Westbrook centre redevelopment
There are plans to redevelop the Westbrook Centre to a life sciences campus.
There is a "listening event" today Wednesday 17th May 3pm at St Luke's Church, Victoria Road.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Nick Flynn // 1 thread
There are plans to redevelop the Westbrook Centre to a life sciences campus.
There is a "listening event" today Wednesday 17th May 3pm at St Luke's Church, Victoria Road.
Created by KW // 1 thread
Eight flats, six car parking spaces, eight bike parking spaces. Access from Cherry Hinton Road, within the queue region for the 'Robin Hood' junction, across the existing shared-use path.
sound+fury // 1 thread
Change of use of first, second and third floors from office (Class E) to student accommodation (Class C2) comprising 8 student rooms and ancillary facilities. External works comprising the installation of an external staircase and entrance, PV panels to the roof and an Air Source Heat Pump at ground floor level. Installation of two openings into the listed wall for means of access and daylight to the rear.
First Floor And Second Floor And Third Floor 98 Regent Street Cambridge Cambridgeshire CB2 1DP
Cambridge
Application reference : 23/01701/FUL
Created by Ruth Corns // 1 thread
I noticed that on the plans for the ongoing Milton Road development, the plan for a new double split cycle/pedestrian crossing across Milton Road near Chesterton Hall Crescent/Ascham Road has the cycle crossing on the East side and the pedestrian crossing on the West side. The problem with this is it is the opposite way round from the way cyclists/pedestrians approach the crossing from Chesterton Hall Crescent (cyclists on the West, pedestrians on the East). In the mornings, this crossing is extremely busy with pedestrians and cyclists travelling from South to North (to reach Milton Road primary school and Chesterton Community College), and at the north side of the crossing, cyclists need to be on the West side to travel up Ascham Road and the pedestrians tend to walk on the east pavement. The new crossing plan would mean cyclists having to cross the flow of pedestrians on both sides of Milton Road. This would lead to queues of bikes on the crossing (in the road) and seems quite dangerous. I think it would create a natural flow if the crossings were switched to have the cycle crossing on the west (and this is how cyclists and pedestrians naturally organise themselves on the current toucan crossing)? I've included a photo where I've drawn arrows showing the cyclist/pedestrian flow lines in the current plan and if the crossings were switched. It hasn't been built yet so I wondered if there is a way to suggest this to GCP and do you think a change would be considered at this stage?
Created by cpax // 1 thread
Hi ! , I am writing to you to voice my concerns that the Bridleway ( Mile Road ) between the Roman Road and the A 1307 is
under threat .
As a regular user of this route ( cycle ) I first noticed that the finger post on the A 1307 had been removed some weeks ago
and on passing that way today found mounds of earth had been pushed up to the large gate making it almost impossible to
pass through . This route is heavily used by people wanting to go from Fulbourn to Babraham or just for walking . It is a well
defined route on all the maps / cycling Apps . I am incredulous that this threat to this route can so easily be blocked .
Created by Anna Williams – Head of Campaigns & Engagement // 4 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for commitments to active travel and sustainable transport.
Hybrid Planning Application at Land South of Coldhams Lane comprising: Full Application for 'Parcel A' Building 1 (Use Classes E(g)(i) (Offices), E(g)(ii) (Research and Development)) and the Hub Building (sui generis) with associated car and cycle parking, Outline Application for the remainder of 'Parcel A' for E(g) uses including office, research and development, car and cycle parking, landscaping, infrastructure and associated works, with all other matters reserved except for access, Full Application for ecological enhancements to 'Parcel B', Full Application for landscape improvements and access to 'Parcel C'.
Land South Of Coldhams Lane Cambridge Cambridgeshire
Cambridge
Application reference : 23/01683/SCOP
Created by Heather Coleman // 1 thread
Temporary fencing, for no apparent purpose, that then becomes a hazard as it falls over or degrades.
Created by Jonny Camp // 1 thread
How can we tell whether a bicycling environment is good or bad? How many times have you been cycling along a piece of existing infrastructure only to find the word 'end' written on the pavement and yourself forced back onto the road into traffic?
