Rat-running in Canterbury Street
The City Council believes there are rat-running issues here.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 1 thread
The City Council believes there are rat-running issues here.
Martin Lucas-Smith // 10 threads
Various issues relating to enforcement of taxis in Cambridge (the line shown on the map being the worst area)
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
A section of the road now has a TRO restricting all motor vehicles without a VIP parking pass. Cycling is permitted on this section, but there are no signs to confirm this. The road still part of NCN55.
Created by David Earl // 5 threads
There is a great shortage of cycle parking in Cambridge City Centre. The cycle parks have been very successful, but the promised 500+ spaces at Grand Arcade actually only delivered around 250.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Martin Lucas-Smith // 1 thread
Discussion of cycle training issues in Cambridgeshire.
Created by David Earl // 1 thread
Dear CCC,
In light of the recent news of a cyclist being injured by a motorist whilst on the off road cycle path on Barton Road (http://www.cambridge-news.co.uk/Cambridge/Driver-who-knocked-over-cyclist-keeps-his-licence-16012012.htm) I was wondering if the CCC is campaigning for a reduction in the speed limit along Barton Road? I think (but am not categorically sure) that Barton Road remains the last main road into Cambridge with a 60mph limit.
Barton Road suffers from two problems with speed: heading out of town motorists accelerate from 30 to 60 after the speed camera; and heading into town motorists are coming off the motorway and are used to such speeds and continue to drive way over the 60 limit.
According to the http://www.crashmap.co.uk/ Barton Road has seen several fatalities and many accidents recently.
Sincerely
Barnabas Baggs
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by Richard Moss // 3 threads
Planning application submitted for housing near the primary school and a mixed use housing plus retail development at Unwin Square, east of the Permier Inn. Concerns about provision for cycle parking contained in the plans submitted.
Created by Robin Heydon // 1 thread
Proposed package: Streamlining bus services through Cambridge city centre
A package of measures including some of the following is proposed:
• Cambridge Core Scheme extension – potential remove all traffic but buses and cycles from St Andrews Street north of Emmanuel Street through the day.
• Address taxi overcrowding in St Andrews Street.
• Remove / relocate some on-street parking in Jesus Lane.
• Bus priority measures along Chesterton Road
• Improved bus stop infrastructure in Hobson Street and Jesus Lane.
• Removal of some parking on Histon Road and Station Road.
• On Street ticketing at busy or constrained boarding points to reduce bus standing time and pedestrian congestion.
• Enhanced enforcement of infringements on key bus routes and stops.
• Rerouting of some buses away from Bridge Street / Magdalene Street.
• Park and ride capacity enhancements
• Rural interchange enhancements on longer routes benefiting from the city centre improvements.
ATM proposed next to Hills Road cycle lane
Martin Lucas-Smith // 3 threads
The LSTF is the funding from government for sustainable transport for the region. This issue covers discussion of the bid.
Martin Lucas-Smith // 2 threads
Planning application by Sainsbury's on Mill Road - various issues.
Created by Simon Nuttall // 1 thread
I'll hang a thread off this general issue where we can share news - at least while we transition to using this new system.
Created by Heather Coleman // 1 thread
The planning application has the promise of new, extra cycle parking, which should be good news. However, details are scant to say the least and as new jobs will presumably be created, I fear it will do nothing to alleviate the chronic shortage of cycle parking on site, especially at this location at the rear of the Concourse, and a place of choice to park if you have cycled from Trumpington.
Warrington Cycle Campaign have produced a leaflet aimed at improving the mutaul understanding of cyclists and bus drivers points of view.
It is called "Bus Drivers & Cyclists in Harmony"
We hope to promote better relations between the two groups via a similar leaflet. The key goal is safety but enhanced respect by both parties would be of benefit.
We have serious concerns over the standards of driving of certain classes of vehicles in Cambridge.
We have an opportunity to push for both bus companies and and local authorities to train their drivers to a higher standard
Under the 'Certificate of Profession Competence' drivers of certain classes of vehicle are required to undertake 'continuing training'
There has been an article in Local Transport Today about training in London. see:
http://www.transportxtra.com/magazines/local_transport_today/news/?id=29476&StartRow=1
"A COURSE designed to cut the number of lorry accidents in urban areas, particularly those involving cyclists and pedestrians, has gained industry accreditation.
