Queens St/Princes St loop Consultation
The formal consultation has now been set to run from Tuesday 25th February to Saturday 1st March.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Shaun McDonald // 3 threads
The formal consultation has now been set to run from Tuesday 25th February to Saturday 1st March.
Created by David Earl // 1 thread
Outline application for up to 69 residential dwellings including houses and apartments, open space, landscaping and new access. | Field At Corner Of Coldhams Lane And Hatherdene Close Cambridge Cambridgeshire
New junction onto Coldhams Lane proposed, which includes a central island, the gap on the westbound side is 3.1m, about the worst possible for cyclists.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Created by Peter Lawrence // 2 threads
Please sign my change.org petition http://chn.ge/1epSzpK
Accident CC-23012014-0561 (Incident logged by the Cambridgeshire Police)
Leaving Zoology Department 18.15 walking east on Downing St, north side on 23 January, 2014. Car stopped in Downing st just west of Corn exchange road junction, obscuring the light. Lying on the road was a road sign warning cars of road works further left in Corn Exchange St, a needless warning. This 1 metre road sign had been placed on the pavement, occluding it seriously and had been, presumably, knocked over and left lying on the pavement with its black and invisible legs raised up about 10cm from the surface and its reflective surface tilted away (see picture). I tripped over the road sign in the dark and fell forwards injuring my face and forehead; the metal cut into my right leg. My glasses are destroyed, the leg of the sign tore my shoes.
I was taken to Addenbrookes and treated there. I left there ca 20.30 with head injuries and abrasions and now have an impressive black eye and surround.
I am seeking redress. I am exploring legal action against the County Council whose idiotic health and safety rules (for drivers, not for the rest of us) say that drivers should be warned in advance of even highly visible roadworks (in a 20mph area) and the company responsible for placing such a flimsy and dangerous sign right in the middle of a narrow pavement. Also am anxious that in general people who leave road traffic signs occluding the pavement or creating dangerous obstacles there, should be held responsible and penalised. I see these road signs often as I walk around Cambridge, they should be on or above the road, not blocking the pavement in my opinion.
The next day the same road sign, with my blood still on it, was back in the middle of pavement waiting to be knocked over again and even now forcing pedestrians to avoid it by diverting on to the roadway. I attach a photo of it taken on Friday the day following my accident with a diverted pedestrian on the right.
It was again fallen on the ground waiting to kill someone on Saturday night, presumably following the afternoon storms.
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Charlie Halliday // 1 thread
Proposed off-road cycle path following the A323, Norris Hill Road, to link Fleet with the existing cycle-path from Norris Bridge towards the centre of Farnborough.
It would enable cyclists to avoid Norris Hill Road, an unlit road with speed limit of 60 mph. Once built it would be possible to cycle from Fleet to Farnborough without cycling on roads.
This is in the Fleet Town Access Plan ref. PC9
Created by Jean Dollimore // 1 thread
The image above is an extract from the map published by TfL on 18th Dec 2013; showing the GRID routes in Camden with some of the names of the roads added. We should reply to the documents at:
http://www.tfl.gov.uk/roadusers/cycling/29172.aspx
Deadline 14th February 2014
Created by TMiles // 0 threads
The route marked between Headingley and Armley is heavily used as an intra-urban connector between north west and south west Leeds. Congestion can be particularly acute because it uses one of the few crossing points over the River Aire and the Leeds and Liverpool canal in the west of the city.
The addition of cycle lanes in both directions along the length of this route has the potential to encourage a modal shift from cars and make a real impact on congestion. These cycle lanes would help to establish a more comprehensive network outside the radial routes, and would be a useful on-road addition to the Leeds Core Cycle Network (forming itinerary Ar - W). The proposed route offers connections to the improved cycle facilities on Kirkstall Road (A65) and the future CityConnect facilities.
The addition of cycle lanes would be of particular benefit to uphill cyclists, minimizing their conflict with motorists.
In addition to the environmental, economic and health benefits, the project would improve car-free mobility between three very different communities in Leeds: Headingley, Hyde Park and Armley.
The width of the pavements along the northern sector would allow for a widened carriageway in order to accommodate the cycle lanes. The loss of pavement width would be outweighed by the benefits of calmed traffic. The carriageway of the southern sector is already generous and would make the implantation of cycle lanes relatively straight forward.
