne Road, Stonehills) plus upgraded crossings to create a north south route through the centre of Welwyn Garden City. It would share a common section around the Welwyn Hatfield Borough Council Offices and the Campus with the east west route described in another section.
The route would link NCN57 south of the town with the existing link from Campus East to Shirepark, thus enabling commuters from this business park to access the station. Going further north the link over the White Bridge would then open up the quiet residential streets of north WGC for cycling to and from the town centre. Via the east west route their would be a better connection to NCN12 avoiding the busy Parkway.
Created by Adam Edwards // 1 thread
Welwyn Garden City has no off road town centre cycle routes. This east west route would link the network of cycle paths to the east of the town centre to NCN12 to the west and enable cyclists to avoid The Campus, a deceptively green gyratory which is difficult for cyclists to navigate.
It would connect with a north south route at the Welwyn Hatfield Borough Council offices, encouraging staff to cycle to work. It would encourage commuters to cycle from west WGC to the station and to work places off Broadwater Road and at the Mundells.
Created by Adam Edwards // 1 thread
The Sustrans map erroneously shows part of this route as an on road cycle path. No such path exists.
The Common is one way south west bound. In order to spare cyclist having to use the on road cycle lane on Queensway which is badly engineered, especially at the Woods Ave roundabout, WelHatCycling believe there should be a contraflow cycle lane or shared use pavement along this route, extending accross Lemsford Road and connecting with the existing cycle path on St Albans Road West. This would create a route through the town centre to connect north and south Hatfield.
The photo shows the north end of the Common as currently arranged for cycling.
Created by Adam Edwards // 1 thread
Just two (2!) metres of tarmac would legally connect Dellfield Road to the Woods Ave cycle path. With no other work than this it would allow cyclists heading west to avoid the nasty on road cycle path along Queensway parallel to this route.
Ideally works would also be done to allow cyclists heading east to use this route and then continue along the planned Queensway cycle path (see other entry) to avoid Queensway entirely.
Created by Adam Edwards // 1 thread
Hertfordshire County Council announced plans in 2014 to improve the walking route from Hatfield town centre to the railway station. We lobbied successfully for the section from the Market Place toucan to the French Horn Lane pelican crossing to be reubuilt as dual use, completing a vital link from the station to the University.
This would be even better if officially extended round the skateboard park and accross Link Drive to join up with the Woods Ave off road cycle path, thus enabling cyclists to avoid the dangerous roundabout at the junction of Woods Ave and Queensway. This is shown in the map to the west (left) end of the route shown.
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by Roxanne (CEO) // 3 threads
Thread for County Council Economy and Environment Committee meetings
http://www2.cambridgeshire.gov.uk/CommitteeMinutes/Committees/Committee.aspx?committeeID=74
Created by Chris Peck // 1 thread
Woodside Park is a commercial area which the developers wish to turn into an 87 dwelling residential area, comprised of 61 flats and 26 houses, with up to 235 residents. An additional office space area could also be turned into a further 20 2-bed flats, resulting in a total of 107 dwellings.
The developers' transport assessment suggest this:
"Whilst there are no formal facilities for cyclists, the local roads are suitable for use
by cyclists, and Catteshall Lane is identified as a recommended cycle route by SCC
and Sustrans. This cycle route links with Godalming town centre and Godalming
railway station, which is approximately five minutes from the site by bicycle."
This is patently not true, as the route to Godalming station via the town centre is one-way!
Car parking
135 car parking spaces are planned, however, the assessment suggests that, comparing equivalent car ownership in the local area, only 86 spaces are actually required (because there are only 0.8 cars per flat in central Godalming, and 1.42 cars per house).
While it is accepted that a few extra spaces are required for visitors, is 56% extra parking really needed?
Cycle parking
No numbers are provided, but houses are expected to accommodate cycles in sheds or garages, while there will be covered cycle storage for the flats.
More detail is required on how secure this storage will be.
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
Created by Chris Peck // 1 thread
With the welcome completion of the cycle path linking Marshall Road to Bridge Road, the weaknesses of links on either side of the route become more apparent.