The ‘safe urban driving’ (SUD) course developed by Transport for London and London boroughs has been accredited by the Joint Approvals Unit for Periodic Training, the body set up by the sector skills councils for freight and passenger transport to manage the driver Certificate of Professional Competence (CPC). "
"EU directive 2003/59 requires lorry and van (over 3.5 tonne) drivers to obtain a CPC by completing 35 hours of training every five years. The requirement came into force in 2009, so the first deadline is September 2014. "
"The second half of the course sees the lorry drivers get on bicycles and go on-road to understand how cyclists position themselves on the road, and how to drive in the presence of cyclists. This module was developed by Cycle Training UK for the London Borough of Lambeth. "
I've already pointed out this scheme to the cycling officers
It may be that we can get the LA's to approach Stagecoach on this issue and it could form part of any 'Quality Contract'
Created by Jim Chisholm // 1 thread
The County is proposing a 'controlled parking zone' to cover a wide area around Addenbrooke's. The exact limits are to be discussed, and issues will arise in area of new housing where the roads are yet to be adopted.
An initial meetimg for stakeholders is to be held at Hills Road VI form college on Thursday February 2nd from 18:30 to 20:30
The map shows the area being studied
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Barriers, so many barriers, most of which should be removed.
Created by Fran Graham // 3 threads
TfL say:
We want your views on proposals to transform roads in Bermondsey, Rotherhithe, Deptford and Greenwich to make cycling and walking easier, safer and more appealing.
Cycle Superhighway 4 (CS4) would provide a continuous segregated cycle route between Tower Bridge and Greenwich, along with new pedestrian crossings, improved public spaces and a host of other improvements aimed at creating a more attractive environment for all users and accommodating the area’s future growth. This consultation does not include proposals for Lower Road, which will be consulted on at a later date (find out more).
CS4 would form part of London’s expanding network of Cycle Superhighways, an important part of the Mayor’s draft Transport Strategy and Healthy Streets Approach, which aim to encourage walking, cycling and public transport, making London greener, healthier and more pleasant.
Summary of proposed changes
Our proposals for CS4 include:
Two-way segregated cycle track on Tooley Street, Jamaica Road, Evelyn Street and Creek Road, providing a dedicated space for people who want to cycle
Five new signal-controlled pedestrian crossings and upgrades to over 20 existing pedestrian crossings, making it easier and safer to cross the road
Building on the recent short-term improvements at Rotherhithe Roundabout by redesigning the roundabout to improve safety as part of our Safer Junctions programme.
Installing a new eastbound bus gate on the Jamaica Road approach to Rotherhithe Roundabout, giving buses priority at the roundabout and improving bus access to Lower Road
New and improved public spaces at Deptford High Street and Rotherhithe Roundabout, including new paving and trees
New traffic restrictions, including banned turns on some side roads along Jamaica Road and at Deptford High Street
Changes to some bus stop layouts and locations, including new bus stop bypasses for cyclists (find out more about bus stop bypasses)
Why are we proposing CS4?
Around 3,500 trips are already being made daily by people cycling along the A200. In addition, this route has some of the highest numbers of pedestrian numbers in London. CS4 is designed to help us meet the target set out in the Mayor’s draft Transport Strategy of changing the way people choose to travel so that, by 2041, 80 per cent of all trips in London are made by walking, cycling or public transport, up from 64 per cent today.
Improving safety
Safety is one of the main barriers to cycling in London. Between September 2013 and August 2016, there were 93 recorded collisions involving cyclists and 49 recorded collisions involving pedestrians along this section of the A200. Our research shows that, were the route safer, more journeys could be made on foot or by cycle.
CS4 would separate cyclists from motor traffic by providing kerbed cycle tracks along its length. At major junctions, cycles would be separated from motor traffic using cycling-specific traffic light phases to reduce the risk of collisions. Our proposals also include major safety improvements at Rotherhithe Roundabout, which was identified as a priority for changes as part of our Safer Junctions programme.
