Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
-
-
Cambridge Retail Park redevelopment
Railpen are consulting on changes to the Retail Park on Newmarket Road
-
DNA Cycle Path - Biomedical Campus to Shelford
Anything to do with the DNA path - lighting, vegetation, obstructions
-
Fallen Tree - At head height
Fallen Tree at head height - reported to Kent County Council - Fault Number 240650775
-
Foliage cutback - Fordwich Way
Recent FOI confirmed that foliage cutback should occur in ‘Bi-annually’ on the Fordwich Way route in May and September every year. No foliage cutback has taken place on the Fordwich Way in May. The whole path is slowly becoming overgrown and will need cutting back as per Kent County Councils own internal documents. The whole route needs foliage clearance - Fault No. 811012
-
24/01905/FUL Sidney St and Hobson St - office space, demolition of cinema
Creation of additional storey above existing single storey (middle) part of the site and redevelopment of rear part of the site comprising: demolition of existing building and structures and creation of five storey office building.
16 - 17 Sidney Street Cambridge Cambridgeshire CB2 3HG
Cambridge
Application reference : 24/01905/FUL
-
Driving on Mere Way
On a recent ride up The Mere Way I noticed that the wooden pillar had been removed and that cars were being driven on the route .
-
Better cycle parking at Canterbury Asda
The cycle parking at Canterbury's Asda is conveniently located for the shop entrance, but doesn't properly secure or support bicycles. Hence parts of bicycles go missing and cyclists choose to secure to other street furniture.
-
Cycle parking at Longmarket
Cycle parking provision at Longmarket needs to be improved. The are insufficient stands at Rose Lane, leading to cyclists using other street furniture, such as pictured.
-
24/00889/FUL Clarendon House
Partial demolition, alterations and extensions to Clarendon House, new ramped vehicular access, delivery bay, cycle access and parking, etc etc
Quite a lot of cycle parking, and some reduced car parking, in the basement. Cycle and car movements cross with potential visibility issues.
-
24/00922/FUL Erection of seven dwellings, with access, car and cycle parking
Erection of seven residential dwellings along with access, car and cycle parking, landscaping and associated infrastructure works following demolition of existing buildings.
195 Perne Road Cambridge Cambridgeshire CB1 3NT
Cambridge
Application reference : 24/00922/FUL
-
Quy Mill Planning Application 24/00688/LBC
Planning application not addressing cycling issues credibly.
-
Sidgwick Avenue: General condition and future
Poor surfacing of the road with potholes, cracks and very limited space for pedestrians
-
Milton Road Residents Parking
Cambridgeshire County Council is publishing this proposal on 18th March 2024.
-
Stapleford and Great Shelford Neighbourhood Plan
New thread to discuss proposals.
-
Darwin Green trees
The cycle lanes on this road have trees growing over them with many branches at eye height (as demonstrated by my glamorous assistant).
-
23/04289/FUL Construction of new science park building
Demolition of existing buildings and structures, and erection of building (Class E(g)i/ii) with associated access, site infrastructure, landscaping and car and cycle parking provision.
Brookmount Court Kirkwood Road Cambridge Cambridgeshire CB4 2QH
Cambridge
Application reference : 23/04289/FUL
-
24/00166/OUT Construction of a new business/science park
Outline planning application for demolition of existing buildings and construction of a new business/science park (Use Class E(g)) and ancillary "hub" building (Use Class E(b)(d)(f)) and associated car parking and landscaping.
Sawston Park London Road Pampisford Cambridgeshire CB22 3EE
South Cambridgeshire
Application reference : 24/00166/OUT
-
Fen Ditton village cycle path resurfaced with very uneven finnish .
Very uneven surface on cycle path between Fen Ditton village and Horningsea .
-
24/00384/FUL Change of layout to existing customer car park.
Change of layout to existing customer car park.
Land At Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire CB5 8WR
Cambridge
Application reference : 24/00384/FUL
-
22/04976/CONDB (Cycle parking)
Submission of details required by condition 10 ( hard and soft landscape works) and 11 (Cycle parking) of planning permission 22/04976/FUL
26 Barton Road Cambridge Cambridgeshire CB3 9JZ
Cambridge
Application reference : 22/04976/CONDB
-
23/03273/FUL and 23/03273/COND7 east of NMR P&R
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
-
Fallen Tree CC24 - Fordwich Way
Fault Number: 779265
-
Fallen Tree Fordwich Way
Fault Number: 779261
-
Missing dropped kerb at northern end of Legacy Park cycle path
There isn't a dropped kerb at the northern end of the Legacy Park cycle path where it meets Chaucer Road. Therefore cyclists can't easily transition between the cycle path and the road here.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
Beaumont Square Consultation
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Residents of Beaumont Square and the surrounding area raised concerns about rat-running and the problems it causes in local streets. You may remember that the Council previously consulted residents on traffic management proposals to reduce traffic speed in the area; many of which were strongly supported and have now been implemented. A number of additional ideas were also put forward by residents which have now been considered and we would appreciate your opinion on whether they should be introduced.