With this in mind, I am undertaking a piece of research as part of my masters dissertation at Queens College, University of Cambridge. I am gathering primary data of existing users of the current cycling network across Cambridge. From this data I will be able to assess the coherence and directness of the existing cycle network and identify potential 'bottlenecks' and issues from the point of view of the users.
Created by Martin Wheatley // 1 thread
Because of a combination of subsidence and grass tussocks growing through the path, my wife's e-trike tipped over on the Greenway path between Lode and Longmeadow this afternoon. Fortunately she is only bruised and shaken but it could clearly have been a lot worse. I have reported it to Cambs Highways as an emergency.
Unless and until it is repaired, I would advise extreme caution on this section of the Greenway or use the Bottisham Greenway, Tunbridge Lane, Park End and Swaffham Bulbeck High Street instead. The on-road sections of the latter are usually pretty quiet.
sound+fury // 1 thread
The area covered includes the cycle route to Church Road. It may also be useful to look at the cycle parking.
Martin Lucas-Smith // 1 thread
Downing College are proposing to extend and rework the old 'Pizza hut building' on the corner of Parker's Piece.
I can't see any obvious issues other than making sure that sufficient cycle parking is created. I think they are intending to put this within the main college grounds themselves, over the road, which probably makes most sense.
sound+fury // 2 threads
This (apparently) revised draft leaves little/nothing for any other forms of transport and continues a policy of road expansion.
Martin Lucas-Smith // 1 thread
Change of us from Class E to a composite restaurant (Class E) and takeaway use together with external changes
56 St Andrews Street Cambridge Cambridgeshire CB2 3DA
Application reference : 23/00795/FUL.
The plans indicate that the existing heavily-used cycle parking will, at least in part, be removed.
sound+fury // 1 thread
Not much information yet, but Hills Road Sixth Form College are hoping to create a second base to the north/east.
Plaza adjacent to proposed primary school on key phase 1
Waterbeach Barracks Key Phase 1 Primary School Plaza Denny End Road Waterbeach Cambridgeshire CB25 9PA
South Cambridgeshire
Application reference : 23/00872/REM
I haven't spotted whatever it is that is supposed to provide "access for picking up and dropping off pupils". There seems to be a 5-Sheffield toastrack ("exact product TBC") on what looks like the 'drive' (next to 'He' which means heritage surface coarse asphalt). I do not see anything that would encourage use of Bakfiets etc.
Image is a crop from LANDSCAPE GENERAL ARRANGEMENT PLAN
I have noticed that especially since the congestion charge there has been a lot of aggression towards Camcycle in social media comments. Notably on Facebook, Nextdoor, etc. I am aware that angry aggressive people have always been on the internet but I do feel the level has increased since congestion charge notoriety, with many people's opinions degenerating into conspiracy theories about Camcycle and the council.
I do worry about the effect this can have on increasing "us vs them" mentality and increasing aggressive behaviour towards cyclists on the road.
sound+fury // 1 thread
We might need to look at the road layout proposed here.
Created by Richard Holton // 0 threads
Works on the Greenway on east side of the Horningsea Road. No provision for cyclists to pass safely. Only option is to cross at previous pedestrian crossings, though there is no signage to indicate this.
Created by George Lund // 1 thread
Improvements required for safe crossing of walkers, cyclists and horseriders using the main path through the forest.
Created by Gabriel // 1 thread
The County Council is proposing some of those cheap and nasty speed cushions at Birdwood Rd. Link: https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/roads-and-pathways/traffic-regulation-orders/permanent-traffic-regulation-orders#proposed-tro--reference-number-pr--------proposed-speed-cushions-in-birdwood-road--cambridge--9-0
Closing date for comment is 17 March 2023. Email to: policyandregulation@cambridgeshire.gov.uk
Created by Rosamund Humphrey (Admin Officer) // 1 thread
This is a container issue for event threads.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Cambridge City Council have launched this new consultation as part of the Our Cambridge programme which aims to shape the council of the future. This may be relevant to our work because it includes thinking about how the council works with its stakeholders.
sound+fury // 1 thread
A previous application was refused in part because of the cycle parking provision. What's the new one like?