Encouraging active travel in south-east London
Cycling is now a major mode of transport in London. There are more than 670,000 cycle trips a day in the capital, an increase of over 130 per cent since 2000. The introduction of the East-West and North-South Cycle Superhighways has seen a significant increase in cycling as a mode of transport along those routes.
An emerging network of Cycle Superhighways exists in north, south and east London, but none yet in south-east London. Our proposals would bring a high-quality cycle facility to south-east London, encouraging more people to start cycling. Our analysis shows that sections of Tooley Street and Jamaica Road are among the top one per cent of areas for cycle demand in London, while the entire CS4 route is in the top five per cent.
Improving facilities for cycling and walking along the proposed CS4 route would not only benefit those who currently walk and cycle, but could also have a positive effect on public health by increasing the levels of physical activity in the area. Our research shows that sections of the proposed route are in the top one per cent of London’s road network for its potential to switch from vehicles to cycling as a means of transport. The majority of the route is in the top five per cent. There is also great potential to encourage people to switch from making short vehicle trips to walking.
These proposals form part of the Mayor of London’s plan for Healthy Streets. This is a long-term vision to encourage more Londoners to walk and cycle by making London’s streets healthier, safer and more welcoming. Currently, only 34% of Londoners take 20 minutes of physical activity on any given day. The new cycle facilities and pedestrian improvements are designed to help encourage more people to use active and sustainable modes of transport.
Improving places
Our proposals would help connect Bermondsey, Rotherhithe, Deptford and Greenwich, linking important amenities and facilities, making them more pleasant places to live, work, shop and spend time. We would install new seating areas and cycle parking to provide space for people to rest and spend time in these town centres, along with other improvements such as new plants and trees. Our proposals aim to create more welcoming and inclusive streets for individuals and communities to enjoy.
Joined-up improvements to accommodate growth
London is growing and changing, with the city's population forecast to rise from 9 million people today to 10.5 million in 2041. We must find new ways to plan London's growth, including proposals like CS4 to encourage healthy and sustainable transport. CS4 is part of a package of planned and proposed improvements aimed at helping this part of south-east London accommodate expected growth, including the regeneration of Canada Water, recent improvements made to ease congestion at Rotherhithe Roundabout, and the proposed Rotherhithe to Canary Wharf river crossing.
Where would CS4 go?
The proposed route would run along Tooley Street, Jamaica Road, Evelyn Street and Creek Road, linking Bermondsey, Rotherhithe, Deptford and Greenwich.
Lower Road
This consultation does not include proposals for Lower Road, which will be consulted on at a later date. Lower Road is adjacent to Canada Water, an area that will see major regeneration and development in the next few years. To understand how these developments and future transport schemes would affect the existing road network, we have jointly commissioned a Strategic Transport Study with the London Borough of Southwark. When completed, this study will inform the design for Lower Road, ensuring that it meets the future needs of the community.
What is proposed for CS4?