One of the problems is the level of traffic trying to avoid the traffic lights at the A11 Mile End Road/White Horse Lane junction. Drivers cut through either Beaumont Square or Eastbury Terrace through to Beaumont Grove to join A11 Mile End Road junction causing safety concerns, particularly for the nursery and nuisance to local properties. In addition, Beaumont Grove suffers problems relating to parking for surrounding shops and takeaways.
-
Refuge for right turn into shared-use space
A shared-used area runs parallel to Park End Street across Frideswide Square, fronting the Saïd Business School. This offers an alternative approach to the station, and allows cyclists approaching from the city centre to avoid manoeuvres across two roundabouts.
There is however a lack of a properly aligned, clearly marked refuge between the two streams of traffic on Hythe Bridge Street at the point where cyclists would seek to cross into this shared space.
-
Ancoats & New Islington regeneration strategy
Manchester City Council Development strategy for the Ancoats and New Islington Areas. Includes development and urban design principles, and will be a "material consideration" in determinng planning applications.
A recent announcement about the funding of 6000 new residential units by ADUG in this part of Manchester increases the need to ensure that cycling is given due prominence in this strategy. -
Healthy Hospitals need to consider Cyclists
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
-
Extend cycle path parallel to A92 south of Stonehaven to be full distance between junctions
The A92 here has some very fast traffic. Considering this is the flagship National Cycle Route 1, and there is already a cycle path of part of the way between these 2 junctions. It would be much better if this cycle path was continued to the next junction, with some crossing aid in the form of traffic lights, bridge or tunnel. This would open this part of the route to a wider range of participants, as it would be significantly safer.
-
BARNSTAPLE TOWN CENTRE - FIVE YEARS PLAN
20 mph speed limit for Newport area, enclosed by the river Taw, The Square, Belle Meadow Road, Inner Relief Road, Hollowtree Road, South Street and Park Lane.
-
Upper Marshall Road Cyclepath
At present this is a footpath but it could be widened onto the land owned by Network Rail in order to allow a shared use path.
-
High-Petergate one-way
Like Fossgate, High Petergate needs to be made two-way for cyclists. Otherwise cyclists travelling north are forced to either get off and walk (not an option for disabled cyclists) or join the busy St Leonard's place via a difficult junction.
-
Romford 20mph zone
Havering council said:
"We wrote to you on 21st October setting out a series of safety proposals for Romford town
centre comprising of a 20mph zone for all streets within the Romford Ring Road (including
some traffic calming measures) and some changes to road markings on various
roundabouts on the Ring Road itself.
We sent out over 2,500 letters to people in the area, but only received 8 responses with 4
of these being from residents. This was reported to the Council’s Highways Advisory
Committee on 6th December where the decision on the scheme was deferred in order for
further discussions to take place with ward councillors.
As a result of these discussions, it has been decided to provide a further period of
consultation and any other comments received shall be reported to the Highways Advisory
Committee on 7th February 2017.
We would therefore like to extend the opportunity for you to provide any comments you
may have to the postal address above, via our email address highways@havering.gov.uk
or through an online form which we have provided at www.havering.gov.uk/consultations." -
Chrisp Street Corridor
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Influencing positive changes in road user behaviour is key in providing a safe road environment for the community and although changes in road layout can’t fully resolve this, redesign of our streets can help. Therefore, Chrisp Street and the surrounding areas are currently being invested in with aims to improve road safety for the local community.
Please give us your feedback by filling in the survey (below the map). You may also like to add a comment to our interactive map of the wider area.
-
Coldham's Lane / Cromwell Road junction
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
-
A23 Streatham Hill Cycleway
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
- High quality segregated cycle lanes and bus stop bypasses throughout the extent of the scheme
- Straight-across pedestrian crossings relocated to be where people want to walk and cross the road
- Zebra crossings proposed to cross the cycle lane to signalised pedestrian crossings across the main carriageway
- 2 additional pedestrian crossings
- Bus lanes maintained or implemented and operational hours extended to between 07:00 - 19:00 Monday to Saturday throughout the scheme
- 20mph speed limit throughout
- Changes to side road access including restrictions and closures, redesign and resurfacing
- New traffic signals at the Telford Avenue junction
- Improvements to public realm throughout the route, unlocking areas by removing central brick build planters and planting of new trees and landscaping
- Changes to some parking and loading provision
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
-
Portsdown Hill & James Callaghan Drive - Needs Segregated Cycleway
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there. -
Cycle route frequently obstructed by cars
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
-
Hostile driving on Red Cross Lane
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
-
Southern end of Foundation Street should stay closed
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.
-
South Worple Way - obstruction
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
-
Link Annan Road and Lockerbie Road
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
-
Poor road surface on Stockport Road (Nbound) after Plymouth Grove junction.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
-
Toton HS2 development consultation
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
-
Parking on Canal Road
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
-
Cherry Hinton High Street cycle lanes need upgrading
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
-
Belmont Viaduct
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city. -
Maple Cross to Rickmansworth cycle route is one-way along Berry Lane, Mill End
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
-
Route to the High St. via Loreburne Centre entrance
At the moment there are toucan crossings from the Whitesands up to the High Street past the lower entrance to the Loreburne Centre (where the buses stop) but there is no actual cycle path so you end up illegally on the pavement. It would be a useful route otherwise, as long as cyclists can get past the bus stops (and waiting bus passengers).