Created by David Green // 1 thread
Are you confident at what to do if something goes wrong with your bike when you're miles from home? Could you repair a puncture by the side of the road? Yes? Great! No need to read on.
No? You may be interested in the following Saturday workshop I am running again. This will be a repeat of the popular workshop held last year where attendees gave feedback such as:
"Excellent - would recommend it to all inexperienced riders."
"Following the course I really feel I understand the workings of my cycle."
"It was very clearly explained and covered very useful topics."
"Thoroughly informative workshop. To be highly recommended."
David Green
===
Survival Skills for Cyclists
Venue: Coleridge Community College, Radegund Road, Cambridge CB1 3RJ
Date: Sat 25 March 2023, 10am to 4 pm
Description: A one day bike maintenance course for local cyclists. Bring your bike and get confident you can cope with common roadside cycling breakdowns. Women members especially encouraged to sign up! Places are limited to ensure you learn in a small friendly group and get all the assistance you need. Topics will include: checks before you set off, tools to take along, fixing punctures, handling chain problems, gear and brake adjustments.
Equipment: Your own bike to work on, pump, puncture repair kit, and any tools you normally ride with.
Refreshments: hot and cold drinks provided, but please bring your own lunch!
Fee: £20 (CTC and CamCycle members) £50 (non-members). Subsidy available for those on a low income - please don't be put off by the price. Primarily funded and supported by CTC Cambridge.
Enrolment: To book a place, email da...@guertler-green.co.uk with subject 'Survival Skills for Cyclists 25 March 2023'.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by SallyEva // 2 threads
Mina Road would be no entry, apart from cyclists, from the junction with Ivy Church Lane. This will prevent northbound traffic entering from Mina Road onto B203 Dunton Road, to prevent stopping on the hatch markings at the junction with the A2 Old Kent Road. This movement can cause congestion and a road safety risk to all users.
Motor vehicles would not be able to use Bagshot Street and Mina Road for access onto the A2 Old Kent Road. The scheme would improve conditions and safety for local residents and cyclists. The reduced amount of traffic will create a safer environment.
Road users who normally would use Mina Road to access the A2 Old Kent Road would need to use Bagshot Street, Albany Road and Shorncliffe Road. The parking and loading bays on the northern side section of Mina Road would remain unchanged.
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by M Stanley // 1 thread
Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.
Created by Jon G // 1 thread
The road outside the Barmy Arms pub, Twickenham Embankment, used to be closed to motor traffic by a single line of posts with cycle logos painted on the road between two of these, clearly showing there is a cycle route there.
Recently this has been replaced with two lines of posts about 3m apart and there are no cycle route markers. This is leading pedestrians to reasonably assume that the area between the posts is for pedestrians only and to stand there in groups with drinks from the pub, creating conflicts with cyclists trying to ride through the area. The existence of the cycle route should once again be indicated by signs or painted cycle symbols.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
Anon // 1 thread
Wandsworth Council in TMO 1644 propose removing the contra-flow segregated cycle track at the eastern end of Putney Embankment to allow a hoarding to be built around the Thames Tideway tunnel construction site. The track will be re-opened when the work is complete, but this could take at least a year. It is proposed that eastbound cyclists join the Upper Richmond road by the Dukes Head pub and then continue on this road. Wandsworth Cycling Campaign objected to this on the grounds that the Upper Richmond Road is extremely heavily trafficked and the proposed diversion involved cycling past a row pf parking bays . This would be very difficult and hazardous for the mix of cyclists using the Thames Path of which this forms part. We asked that the parking bays be temporarily removed and replaced by a 1.5 to 2 m cycle lane separated from the motor traffic by wands or similar. For west-bound cyclists using the narrow lane left on Putney Embankment past the work site, we asked for the installation of 'Do not overtake cyclists' signs.
Created by Caroline Page // 1 thread
Significant domestic car parking in the advisory cycle lane of westbound lane combines with heavy traffic jams to obstruct/block westbound passage to cyclists in rush hour. Generally there is a section of this route where pavement pushing is unavoidable
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by jpennycook // 1 thread
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
Created by TMiles // 0 threads
A short section of cycle path allows cyclists to skirt around the traffic lights when turning left from Westgate into Oxford Place.