Bridge Road is a busy, narrow main road. Traffic mostly has to wait behind cyclists, creating uncomfortable conditions for all but the brave. Both roundabouts (at the Chalk Road/Meadrow and the Bridge Street/Wharf Street junctions) are difficult for cyclists (and pedestrians).
An alternative route, either running parallel to the road (a widened shared use footway?) or a raised boardwalk across the Lammas Lands, are alternatives, but both are expensive, challenging options, which require new or wider bridges over Hell Ditch and the River Wey.
Created by Bracken VanRyssen // 1 thread
The path between Smith's Wood and Water Orton could be a key cycling and walking link and a way to avoid the only other crossing of the A452 and M6, which is the busy and fast Water Orton Road. However the route is blocked off with concrete blocks and is in an extremely poor state of repair with overgrown bushes and an exceedingly unpleasant subway.
Martin Lucas-Smith // 3 threads
The City Council has been working on a City Centre Access Strategy to deal with the problem of obstructions, including inconsiderately-parked bikes. This is to be considered formally by a City Council Committee.
Created by Jon_B // 0 threads
There are currently (29/06/15) temporary 3 way traffic lights in place at the junction where Rope Walk meets St Helen's Street.
This is normally a really painful junction for people cycling from Rope Walks onto St Helens Street at busy times with long waits for a gap in traffic and bad sight lines, particularly where west-bound traffic backs up leaving a gap at the yellow box junction so that people cycling have to venture out halfway across the road to see if there is any traffic coming east-bound.
The lights make this considerably easier and would be worth considering as a permanent signal.
Created by Iain Lane // 2 threads
Dear Consultee,
Nottingham City Council (Radford Road Area, Nottingham) (Prohibitions of Waiting and Parking Places (Specified Classes of Vehicles)) Traffic Regulation Order 2015 (TMP 7115)
Please find attached a consultation letter and associated drawings, SN/TMP7115/01/A, SN/TMP7115/01/B and SN/TMP7115/01/C which relates to the above Radford Road Area, Nottingham – Traffic Regulation Order (TMP 7115).
Created by Dawes Jaguar // 0 threads
The pointless pedestrian gate here is really awkward for pedestrians and cyclists alike, as it's hung on the wrong post and the area of bitmac that has been laid for it is ludicrously small. This area normally ends up a muddy mess in the winter. People simply don't move in sub one metre angular movements, shunting back and forth to avoid the grass. Note the track in the grass that shows what one cyclist did shortly before the Google car got there.
Remove all three gates and replace them with a removable bollard.
Created by Dawes Jaguar // 0 threads
There are regular collisions at this junction because motorists speed on Bournville Lane and the site-lines are very, very poor. The simple solution is to change the priority. This would solve the problem for motorists, and make it easier for cyclists to use Hay Green Lane as part of a cycle route.
I have suggested the change of priority to BCC but was given a list of excuses why this cannot possibly be done. One of these was that Bournville Lane is a blue route. I see no benefit in an emergency journey ending here because someone pulling out of Hay Green Lane couldn't see the approaching police car.
Created by Dawes Jaguar // 0 threads
Cotteridge town centre has been allowed to degenerate into a hostile place for cyclists and pedestrians. Motorists have multiple lanes for driving and parking, whilst pedestrians are blocked from crossing the road by steel railings. Cyclists are given nothing. Watford Road and Rowheath Road are both OK for cycling, but their junction with Watford Road is horrendous. Midland Road has no contra-flow, so it is obstructive to cyclists trying to avoid the multi-lane horror of the Pershore Road. The two lane double-roundabout is difficult to negotiate even in a car.
This whole area needs to be redesigned, putting cyclists and pedestrians first. I'm sure I'm not the only person who doesn't shop in Cotteridge because the environment is /vile/.
Created by Dawes Jaguar // 0 threads
Birdcage Walk is fitted with Cycling Prohibited signs and barriers, yet it is as wide as some roads. Talking to a PCSO on a bike I saw cycling there, he told me Cadbury's were happy for people to cycle on Birdcage Walk if they did so responsibly. So how about replacing the signs with "Share with Care" signs, and the barriers with bollards spaced wide enough to allow cyclists through but not motor vehicles?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.