Improvements for cycling
New two-way segregated cycle track on the north side of Tooley Street, Jamaica Road, Evelyn Street and Creek Road replaces some bus and general traffic lanes
Cycle track switches to the south side at the junction with Southwark Park Road to bypass Rotherhithe Roundabout
Proposals for the Lower Road section to be consulted on at a later date
Cyclists bypass traffic light controlled junctions at Abbey Street and Deptford Church Street
Cyclists are separately controlled by signals at all other junctions
Connection to proposed cycling Quietway 14 at Tanner Street (find out more about Tanner Street)
Road design and layout
Some general traffic lane replaced by new two-way segregated cycle track Redesigned and improved geometry of Rotherhithe Roundabout to encourage better lane discipline and assist all through movements
Left turn lane on Jamaica Road extended to reduce queueing time for buses and local traffic trying to access Brunel Road
Removal of some central reservation on Jamaica Road to accommodate new cycling facilities
Mini-roundabout replaces signalised junction at Oxestalls Road
Removal of centre line markings on some sections of Evelyn Street to improve road safety
Making Shad Thames one-way northbound to improve the performance of the junction and reduce pedestrian wait times
Banning the left turn from Jamaica Road into Bevington Street to provide a continuous eastbound bus lane and improve bus journeys
Making Cathy Street one-way northbound to remove through-traffic from residential roads, while allowing a new right turn into Cathay Street from Jamaica Road to improve local access
Making Marigold Street exit-only on to Jamaica Road to improve safety for all road users
Banning the right turn into Evelyn Street from Watergate Street and Deptford High Street, and banning the right turn into Deptford High Street from Evelyn Street
Change to buses
Some bus lane replaced by new two-way segregated cycle track on Jamaica Road, Evelyn Street and Creek Road
New eastbound bus gate on the Jamaica Road approach to Rotherhithe Roundabout to prioritise bus access to Lower Road
Changes to bus stop locations along Evelyn Street
Changes to some bus stop layouts, including new bus stop bypasses for cyclists (find out more about bus stop bypasses)
Improvements for walking
Five new signal-controlled pedestrian crossings, including three along Jamaica Road
Upgrades to existing pedestrian crossings including simpler 8-metre wide crossing outside Bermondsey Station
6-metre wide toucan crossing (for pedestrians and cyclists) outside Deptford Park Primary school
6-metre wide pedestrian crossing on desire line opposite Deptford High Street
Pedestrian crossing on the eastern arm of the Norway Street / Creek Road junction moved to the western arm and widened to 6 metres.
Pedestrian crossing time saving of over 1 minute expected outside Bermondsey Station and at the Jamaica Road junction with Tanner Street
Predicted impacts of our proposals
We are proposing major changes to the road layout to make cycling and walking easier, safer and more appealing. We have considered all road users throughout the design process so as not to have a disproportionate impact on any one group. This section summarises the impacts we predict our proposals to have on different road users.
General traffic and bus journey times
The reallocation of road space is expected to change some journey times and traffic movements. We have carried out traffic modelling to predict how the proposals might affect journey times and traffic movement through the area affected by the scheme. A summary of this analysis is available below:
We would actively monitor and manage traffic conditions following delivery of the scheme. We are investing in advanced traffic signal technology to allow us to better manage traffic depending on differing conditions at any given time, and we are working to improve road user information so people can make informed journey choices before they travel.
Parking and loading
Our proposals for CS4 include changes to the layouts of some of the parking and loading bays along the route. Double yellow lines (no parking at any time) would also replace single yellow lines along some sections of Evelyn Street and Creek Road.
During the consultation period, we will contact premises we think could be affected by these changes. If you think the proposals could affect you or your business, please contact us to let us know (contact details are at the bottom of this page). We encourage you to discuss these proposals with your suppliers.
Environment
Our proposals aim to improve the quality of life in the area by:
Reducing the dominance of motor traffic, allowing people to better enjoy the area
Improving pedestrian crossings and cycle facilities, to encourage more people to walk and cycle through the area
Protecting bus journey times to safeguard public transport as a mode of choice
Although not a traffic-generating scheme, our proposals would change how traffic moves around the area, which may result in some associated and localised changes in air quality and noise levels. Environmental surveys and modelling would take place as part of our ongoing evaluation of these proposals.
Air pollution is one of the most significant challenges facing London, affecting the health of all Londoners. As part of the plans for new measures to tackle London’s current poor air quality, we are consulting on proposals to bring forward the introduction of the London Ultra Low Emission Zone (ULEZ).
A number of other schemes to improve London’s air quality are planned, including taking steps to reduce air pollution from our bus fleet, reducing emissions from taxis and private hire vehicles, setting up five Low Emission Neighbourhoods, and expanding the electric vehicle charging network and making it simpler to use.
We are investing to make London’s streets healthy, safe and attractive places to walk and cycle. Enabling more journeys to be made on foot or by bike can help reduce private vehicle use and associated emissions. Read more about how we are creating Healthy Streets
Equalities
How we fulfil our obligations under the Equality Act 2010
We are subject to the general public sector equality duty set out in Section 149 of the Equality Act 2010, which requires us to have due regard to the need to eliminate discrimination, advance equality of opportunity and foster good relations by reference to people with protected characteristics. The protected characteristics are: age, disability, gender reassignment, marriage and civil partnership, pregnancy and maternity, race, religion or belief, sex and sexual orientation. As part of our decision-making process on the proposals for Cycle Superhighways, we have had due regard to any impacts on those with protected characteristics and the need to ensure that their interests are taken into account.