However the section ends abruptly in front of on-street car parking and the cyclist is forced to give way to other traffic in order to join Oxford Place.
It should instead lead smoothly into a cycle lane that runs the whole length of this street.
Created by Gipsy Hill // 2 threads
Introduction:
Quietway7 links a cycle route from Elephant & Castle (E&C) with Crystal Palace, and was routed by TfL to be via Dulwich Village, West Norwood (Thurlow Park Road), Gipsy Hill and then Crystal Palace (via Farquhar Road).
The route from E&C southbound is in Southwark (to Dulwich) then is in Lambeth (Turney Road, Rosendale Road/Thurlow Park Road, Hamilton Road, to Gipsy Hill), then goes back into Southwark (from Gipsy Hill to Crystal Palace). Southwark had their part of the quietway consultation approved.
Lambeth delayed their decision to June 2017, and was then subsequently “called in” as there was widespread concerns from both the local community and cycling groups for parts of the route. Cycling groups unanimously objected to the proposed design along Gipsy Hill by: Southwark Cyclists, Lambeth Cyclists and Wheels for Wellbeing. 70% of respondents objected to the the design on Gipsy Hill. Gipsy Hill is a busy Local Distributor Road and bus route. Gipsy Hill has “insufficient road width” for a segregated track. The original proposed design meant motor vehicles “will encroach on the advisory cycle lane” to allow oncoming motor vehicles to pass.
Gipsy Hill Options:
There are alterative options to avoid Gipsy Hill. Southwark Cyclists have supported the design option to follow LCN23 downhill all the way along Dulwich Wood Avenue and then using the other side of Long Meadow (so not using Gipsy Hill), with a new track behind the bus stop.
See navy dashed line on sketch attached (mauve was the proposed Q7 design, red is LCN23)
This design is quieter and safer than using Gipsy Hill, and avoids the proposed dangerous junction Gipsy Hill/ Dulwich Wood Avenue, near the rail station. This integrated design also allows greatest cycle access to local amenities, schools, shops, and parks in Dulwich, West Dulwich and West Norwood. There is interest and outline support from Southwark to explore this option.
Next Steps:
Lambeth are now actively progressing engagement and revised designs for their part of the route, with a new consultation process due in September. There is potential for an improved option at Gipsy Hill, but this is likely to need new additional funding from TfL.
Suggested, to let local Gipsy Hill Ward Cllrs (Lambeth) and College Ward Cllrs (Southwark) and local cycling groups know your views.
Background:
Lambeth proposal that was called-in, see reports:
- Quietway 7 - Elephand Castle to Crystal Palace - Decision Report – 12 June 2017
- Appendix B - Quietway 7 - details designs (Gipsy Hill pages: 23, 46-49)
http://www.cpneighbours.org/gipsyhillquietway/
Thurlow Park Ward Cllr updates:
http://thurlowparklabour.org/post/162548844962/quietways-engagement-next-steps
TfL Quietway 7 Programme (Elephant & Castle to Crystal Palace) - Proposed changes in Lambeth - West Dulwich area
https://consultations.tfl.gov.uk/cycling/lambeth-q7-wd/
LCN23 Map:
https://www.openstreetmap.org/relation/2707#map=17/51.42643/-0.08336
What are Quietway?
London Cycling Design Standards, Chapter 1 (page 15):
Quietways “..are aimed at new cyclists who want a safe, unthreatening experience.” The key principles for Quietways include:
o Routes should be on the quietest available roads consistent with directness;
o Routes should be as straight and direct as possible;
o where they have to join busier roads, or pass through busy, complicated junctions, segregation must be provided;
http://content.tfl.gov.uk/lcds-chapter1-designrequirements.pdf
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Hungate Bridge at the Navigation Road end is heavily bollarded on one end people on bikes and variants and people on foot are forced into a narrowed corridor by bollards. Yet, the width of he route is not restricted on either side.
It is unnatural and unnecessary. It brings people on bikes and variants into contact with each other and with people on foot or in wheelchairs, etc. It seems to be 'traffic-calming'. To my mind this undermines active travel messages and initiatives by making movement more complicated and fraught for all users.