Created by Shaun McDonald // 2 threads
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Norwich Road, Vallet Road, and Chevallier Street. This is a major route for people travelling north in and out of the city.
Created by Shaun McDonald // 1 thread
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Felixstowe Road, Nacton Road and Bishops Hill. It's a cross roads with one significant use arm at a 30 degree angle
Created by Shaun McDonald // 1 thread
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Woodbridge Road and Argyle Street. It is a t-junction of which 2 arms are one way and part of the gyratory.
Created by Richard Moss // 1 thread
An umbrella issue for discussion of general matters relating to reviewing planning applications in the city and south cambs.
Created by Hester Wells // 5 threads
The County Council is planning to redesign Tenison Road.
East Parade forms part of the one-way Leeds city centre loop. On the stretch shown it is three-lanes wide, a layout that encourages cases of excessive speed.
The addition of a wide hybrid or segregated cycle lane would improve cycle journeys from the railway station and the south of the city towards the Universities, hospital and north of the city.
Towards the junction with the Headrow the segregated system will end to allow cycles and vehicles to correctly position themselves to turn left or go straight ahead. In this final section the road surface should read, from left to right: (1) cycle lane, turning left (2) standard vehicle lane, turning left (3) cycle lane, straight ahead (4) standard vehicle lane, straight ahead (5 - if space permits) standard vehicle lane, straight ahead. Nevertheless, the layout should allow cycles continuing straight across to adopt their position without conflict from left-turning vehicles. An example of such markings can be seen in Cambridge (Hills Road railway bridge, inbound) or in Nantes (http://www.flickr.com/photos/cyclable/9526360512/).
Provision for delivery vehicles should also be considered here, as the left hand lane is frequently occupied by vans or lorries under the current system. To avoid conflict with cyclists, it would be most sensible to site such parking to the right of a segregated cycle lane.
The project would bring additional traffic-calming benefits, with the reduction of the road width to two lanes along much of its length.
Created by TMiles // 0 threads
The width of the road after the traffic lights lures south-west bound cycles into a left position that becomes problematic because of the build-out at the later pedestrian crossing. They either have to stop to let traffic pass through this pinch point or take the risk of readjusting their path to the right in order to join the main stream of vehicles.
One solution would be to guide cycles into the correct position with cycle lane markings from the traffic lights to the pedestrian crossing.
The second solution would be to cut a cycle-lane across the build-out, including a mini pedestrian crossing that cyclists would have to respect. This short stretch of lane should be flush with the road surface and must be kept swept regularly in order to be effective.
Created by Shaun McDonald // 1 thread
The cycle lane on NCN1 on Stoke Park Drive are rather narrow, thus you cannot cycle within the cycle lane. Having the cycle lane there means drivers often don't give as much space when overtaking. There are also many traffic island pinch point which make it extremely dangerous, as drivers overtake and cut in just before the island.
Created by MJR // 1 thread
"The adopted Core Strategy designated South East King’s Lynn (this area) as one of the strategic ‘urban expansion’ areas around King’s Lynn. The independent planning inspector who examined the Core Strategy explicitly stated that, compared to the potential alternatives, the expansion areas identified (including South East King’s Lynn) were preferable to the alternatives in meeting the Borough’s need for substantial numbers of additional dwellings over the plan period. It is relatively unconstrained by flood risk and infrastructure problems, etc., and relatively easily accessed and serviced.
5.2.4 Policy CS09 of the Core Strategy, ‘Housing Distribution’, provides for an allocation here of at least 1600 new homes, with supporting infrastructure. It also identifies this as establishing a direction for future growth beyond the plan period (i.e. beyond 2026). From the sites put forward during the consultation, informed by the work of the Prince’s Foundation for the Built Environment in connection with the Neighbourhood Plan (see below) a total of 3,000 to 3,500 additional dwellings could be accommodated in the fullness of time. This is indicated diagrammatically in figure 7 of the Core Strategy.