In considering the design of our streets, we closely consider the needs of all users throughout the design process. On significant infrastructure projects, such as Cycle Superhighways, we:
Complete Equality Impact Assessments (EQIAs) at the outset of the project, to review potential impacts on equality target groups, including disabled people
Carry out public consultations, including targeted engagement with specific users such as (among many others): Royal National Institute of Blind People, Guide Dogs, Age UK, Transport for All, and National Autistic Society
Ensure we comply with established guidance – such as the Design Manual for Roads and Bridges – which includes detailed requirements for disabled people
The EQIA completed for CS4 shows positive impacts for black and ethnic minority groups, females, disabled cyclists, and cyclists under 25 and over 65 years of age. Positive impacts have also been identified for disabled pedestrians, as the scheme involves a number of improvements to pedestrian facilities, including wider footways and new and improved crossings. Some negative impacts have been identified where footways are cut back or shared-use footway is introduced. However, the minimum 2-metre standard for footway widths has been maintained to allow two wheelchair users to pass safely. Kerb-protected cycle facilities, which lead to positive impacts for people with protected characteristics when they are cycling, work most effectively when they feature bus stop bypasses. Bus stop bypasses and their impacts are described below.
Bus stop bypasses
At bus stop bypasses, the cycle track continues behind the bus stop at carriageway level, providing continuous segregation from motor traffic for people cycling. Bus passengers access a waiting area by crossing the cycle track using a raised, marked crossing point. The waiting area would be at least 2.5 metres wide. Pedestrians would cross the cycle track at raised, marked crossing points to continue their journey.
Our research has found that bus stop bypasses are safe for all road users, including bus passengers. Routing cycle traffic away from the road is an effective way to create safe, attractive cycling facilities along bus routes. The risk of conflict between cycles and pedestrians has been found to be very low, while providing a dedicated crossing point for bus passengers and design features that encourage slower cycling help to make the bus stop area more comfortable for everyone to use.
Bus stop bypasses are used across Europe and there are a number of examples in operation or planned across the UK, including in Brighton, Cambridge and Manchester, as well as in London. We introduced some bus stop bypasses on the Cycle Superhighway 2 (CS2) extension between Bow and Stratford in Autumn 2013 and across other Cycle Superhighways in 2015-16.
We are continuing to engage with accessibility and cycling groups and carry out additional research into the type and layout of pedestrian crossings at bus stop bypasses. We have a dedicated working group overseeing on-street trialling of the use of zebra crossings over cycle tracks at bus stop bypasses. This group includes representatives from Transport for All, the Royal National Institute of Blind People, Guide Dogs, Age UK London, London TravelWatch, Cycling Embassy of Great Britain, Living Streets, the London Cycling Campaign and Cycling UK. We will incorporate findings of these further investigations, including the outcomes of discussions about the trial with the working group, into final proposals for CS4.
Find out more about bus stop bypasses
Tactile paving
We would use tactile paving on all crossings and traffic islands throughout CS4. Along the route, tactile paving would be designed according to Department for Transport guidance. Local standards would apply in the London Borough of Lewisham and the Royal Borough of Greenwich.
Accessibility for cyclists with disabilities
CS4 would be suitable for use by disabled cyclists using adapted cycles, such as hand cycles and tricycles. The designs adhere to the principles for inclusive cycling set out in our London Cycling Design Standards. Cycle tracks on CS4 would be as wide as possible and a smooth riding surface would be provided, with the entire cycle route to be resurfaced.
Next steps
We will analyse and consider all of the responses received to the consultation, and expect to publish our response early in 2018.
For the Lower Road section, we have jointly commissioned a Strategic Transport Study with the London Borough of Southwark to understand how developments and future transport schemes would affect the existing road network. When completed, this study will inform the design for Lower Road, ensuring that it meets the future needs of the community. Consultation on proposals for Lower Road will take place at a later date
Subject to the outcome of consultation and agreeing proposals with partner boroughs, we would aim to commence construction on CS4 in late 2018. We would plan construction carefully to minimise disruption to those who live, work and travel through the areas.
