Cycle right turn from Alma Cut into London Road
Cycle right turn from Alma Cut into London Road (make a gap in the centre island)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Angela Dyer // 0 threads
Cycle right turn from Alma Cut into London Road (make a gap in the centre island)
Created by Angela Dyer // 0 threads
Contraflow on Black Cut from Old London Road to London Road
Created by Angela Dyer // 0 threads
Convert firm track (nominally a f/p) from Pipers Lane to Ferrers Lane to a bridleway. Avoids having to use narrow hedged lanes and a bit of climbing. (South of Harpenden)
Created by Angela Dyer // 1 thread
Make sunken drain safe on Alban Way junction at Smallford Bridge
Created by Angela Dyer // 0 threads
Safer crossings of Highfield Lane between the two parts of Highfield park
Created by Angela Dyer // 0 threads
Safer crossings of Highfield Lane
1. between the two parts of Highfield park and
2. where the cycle route crosses the Lane.
Created by Angela Dyer // 0 threads
Footway at junction Old London Road/Approach Road/London Road to be made dual-use with dropped kerbs
Created by Angela Dyer // 0 threads
Convert footpath across The Wick to dual use.
Created by Angela Dyer // 0 threads
Yellow lines to discourage parking on Ridgeway on-road cycle lane
Created by Angela Dyer // 0 threads
Cycleway/footway alongside A4147 St Albans to Hemel Hempstead
Created by Angela Dyer // 0 threads
Reduce vegetation to improve visibility on Alban Way between Camp Rd and London Rd. This is particularly an issue where footpath from Vanda Way crosses Alban Way
Provide a link from the Alban Way to hatfield road via the Hatfield road cemetry.
STACC member request May 2011
Created by mike1727 // 0 threads
Contraflow cycle lane on Marlborough Road from Victoria Street to London Road.
STACC member request May 2011.
Provides a connection to Sustrans route 6 and London Road cycle route at the Beehive juntion avoiding Lattimore Road and the Lattimore Road/London road junction.
Created by mike1727 // 0 threads
Provide a ramp alongside the steps to access the York Road railway bridge.
STACC member request from May 2011.
Enables a low traffic E/W link paralleling Hatfield road linking Fleetville to the north of the city centre.
Created by mike1727 // 0 threads
STACC member survey in May 2011 asked that this junction should be changed to allow cycles to use the "buses only" turning into St Michaels coming down Bluehouse Hill.
It provides a useful link from Bluehouse Hill into the Verulalium cycle routes.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Simon Nuttall // 3 threads
The annual university societies' fair is an opportunity to suggest to the student body the existence of the campaign.
Historically we get few students joining, but it can be a useful networking opportunity.
Created by Paul L // 1 thread
Raising and re-surfacing path that we have been complaing about since forever. Pity it isn't wider, doesn't go all the way to Mortlake Brewery and the White Hart has obstructive seating but still worth celebrating.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Created by Jim Chisholm // 5 threads
Issues regarding sharing of space on commons in central Cambridge
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Richard G // 1 thread
At a recent BUG-WAG* meeting, the Trust reported that the council will be modifying the Long Road/Adrian way junction.
Those of you that know the area will know that the exit from Addenbrooke's is 'no right turn' with a small shaped island to direct traffic westbound onto Long Rd
plans were shown to create a cutout in the small island for bikes to exit eastbound. Presuamably with signs to indicate this too
The trust said that suggestions to the junction would be welcome in the planning of further changes to Long Rd
Richard
*BUG-WAG - the Bicycle User Group, Walking Action Group of interested parties on the Addenbrooke's campus
Created by mike1727 // 0 threads
Reported in the Herts Advertiser w/s 30/09/13 http://www.hertsad.co.uk/news/secret_plan_for_new_school_on_harpenden_green_belt_1_2818938
"On Monday, the Herts county council’s (HCC) cabinet agreed to press ahead with the compulsory acquisition of up to 15 hectares of farm land on the corner of Common Lane, off Lower Luton Road."
"The acquisition would provide a development site for a new school with a capacity of six to eight forms of entry." <...>
"Cllr Chris Hayward, cabinet member for education, said if a decision is made to build on the site, it would go through a full planning application."
The site is on a busy road but close to route 57. Planning should include at least a good link to route 57 as well as more local routes to the north- and possibly off road route next to Lower Luton road.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by Martin A // 1 thread
This attractive former railway line would provide a useful off-road link between Ripley Greenway and Derby for commuters and leisure users.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Rob Archer // 1 thread
This is one of the most difficult and dangerous sections of the local cycle network. A point where cycle traffic to 2 local schools, a college and a local park all meet.
Fast heavy traffic
Very poor sight-lines
Cars parking over dropped kerbs
Any suggestions as to how it can be improved?
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?