Created by John Metcalf // 1 thread
"Hertfordshire County Council (HCC) has recently undertaken a feasibility report to investigate cycle links to the new Verulamium Park (Ver Park) Route link to NCN 6 from the King Harry Lane area. We have looked at ways to improve the cycling and walking environment; particularly where this would improve the continuity of cycle routes and the movement of people via active modes around your area. A section of shared use cycle route has been recently provided by the developer Linden Homes and the intention is to extend this facility to Abbey Avenue and northwards towards The Ramparts via an upgraded traffic signal crossing point into Verulamium Park.
The proposals include the following:
· Upgrade the existing traffic signal controlled crossing near Verulamium Park access to a Toucan Crossing,
· To provide improvements to the footway areas on both sides of the traffic signal controlled crossing to make it both suitable for pedestrians and cyclists, and linking into the new section of shared use footway/ cycleway that the developer has recently provided.
· To the south of the new roundabout, on the western side, the existing footway will be widened from 0.9-1.1m to 2.5m to continue the shared use route towards Abbey Avenue.
To upgrade the existing uncontrolled crossing at King Harry Lane jw Abbey Avenue by increasing the widths of the existing pedestrian refuge to widths that can accommodate both cyclists and pedestrians.
This option has been carefully evaluated and full consideration has been given to the likely effects that it may have on residents.
Please find attached a plan which shows details of the proposed scheme for Ver Park Highway Link (Cycleway/ Footway).
At this stage we are intending to implement the proposals during the next financial year, 2014/15.
As such we are now finalising the design and we are interested in hearing your views or any comments you may have regarding the proposals"
Initial comments by John Metcalf
Overall to be welcomed as better than what is there already. But, it could be improved?
1. Traffic entering Abbey Avenue is likely to be going too fast for a safe crossing for those walking or cycling. This is a rat-run to avoid the King Harry roundabouts. Therefore tighten the radii of the junction and make a raised crossing (on a hump). Do we want a Tiger (Zebra for walkers and cyclists) crossing?
2. The crossing of the new roundabout exit into King Harry Park is hazardous. It needs to be upgraded with a humped crossing (and a Tiger?). Is this sufficient or should there also be measures to slow down the traffic entering and leaving King Harry Park.
3. The best solution would be to upgrade the ROW footpath from the toucan crossing of King Harry Lane to Rowlatt Drive
Created by Jack Thurston // 1 thread
Cycle Route 46 from crosses the old stone bridge across the River Usk between Abergavenny and Llanfoist. There are good, safe and direct cycle paths on either side of the bridge, but the bridge itself is very hostile for cycling, and walking. It is on the A4143 and there is heavy often fast traffic most times of the day. The footway is very narrow and only on one side of the bridge. Although short, this is a difficult section to negotiate, especially for inexperienced or young cyclists.
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Route proposal for the link from Prospect Road/Verulamium Park to the start of the Alban Way.
The route is a shared, wide, pavement with a width around 3 metres- in line with minimum width for a shared route.
Documents are available at http://www.stalbans.gov.uk/planning/Planningpolicy/greenring/hccsiteb.aspx
Please have a look at the thread on this as there are a few point which STACC will bring out, you may want to consider these in your response.
Please return any comments to Clare Martin via phone, email or post.
Please also contact Clare if you have any further queries about the proposed works.
Clare Martin
Project Engineer, Integrated Transport Planning
Highways
Postal Point CHO317
Hertfordshire County Council, Leahoe Annexe, Pegs Lane, Hertford, SG13 8DN
t: 01992 658478 Comnet / Internal: 58478
email: Clare.Martin@hertfordshire.gov.uk
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Guy Hill // 1 thread
If it is not bad enough in a cycle city that the Great Northern Road, the new road to Cambridge's main train station and cycle parking, does not have a segregated and safe cycle paths, the new development is now being proposed which will prevent a segregated cycleway from access to the Station a Devonshire road.
Does anyone agree that there should be a segregated cycle access to the country's largest cycle park?
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The A4143 heading up towards the Hospital is plenty wide enough for a dedicated cycle path on one side or the other (we suggest the west side). This is often a busy and fast road. (Note this this would also solve the safe cycle access to the climbing wall and softplay.)