As part of this planning, we would coordinate closely with other construction works in the area, and consider alternative ways of working including advance works, weekends and evenings. We would also carry out an extensive communications and engagement campaign to ensure residents, businesses and others travelling through the works areas have the information they need to plan ahead and adapt their travel arrangements where necessary, reducing any impact on their journeys during the construction period.
Created by Sam Saunders // 1 thread
Vauxhall Bridge between Coronation Road and Cumberland Road has a channel provided for wheeling bicycles on one side of its stepped sections. The channel is so narrow and so close to the railings that a bike can only be wheeled along it at a severe tilt. In addition only one side has a channel so wheeling the bike in the opposite direction has to be done from the wrong side of the bike, making it even more awkward.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by North Devon Cycling Forum // 0 threads
Removal of difficult barrier on cycle path NCN3 ending on Rose Lane; hardly possible to pass by bike, let alone trikes/tandems/mobility vehicles,
note this is NCN!
Created by Dawes Jaguar // 0 threads
This crossing is a problem for all road users, and it's quite common to hear blaring horns and screeching tyres. Pedestrians have a Puffin crossing, but for cyclists there is nothing. There is good reason for cyclists to cross Linden Road here, as it connects the bulk of the Bournville housing with the Worcester and Birmingham canal and the Rea Valley cycle route, and the motor traffic levels on Mary Vale Road are tolerable. Linden Road, on the other hand, is busy with motor traffic, including trucks. So the crossing needs to be improved, especially for cyclists heading along Mary Vale Road. Helpful to cyclists would be changing the priority in favour of Mary Vale Road. This would also encourage motorists to slow down on Linden Road. Unravelling routes in this way (so that cyclists cross main roads at a right angle and giving the cycling route priority) is one of the ways the Dutch encourage people to cycle rather than drive. Other possibilities are traffic lights or a mini-roundabout.
Created by Alex Jenkins // 1 thread
The consultation page states "A review of the Cheshire Street North 20mph zone has been undertaken and a number of improvements have been suggested making the roads safer and encouraging more walking and cycling in the area. The proposals include new cycle facilities, a one-way system on Wood Close, road closures and new crossings, as well as planting new trees in the area."
Link here: https://www.pclconsult.co.uk/projects/cheshire-street/
Created by Finlay KM // 1 thread
Cambridge Biomedical Campus (CBC) is currently in the process of developing a new wayfinding system for the communal, external spaces within the campus. This system will include new maps and signage to improve navigation in public spaces for staff, patients and visitors to the site and help to reduce stress when visiting the campus. In order to fully understand how the campus is currently used and the key issues, we would like to gain your invaluable input.
Note that the new wayfinding system will be focussing on the public space rather than the internal space of individual buildings, please limit your feedback to your experience of finding your way through the external public space on campus. Thank you in advance.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Shaun McDonald // 1 thread
http://www.travelipswich.co.uk/what-is-happening-and-where/orchard-street-area/
What’s Proposed:
January 2014
* New cycle facilities to allow cyclists to travel northbound on Orchard Street.
* A 'No Entry except for cyles' sign to be placed on the St Helen's Street/Orchard Street junction.
Created by Roxanne (CEO) // 1 thread
A children's hospital is planned for the Biomedical Campus (Addenbrookes) and is planned to open in 2025.
Anon // 0 threads
The cycle parking on Parliament Street is great even though there isn't enough of it on a weekend, but when events are on such as the Christmas Market or Food Fairs it's a nightmare to get your bike down Parliament Street past the crowds of people to only find all but one row of racks is blocked by tents. It would be much better if all the racks were moved down to the Pavement end of Parliament Street.
Created by MikeC // 1 thread
As part of the highways 'improvements' associated with the proposed New Monks Farm development in Lancing, the existing minor road N-S crossing of the A27 by the Sussex Pad (Coombes Road to Old Shoreham Road) is to be closed and replaced by a large multi-lane light controlled roundabout some 400m west of the existing crossing. The only assistance for vulnerable road users will be several Toucan crossings as part of the roundabout light controls.