5.2.5 This is likely to be the largest residential development opportunity in the Borough for many years. It provides a once-in-a-generation opportunity to form a thriving and vibrant new community immediately south of King’s Lynn. The intention is to integrate a large number of new homes and associated facilities with an existing village community, generate a range of major improvements in a range of areas, and shape a place that promotes a sense of community among its residents, existing and new." (From the Borough Council KLWN, "Preferred Options for a Detailed Policies and Sites Plan", October 2013)
Created by Kevin Ablitt // 0 threads
The west bound ( out of town ) on-road cycle lane is extremely narrow. As are the motor vehicle lanes to accomodate eastbound bus lane. There is plenty of space on verges etc to improve this facility but may mean moving lampposts etc.
Created by Kevin Ablitt // 1 thread
Very narrow carriageway and very narrow footpath on one side only ( I have seen a woman struck on the shoulder by a bus mirror on this route).
High number of pedestrians and cyclists at peak times, poor visibility and abrupt hill make this a very dangerous route.
Created by Kevin Ablitt // 0 threads
Very narrow and winding. This section of Stone Lodge Lane should be considered for reduced access, one way, filetered permeability or complete closure to motor vehicles.
http://www.ipswichstar.co.uk/news/ipswich_child_injured_after_collision_on_stone_lodge_lane_1_3211524
This isnt the first such incident.
Created by Matthew Phillips // 2 threads
The Mount Oswald development received outline planning permission a while ago. A full application has already gone in for the first phase, at the southern end of the site. It appears connections will be provided for cyclists and pedestrians to the A167 (car access is from South Road). The greater concern is whether an opportunity is being missed to create a new off-road route parallel to South Road.
The picture is taken from the Design and Access Statement of the planning application for the first phase. The big unknown is the middle area, where the large self-build houses will be. No plot divisions are shown on the plan. Will there be public access north-south through this area?
South Road is not shown as a strategic cycle route in the County Durham Plan. The Mill Hill Lane route and the A167 are accorded the status of primary routes, but there is not even a secondary route along the South Road axis, despite it being the obvious route to the University from the south and from all the new housing on Mount Oswald.
Created by Matthew Phillips // 1 thread
The cycle path across the top of the golf course has no barriers at either end but does not seem to suffer from abuse by motorcyclists. However at two or three locations along the path there are staggered half-barriers on paths which lead to the housing estate to the north.
Barriers like this cause problems for longer cycles, such as tandems and recumbent cycles, as well as for families with child trailers or tag-alongs. Such barriers should preferably be removed and we need to seek to ensure that new developments do not introduce further barriers.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Martin Lucas-Smith // 2 threads
This junction has a new cycle lane over a widened pavement. This looks like very substandard infrastructure, encouraging pavement cycling, that should never have been approved by the County Council.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Peter Loader // 1 thread
Petition to Three Rivers District Council:
“Please would you deliver a programme of safe cycle routes to our schools, using a substantial increase in the cycling budget of the Community Infrastructure Levy.
(This Levy will become payable by developers).”
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Dawes Jaguar // 1 thread
The distance between the cycleway and Vincent Drive is a couple of metres. It is illegal for people to cycle this distance because the connection is via a zebra crossing. This is backed up with a CYCLISTS DISMOUNT sign. This is absurd and needs to be corrected.
There is also an obstructive pavement-mounted tree at this location. There is plenty of space for trees just a couple of metres to the right, so the tree should be removed and a new one planted in the grassy area.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by Simon Redding // 0 threads
The barrier in the photo blocks the route where NCN67 joins Storforth Road at the end of the Rother Washlands in Chesterfield.
Perhaps the council was trying to be safe here, but since it's not a well lit area, a cyclist travelling this way at night might well have a nasty accident flying over this barrier.
Created by acsimpson // 1 thread
The traffic island on Maybury Road at the Maybury Junction is too small to accommodate cyclists (especially those pulling child trailers, etc) other than at it's extreme southern end. As this is a two stage crossing it can lead to either the need to cross when red or wait partly blocking the carriageway.
The light timings need changed to allow a full crossing at once or the island needs to be extended.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Simon Redding // 1 thread
There's no clear desire line or route west of Linacre/Holymoorside to join up to Chatsworth/Baslow/Rowsley/Beeley. This is a clear link to join Chesterfield mainline rail station to the Peak District.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.