Net result will be an additional 1km diversion for anyone going south into Shoreham, plus additional time waiting at Toucans. An underpass on the existing crossing alignment would be the preferred solution, as recommended in IAN195.
Created by Kevin Ablitt // 1 thread
Twice in the past week I have been cycling up St Johns to make a rh turn onto Cauldwell Hall and nearly been taken out by a driver taking the corner too fast as they travel north bound along Cauldwell Hall and turn down St Johns Rd.
The problems are too fast traffic on Cauldwell Hall and poor design at that junction , need an island to separate traffic.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Jean Dollimore // 3 threads
From time to time, we receive consultations on Play Streets and rather debating each one as it comes in, I think it could be helpful to have a policy as to whether CCC want to respond as a group and the position we should take.
Play Streets are achieved by the occasional closures of a stretch of road to enable children to play (e.g. twice a month for a couple of hours).
The road closures are usually operated by local residents using ‘road closed’ signs, advanced warning signs and barriers.
Play Streets are not directly connected to cycling. But, as they may give people an idea that it would improve the area to have longer term road closures, I would like to support such schemes.
Hamish F // 1 thread
Quoting from the proposal: "This short section will provide an initial link from the A105 major scheme to the Salmons Brook cycle route." Part of Quietway 18.
The main feature is an improved junction at Bury Street West and Church Street, with a 2.5m wide two-way cycle track to take cyclists from that junction to Blakesware Gardens (and onto the Salmons Brook cycle route).
Also some rain gardens and other improvements.
What's not to like, comments please ...
Created by George Coulouris // 7 threads
This issue is intended to act a repository for material that can be used to back-up the LCC's 2014 Local Election Campaign 'Asks'. There are 6 'asks' that were finalised and agreed at the LCC's AGM on 19 October 2013:
1. Safe routes to schools
2. Areas without through motor traffic (AWTTs)
3. Protected space on main roads/major junctions
4. Safe cycle routes via parks and canals (Greenways)
5. 20mph speed limits
6. Liveable town centres
so we'll have 6 threads under this Cyclescape issue where we can collect explanations, discussions and most importantly concrete illustrations of what is meant by each ask.
Created by cpax // 2 threads
This ancient right of way is used by cyclists ,horse riders and walkers and is becoming un approachable with no drop kerbs and
with new roads being built that ignore the existence of this route and lack of clear signage , we are in danger of losing this
important route .
Created by Chris Peck // 1 thread
With the welcome completion of the cycle path linking Marshall Road to Bridge Road, the weaknesses of links on either side of the route become more apparent.
Bridge Road is a busy, narrow main road. Traffic mostly has to wait behind cyclists, creating uncomfortable conditions for all but the brave. Both roundabouts (at the Chalk Road/Meadrow and the Bridge Street/Wharf Street junctions) are difficult for cyclists (and pedestrians).
An alternative route, either running parallel to the road (a widened shared use footway?) or a raised boardwalk across the Lammas Lands, are alternatives, but both are expensive, challenging options, which require new or wider bridges over Hell Ditch and the River Wey.
Created by David Butler // 3 threads
The Bridgewater Way aims to provide a high quality route for walkers and cyclists over the complete 65km length of the Bridgewater Canalbetween Runcorn, Leigh and Manchester City Centre. The cornerstone of the project is a major upgrade to the canal towpath, which as well as greatly improving conditions for pedestrians, will make it easier for cyclists to use the tow path.
The Deansgate / Whitworth Street West Street junction is also proposed to be revised to provide toucan crossing points and easier access to the canal from Whitworth Street West withsignal controlled cycle movements running past Deansgate station. The proposed works at the
junction are also intended to provide improved “on street” facilities to assist cyclists travelling towards and away from Manchester city centre.
Created by Martin Wheatley // 1 thread
People cycling being abused by drivers for not using cyclepaths, even where they are sub-standard or useless.
Kate Ravilious // 1 thread
Car parking obstructs cyclists travelling uphill, forcing them to stop and start on a steep uphill section, or move into the path of oncoming traffic travelling downhill.
It would be safer to have car parking on the other side of the road.